Heated (45 °C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller.

Closed Solicitation Posted

Solicitation number
RFQ450899
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Oak Ridge, Tennessee 37830, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Oak Ridge National Laboratory, operated by UT-Battelle, LLC under the Department of Energy, is seeking quotes for specialized laboratory measurement equipment including heated (45°C) absolute Baratron capacitance manometers, power supply and readout units, shielded cables, and digital mass flow controllers. The procurement requires vendors to submit firm fixed price quotes with proposed delivery schedules, tariffs stated separately, and completed Abbreviated Representations and Certifications forms (BSD-CS-2260). Key contract requirements include compliance with all applicable federal, state, and local laws; registration in the System for Award Management (SAM); Buy American Act compliance for supply offers exceeding $15,000; adherence to export control regulations; and certification regarding forced or indentured child labor. Award will be made to the lowest priced, technically acceptable proposal based on the evaluation criteria specified in the solicitation. Critical deadlines include March 25, 2026, at 5:00 PM EST for submission of questions to the procurement representative Katherine Plourde (plourdek@ornl.gov), and March 26, 2026, at 5:00 PM EST for submission of proposals.

This solicitation is not designated as a small business set-away, and no incumbent contractor is identified in the materials. The bill of materials specifies a total of 19 units across multiple product categories: three Baratron capacitance manometers (model 627H12TBC2B), two additional manometers (model 627H13TBC2B), five power supply/readout units (model PDR2000AO), five shielded manometer cables (model RCB2000S-1-M1), two digital mass flow controllers (model GE50A013103RB VP20), and two power supply/readout/controller single-channel units (model PSR1A-US). The anticipated subcontract period commences upon receipt of the award, and all deliveries must be made to Oak Ridge National Laboratory located at 1 Bethel Valley Road, Oak Ridge, Tennessee 37831. Vendors may propose either the specified manufacturer part numbers or certified domestic equivalents, and the offer validity period is 120 days from submission.

Notice text

Heated (45 °C) Absolute Baratron® Capacitance Manometer, Power supply & Readouts, Cables, Mass Flow controller.

The NUCLEAR NONPROLIFERATION DIVISION at Oak Ridge National Laboratory is in need of a Manometer and accessories per the attached Bill of Material titled Attachment C- RFQ 450899 Bill of Materials. 

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
GEMINI. HP. L. ASY: interferometer, Gemini-Felix, and PDM module Oak Ridge, Tennessee 37830, United States · NAICS 334516 Department of Energy No set-aside
Rapid, Automated Particle Characterization (Morphologi 4 ID) Oak Ridge, Tennessee 37830, United States · NAICS 334516 Department of Energy No set-aside
NOVO DR Inc. , Discovery III System 22WNH - Bright XL, and accessories Oak Ridge, Tennessee 37830, United States · NAICS 334517 Department of Energy No set-aside
Milling Equipment Oak Ridge, Tennessee 37830, United States · NAICS 333517 Department of Energy No set-aside
Zoller Power Shrink 600 Oak Ridge, Tennessee 37830, United States · NAICS 333515 Department of Energy No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity