HM - Wakeley Lake Dam Structure Replacement Project

Awarded Award Notice Posted

Solicitation number
AG-569R-S-14-0017
Agency
Region 9 - Eastern Region Forest Service, Department of Agriculture
Awarded
to John Henry Excavating Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-569R-P-14-0022 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Wakeley Lake Dam Mio Ranger District Crawford County Mio, Michigan 48647, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Mar 27, 2014 9:17 am Modified: Apr 14, 2014 7:09 amTrack Changes

An organized site visit has been scheduled for May 8th, 2014 at 10:00 a.m. EST.
Participants will meet at the gate on S. Wakeley Bridge Road, parking on the side of the road.  Look for a white F-150 with a Forest Service Logo on it.  The visit will include a .75 mile walk through woods to the project site.

Starting date of this contract will be contingent on the receipt of applicable State Permits which have been applied for by the Government.


The Huron-Manistee National Forest is announcing an opportunity to bid on a project to replace a water control structure, rehabilitate an emergency spillway and complete minor dam maintenance on the Wakeley Lake Dam in Crawford County, Michigan. This acquisition is advertised as a HubZone small business set-aside. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $25,000 and $100,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $33.5 million.


Contractors are required to be actively registered with the System for Award Management (SAM) database and completed their online representations and certifications.


Bacon-Davis wage rates will apply to this contract.


This IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis, the pending solicitation or any follow up information requests. The solicitation will be posted to the FedBizOpps website on or about April 14, 2014. No hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website. Contract estimated completion date is July 3, 2014.


The scope of work includes, but is not limited to, soil erosion control, cofferdams, excavation, bedding aggregate, placement of precast concrete box culvert and water control structure including metal grate and composite stop log, backfill, riprap, and turf establishment. Contractor must provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, permits, certificates, insurance, temporary protection and other items designated under provisions of this contract necessary to complete the entire project per specifications and in the established timeframe.


Contracting Officers Representative for this contract is: James Strezishar, 231-775-5023, Ext. 8738.


 


 

Update #1 ·

Added: Mar 27, 2014 9:17 am

The Huron-Manistee National Forest is announcing an opportunity to bid on a project to replace a water control structure, rehabilitate an emergency spillway and complete minor dam maintenance on the Wakeley Lake Dam in Crawford County, Michigan. This acquisition is advertised as a HubZone small business set-aside. In accordance with FAR Part 36.204(b), the estimated magnitude of construction is between $25,000 and $100,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The Small Business Administration size standard is $33.5 million.


Contractors are required to be actively registered with the System for Award Management (SAM) database and completed their online representations and certifications.


Bacon-Davis wage rates will apply to this contract.


This IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis, the pending solicitation or any follow up information requests. The solicitation will be posted to the FedBizOpps website on or about April 14, 2014. No hard copies of the solicitation, supporting documents and applicable amendments, if any, will be provided. To receive the entire solicitation package and any applicable amendments, prospective offerors must download them from the FedBizOpps website. Contract estimated completion date is July 3, 2014.


The scope of work includes, but is not limited to, soil erosion control, cofferdams, excavation, bedding aggregate, placement of precast concrete box culvert and water control structure including metal grate and composite stop log, backfill, riprap, and turf establishment. Contractor must provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, permits, certificates, insurance, temporary protection and other items designated under provisions of this contract necessary to complete the entire project per specifications and in the established timeframe.


Contracting Officers Representative for this contract is: James Strezishar, 231-775-5023, Ext. 8738.


 


 

Attachments

Files attached to this notice, newest first
File Type Posted
Q A_from_Pre-Bid_Meeting_Site_Visit.docx DOCX document
Attachment_4_-_Experience_Questionnaire.doc DOC document
Attachment_3_-_MI42_dvb.mht MHT file
AG-569R-S-14-0017.rtf RTF text file
SF_1442_Form.pdf PDF
Attachment_1_-_WakelyPlans.pdf PDF
Attachment_2_-_Detail_Map.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity