Highway 149 Stewardship Project

Award Notice Posted

Solicitation number
AG-82MK-S-15-9001
Agency
Awarded
to Montrose Forest Products LLC
Set-aside
No set-aside

Opportunity facts

Contract number
AG-82MK-C-15-9001 Federal contract award
NAICS code
115310 Support Activities for Forestry
PSC
Not on record
Place of performance
Colorado State Highway 149 Lake City, Colorado, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: Feb 10, 2015 3:40 pm The AGAR Fire Liability clause was inadvertently omitted from the solicitation.  It is included here as an attachment and will be incorporated in any subsequent award.

An SF30 Solicitation Amendment will not be issued.

All other terms and conditions remain unchanged.

Update #3 ·

Added: Feb 03, 2015 6:01 pm ALL QUESTIONS REGARDING THIS SOLICITATION MUST BE RECEIVED BY 5:00PM MOUNTAIN TIME ON FEBRUARY 13,2015 SO THAT THE QUESTIONS AND GOVERNMENT'S RESPONSE CAN BE PUBLISHED IN AN AMENDMENT BY FEBRUARY 18, 2015.

Update #2 ·

Added: Feb 03, 2015 3:57 pm The solicitation package is now posted.

Update #1 ·

Added: Jan 13, 2015 12:45 pm The USDA Forest Service, Grand Mesa-Uncompahgre-Gunnison NF, anticipates issuing a Request for Proposals in late January 2015 for the Highway 149 Stewardship project. The award will be an Integrated Resource Service Contract (IRSC) with a planned completion date of December 31, 2017.

The solicitation and any resultant IRSC is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit the Government's method of trading goods for services.

All future information about this acquisition will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition.

Respondents are required to be registered in the System for Award Management (SAM) at www.sam.gov to be eligible for award. This solicitation is a full and open competition; all responsible sources may submit a response to this announcement which will be considered by the Government.

The proposed contract will include 18 base units totaling 329 acres.  Treatment units include a mix of timber removal and service work (see attached table for details).

The project area is located approximately eight miles southeast of Lake City, Colorado along State Highway 149.

All units can be accessed from State Highway 149 as shown on the attached map. The legal description is as follows: Sections 8, 9, 14, 15, 16, 17, 18, 21, 22, 23, and 27; Township 43 North, Range 3 West; New Mexico Principal Meridian; Hinsdale County, Colorado.

Contractual activities will be prohibited in units 27, 29, 30, 34, 35, 37, and 38 between December 15th and May 1st due to topography limitations and to prevent conflicts with winter recreation activities, unless a plan to mitigate these conflicts is submitted and accepted in writing by the Gunnison District Ranger.

The contractor will be required to maintain approximately 0.85 miles of Forest Service road during the life of the contract.

Expected timber volume to be included in this project is approximately 7,762 CCF (hundred cubic feet) of dead Engelmann spruce saw-timber.

Required service work will involve machine cutting and piling or scattering (depending upon the contract unit) of non-commercial conifer as shown in the table.

No pre-bid site visit is planned; however, all potential bidders are urged to visit the area to familiarize themselves with the area's topography and access. The Colorado Department of Transportation (CDOT) maintains State Highway 149 year-round, including snowplowing.

The Forest Service has obtained 11 temporary access permits from CDOT for the purposes of constructing (and subsequently obliterating) specified temporary access roads directly off State Highway 149. As per these CDOT permits, the contractor shall be required to obtain comprehensive general liability and property damage insurance naming CDOT as an additional insured party, in amounts of not less than $1,000,000 per occurrence and automobile liability insurance of $1,000,000 combined single limit bodily injury and property damage for each accident. The cost for additional insurance will be included in the contract price.

Additionally, the contractor will be required to submit traffic control plans for FS and CDOT approval, and will be required to supply signage and state-certified flaggers. The costs for traffic control will be included in the contract. The Forest Service will provide two solar powered electronic message boards for the purposes of traffic control.

Please direct any questions to Jay Tobin, Contracting Officer, at jtobin@fs.fed.us.

Files

File Type Posted
Fire_liability_clause_AGAR_452_236-78.docx DOCX document
fs_6500_25.doc DOC document
fs_6500_24.doc DOC document
Solicitation__AG-82MK-S-15-9001.pdf PDF
Highway149AppendixB.pdf PDF
Highway149AppendixD.pdf PDF
Area_Photos.pdf PDF
SCA_WD.pdf PDF
Highway149_CAM2.pdf PDF
Highway149AppendixA.pdf PDF
Road_Drawings.pdf PDF
Highway149AppendixC.pdf PDF
Highway149_Project_Map.pdf PDF
Summary_of_Services.pdf PDF
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity