Q A_from_Pre-Bid_Meeting_Site_Visit.docx

DOCX document 14 KB Posted

Attached to
HM - Wakeley Lake Dam Structure Replacement Project Federal contract opportunity
Solicitation number
AG-569R-S-14-0017
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Questions Answers

View the file

Other files for this federal contract opportunity

Other files attached to HM - Wakeley Lake Dam Structure Replacement Project, newest first.
File Type Posted
Attachment_2_-_Detail_Map.pdf PDF
SF_1442_Form.pdf PDF
Attachment_1_-_WakelyPlans.pdf PDF
Attachment_4_-_Experience_Questionnaire.doc DOC document
Attachment_3_-_MI42_dvb.mht MHT file
AG-569R-S-14-0017.rtf RTF text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions from Pre-Bid Site Visit

1) What is the length of existing Sheet pile? Appx 21’

2) What is the elevation of the lowest top of sheet pile? 1097.35’

3) Will a culvert be permissible for dewatering? Water must be pumped for dewatering passed through a filter bag per DEQ Permit Requirements

4) Does the contractor have to pay or reimburse the government for the cost of the permit? No, permit has been applied and paid by the government. Contract bears no responsibility for acquiring permit, but must abide by it when received.

5) Is the bid submission date the 12th or 14th of May? May 14th

6) How to submit proof of payment protection electronically? A scanned copy is sufficient for bidding, the successful winning party will submit the original to CO for award.

7) Concrete may not be buried on site for disposal