Hangar fire suppression system renovation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S9D26BA001
- Agency
-
Army National Guard
Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- 1415 W El Paso RdFairchild Air Force Base, WA 99011 99011
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Army National Guard (141st Airlift Wing, Washington Air National Guard) seeks replacement of the AFFF/wet sprinkler fire suppression system at Fairchild Air Force Base, Washington with an automatic water sprinkler system, with bids opened September 10. The procurement is a 100% small business set-aside, foreclosing non-small-business competition.
Place of performance is Fairchild AFB, WA 99011. The scope includes replacement of piping, valves, fire cannons, standpipe systems, fire alarms and detection systems, and sprinkler heads across buildings B1037, B1033, and B1029; demolition and disposal of the AFFF system; and all repairs and replacements to current code and UFC requirements. NAICS code is 238220, Plumbing, Heating, and Air-Conditioning Contractors, with a small business size standard of $19.0 million. The period of performance is 600 days (estimated NTP September 2026).
The project magnitude is between $1,000,000 and $5,000,000. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the government, considering price, price-related factors, and past performance. This is a commercial construction procurement. FAR 52.228-1, Bid Guarantee, applies. Funds are not currently available for this requirement. A site visit was conducted July 28; as-built drawings and hazardous waste manifests are available. Four bids were opened on September 10; the low bid was $2,897,287.00 (Souza Construction Inc.).
Notice text
7 versions
Update #7 · Latest ·
ADDING POST BID OPENING ABSTRACT. SEE ATTACHMENT
This amendment 05 is to: Providing answer to last RFI. See attached. See RFI 06, Question 1, regarding EMT conduit. Bid opening date is NOT extended. This amendment 04 is to: Post an updated RFI Response to RFI 04, questions 23 and 24, pertaining to Monaco panelsThis amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation Module), to assist addressing RFI questions.3) Provide Answers to all of the the RFIs submitted. See new attachment in PIEE Solicitation module.4) Period of Performance has been changed to 600 days.1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #6 ·
This amendment 05 is to: Providing answer to last RFI. See attached. See RFI 06, Question 1, regarding EMT conduit. Bid opening date is NOT extended. This amendment 04 is to: Post an updated RFI Response to RFI 04, questions 23 and 24, pertaining to Monaco panelsThis amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation Module), to assist addressing RFI questions.3) Provide Answers to all of the the RFIs submitted. See new attachment in PIEE Solicitation module.4) Period of Performance has been changed to 600 days.1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #5 ·
This amendment 04 is to: Post an updated RFI Response to RFI 04, questions 23 and 24, pertaining to Monaco panelsThis amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation Module), to assist addressing RFI questions.3) Provide Answers to all of the the RFIs submitted. See new attachment in PIEE Solicitation module.4) Period of Performance has been changed to 600 days.1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #4 ·
This amendment 03 is to:1) Extend the bid due/opening date to 10 SEPT 2026, 1:00 PM Pacific Time. Deadline for new RFIs is 5 SEPT 2026, COB. 2) Upload Bill of Lading, Haz Waste Manifests for AFFF Removal Project, and Sundown Policy for Foam Fire Suppression Systems (Change 2) (see new attachments in PIEE Solicitation Module), to assist addressing RFI questions.3) Provide Answers to all of the the RFIs submitted. See new attachment in PIEE Solicitation module.4) Period of Performance has been changed to 600 days.1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #3 ·
1) Extend the bid due/opening date to 2 SEPT 2026, 1:00 PM Pacific Time.2) Upload As-Built drawings. ** email 141MSG.MSC@us.af.mil to request for access and download through DODSAFE. 3) Add Clause, FAR 52.228-1 BID GUARANTEE. This was erroneously omitted from the original solicitation.4) Provide Answers to some of the RFIs submitted. See attachment. * answers highlighted yellow. Unanswered are provided to mitigate duplicate questions. (31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #2 ·
(31 JULY 2026) AMENDMENT 01 UPDATE INFORMATION: 1) The bid due/opening date.time is changed to 19 August 2026, 1:00pm PST.2) Clarify questions and RFIs: All questions and requests for information (RFIs) must be received NOT LATER THAN the fifth working day prior to bid opening. This is 12 AUGUST 2026, close of business. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY INTHIS PROCESS.3) Clarify email address to send questions and RFIs: 141MSG.MSC@us.af.mil4) The Site Visit (28 July 2026) Minutes and Sign In sheet have been uploaded. PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Update #1 ·
PROJECT TITLE: FIRE SUPPRESSION SYSTEM RENOVATION PROJECT LOCATION: FAIRCHILD AFB, WAWASHINGTON AIR NATIONAL GUARD REQUIRES THE REPLACEMENT OF THE AFFF/WET SPRINKLER FIRE SUPPRESSION SYSTEM IN B1037, B1033, AND B1029 WITH AN AUTOMATIC WATER SPRINKLER SYSTEM. REPLACE PIPING, VALVES, FIRE CANNONS, STANDPIPE SYSTEM, FIRE ALARMS/DETECTION SYSTEMS, AND SPRINKLER HEADS. DEMO AFFF SYSTEM AND DISPOSE OF AFFF. ALL REPAIRS AND REPLACEMENT WILL BE UP TO CURRENT CODE AND UFC REQUIREMENTS.REQUIRING ACTIVITY: WA AIR NATIONAL GUARD, 141ST ARW, 1415 EL PASO RD, FAIRCHILD AFB, WA 99011 PERIOD OF PERFORMANCE: 200 DAYS (EST. NTP SEPTEMBER 2026)1.) 100% SMALL BUSINESS SET-ASIDE2.) NAICS CODE: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS3.) SMALL BUSINESS SIZE STANDARD: $19.0M4.) PROJECT MAGNITUDE: BETWEEN $1,000,000 TO $5,000,0005.) SITE VISIT: 28 JULY 2026 AT 9:00 AM (PST) (SEE SECTION 00100 FOR INSTRUCTIONS)6.) FUNDS ARE NOT CURRENTLY AVAILABLE FOR THIS REQUIREMENT.7.) AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING PRICE, PRICE RELATED FACTORS, AND A DETERMINATION OF CONTRACTOR RESPONSIBILITY USING PAST PERFORMANCE.8.) THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT.
Files
| File | Type | Posted |
|---|---|---|
| 1419 Abstract of Bids_10Sep26.mb.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hangar fire suppression system renovation | Award Notice | |
| This notice | Solicitation | |
| Hangar Fire Suppression System | Pre-Solicitation | |
| Hangar Fire Suppression System | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| Building 450 Fire Suppression System Installation | Reserve Command | No set-aside | |
| Z1DA--CON-NRM-668-22-106 Correct Domestic Water System | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business | |
| Inspection of Fire Extinguishers and Suppression Systems for AMXG at Hill AFB, Utah | Air Force Sustainment Center | Total Small Business | |
| GOV Parking and Roadway paving, Camp Murray, WA | Army National Guard | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity