Hamilton shaft seals

Closed Special Notice Posted

This opportunity was awarded. See the award notice from .

Solicitation number
70Z085Q250018954
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336611 Ship Building and Repairing
Place of performance
Norfolk, Virginia 23511, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Homeland Security's U.S. Coast Guard has issued a Special Notice for a sole-source contract related to Hamilton Shaft Seals maintenance. The opportunity focuses on cleaning, inspecting, and setting seal body compression for port and starboard rudder stock seals on a maritime vessel. The contract requires a specialized contractor with expertise in maritime equipment maintenance, specifically for Defense Maritime Solutions (formerly Wartsila) Rudder Stock Seal systems. This special notice was posted on May 2, 2025, with a submission deadline of May 3, 2025, and falls under the Ship Building and Repairing NAICS category. The work will be conducted in accordance with specific Coast Guard technical publications and standard specifications.

The primary objective of this contract is to ensure comprehensive maintenance and performance verification of rudder stock seals through a detailed maintenance process. Contractors must provide an Original Equipment Manufacturer (OEM) authorized technical representative who is certified to perform the work, including visual inspections, cleaning, and pressure testing of inflatable seals. Key requirements include maintaining proper isolation boundaries, conducting inflatable seal pressure drop tests, and setting seal body compression according to precise specifications. The contractor will be responsible for participating in dock trials, checking for potential issues like leakage, noise, heating, and vibration, and documenting any abnormalities discovered during the process. While the notice indicates no specific set-aside for the contract, the contractor must demonstrate technical expertise, have access to proprietary information and tools, and be prepared to comply with all manufacturer procedures and Coast Guard standards throughout the maintenance process.

Notice text

THIS IS A NOTICE TO AWARD SOLE SOURCE 

  1. ITEM 1: Rudder Stock Seal, Clean and Inspect

1.  SCOPE

1.1 Intent.  This work item describes the requirements for the Contractor to Clean, inspect and set seal body compression for the Port and Starboard rudder stock seals.

1.2 Government-furnished property.

2.  REFERENCES

Coast Guard Drawings

Coast Guard Drawing 750-WMSL-562-003, Rev D, Rudder Support System (ASC562003)

Coast Guard Publications

Coast Guard Technical Publication (TP) 7007, SWBS 562, Feb 2025, Rudderstock Seal,Type ER+IS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Other References

None

3.  REQUIREMENTS

3.1 General.

3.1.1 CIR. 

None.

3.1.2 Tech Rep.  The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the Defense Maritime Solutions (formerly Wartsila) Rudder Stock Seal system to accomplish the following on site:

  • Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.
  • Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.

3.1.2.1 Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.

3.1.3 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences.  The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

  • Sheathing
  • Piping
  • Electrical wiring

3.2 Initial inspection. The Contractor must inspect all affected equipment and systems  to document the existing condition.  Submit a CFR for each set of seal noting any equipment or system discrepancies.

3.2.1 Conduct a visual inspection of each seal assembly.

3.2.2 Prior to commencing inspection/seal compressionof each rudder stock seal, clean the seal assemblies of all dirt and grit accumulations. 

3.3 Double isolation boundary.  The Contractor must consult with Cutter Engineering Officer to determine if double sea water insolation boundary is required before and while the rudder seal overhaul is performed. For Planning and Execution of this work, assume that it is not, however, if additional boundary options are necessary (ie, Cofferdam), provide CFR to recommend use of Additional Isolation Boundary (ie, Cofferdam). Maintenance - Inflatable seal will provide the single isolation boundary. If cofferdam/double-boundary is not utilized, work must be performed continuously, with no extended breaks (ie, no overnight times, left in single-boundary condition)

Caution

Rudder stock movement with the inflatable seal inflated will damage the seal and cause a loss of its watertight function. Excessive water leakage around the rudder stock will occur resulting in possible flooding. Do not move the rudder stock while the inflatable seal is inflated.

3.3.1 Inflatable seal testing.  Prior to removal of any parts, the Contractor must conduct the inflatable seal pressure drop test specified in paragraph 4-3.4 of CG Tech Pub 7007 on each seal assembly. Submit a CFR.

3.3.1.2  Inflatable seal must be kept pressurized while work on the Rudder stock seal is performed.

3.3.2 Cofferdam Optional: Contractor must consult with Cutter Engineering Officer, to determine the need for any cofferdam considerations.  However, for planning and executing of this job, do not assume that it is necessary.  If it is later deemed necessary, provide a CFR requesting this option. If cofferdam/double-boundary is not utilized, work must be performed continuously, with no extended breaks (ie, no overnight times, left in single-boundary condition)

3.4 Set seal body compression. The Contactor must set seal compression in accordance with paragraph 6-2 of Tech Pub 7007.

3.4.1 After seal body compression work has been completed, the Contractor must remove any installed items supporting repairs (ie, bracketing, cofferdams, etc) and release pressure from inflatable seat. Verify leakage has stopped.  Submit CFR.

Caution

Rudder stock movement with the inflatable seal inflated will damage the seal and cause a loss of its watertight function. Excessive water leakage around the rudder stock will occur resulting in possible flooding. Do not move the rudder stock while the inflatable seal is inflated.

3.5 System restoration. The Contractor must restore all affected equipment and systems to their normal operating condition after satisfactory completion of testing. Lubricate the rudder stock seal in accordance with paragraph 4-3.3 of CG Tech Pub 7007.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.6  Dock Trials.  The Tech Rep must be on board for dock trials. During dock trials, Ship’s Force will operate the rudder from hard over to hard over several times. The Contractor must check for leakage, noise, undue heating, and vibration related to the work under this specification.  The Contractor must correct any deficiencies and retest. Submit a CFR.

3.7 Sea Trials.  The Tech Rep is not required to ride vessel for any potential Sea Trials to Test System.  However, if Sea Trial Attendance is later deemed to be necessary (either by Tech Rep, or USCG Representative, ie, Engineering Officer, etc), provide CFR stating that Sea Trial Attendance is recommended. If Sea Trial Attendance is warranted, during trials, the Cutter will be run at various speeds and conditions, both ahead and astern. The Contractor must correct any leakage, vibration, noise, and/or excessive temperatures that arise as a consequence of the work under this specification. During trials, the Coast Guard will operate the Cutter and all equipment at low, mid, and high shaft speeds, and at full load. The Contractor must submit a CFR and document any abnormalities in operation of the rudder stock seal during sea trials.

4.  NOTES

4.1 Not applicable.

Files

File Type Posted
SOW - 56205_RddrStck_Clean_Insp_418.docx DOCX document

Notice history

Notice Type Posted
Hamilton rudder seals Award Award Notice
This notice Latest special notice Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
Parts kit seal replacement NAICS 333998 Coast Guard No set-aside
Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair Alameda, California, United States · NAICS 336611 — No set-aside
Overhaul of Rotary Wing and Rotary Rudder Blades NAICS 336413 Coast Guard No set-aside
Seal assembly, shaft, SP NAICS 333914 Land and Maritime No set-aside
Seal assembly, shaft, SP NAICS 333914 Land and Maritime No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity