HELENA-LEWIS & CLARK NATIONAL FOREST - Warehouse Siding Replacement and Insulation
Award Notice Posted
- Solicitation number
- 12034318Q0308
- Agency
-
Region 1 - Northern Region
Forest Service, Department of Agriculture
- Awarded
- to Hfes LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12034318C0113 Federal contract award
- NAICS code
- 238170 Siding Contractors
- PSC
- Not on record
- Place of performance
- Rocky Mountain District Office Augusta Work Station 303 Manix St Augusta, Montana 59410, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Awarded Vendors: HFES, LLC. Contract Award Dollar Amount: $85,655.00. Contract Award Date: 2018-09-14.
Update #2 ·
This project is for the replacement of existing wood siding, trim, soffits, and gable vents on the Augusta Warehouse with a new Fiber-Cement siding system. Finished Fiber-Cement siding and trim color, texture, and appearance shall match the existing configuration. Scope of work includes, but is not limited to, removal of the existing siding, trim, soffits, fascia, gable vents, and wall cavity insulation; and the installation of all new exterior wall sheathing, weather barrier, Fiber-Cement siding, trim, vented soffits, fascia, and gable vents.
Contractor is also responsible for the disposal of an abandoned electrical meter base and replacement of two exterior receptacles.
ADDITIONAL ITEM #1: In addition to all work included in the base, additional item 1 adds the following work items;
1. Install 1 inch thick rigid insulation between weather barrier and new concrete siding.
2. Install wood furring strips as required for rigid insulation installation.
ADDITIONAL ITEMS #2: In addition to all work included in the base and additional item 1, additional item 2 adds the following work items;
1. Install spray foam insulation in all exterior 2x4 wall cavities.
2. Add R-38 to the attic above the east bay
Magnitude of Project (per FAR 36.204(b)): Between $25,000 to $100,000.
There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their quote.
.
Update #1 ·
This is a PRESOLICITATION announcement. The solicitation is anticipated to be posted to Federal Business Opportunities on or around August 10, 2018.
This project is for the replacement of existing wood siding, trim, soffits, and gable vents on the Augusta Warehouse with a new Fiber-Cement siding system. Finished Fiber-Cement siding and trim color, texture, and appearance shall match the existing configuration. Scope of work includes, but is not limited to, removal of the existing siding, trim, soffits, fascia, gable vents, and wall cavity insulation; and the installation of all new exterior wall sheathing, weather barrier, Fiber-Cement siding, trim, vented soffits, fascia, and gable vents.
Contractor is also responsible for the disposal of an abandoned electrical meter base and replacement of two exterior receptacles.
ADDITIONAL ITEM #1: In addition to all work included in the base, additional item 1 adds the following work items;
1. Install 1 inch thick rigid insulation between weather barrier and new concrete siding.
2. Install wood furring strips as required for rigid insulation installation.
ADDITIONAL ITEMS #2: In addition to all work included in the base and additional item 1, additional item 2 adds the following work items;
1. Install spray foam insulation in all exterior 2x4 wall cavities.
2. Add R-38 to the attic above the east bay
Magnitude of Project (per FAR 36.204(b)): Between $25,000 to $100,000.
There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their quote.
.
Files
| File | Type | Posted |
|---|---|---|
| 12034318Q0308Amend001.pdf | ||
| 12034318Q0308WD.pdf | ||
| 12034318Q0308.pdf | ||
| 12034318Q0308Drawings.pdf | ||
| 12034318Q0308EQ.pdf |