GSA Solicitation for Design Build Construction Services, Nogales, AZ
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 47PA0321R0005
- Agency
-
Public Buildings Service
General Services Administration
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Nogales, Arizona 85621, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build construction services to renovate an existing 78,000 square foot warehouse in Nogales, Arizona into a Centralized Processing Center for the Department of Homeland Security's Customs and Border Protection. The General Services Administration will evaluate proposals based on past performance, design-build manager qualifications, and experience with similar projects to award a firm fixed-price contract. Phase one proposals are due by January 15, 2021 and a maximum of five offerors will be shortlisted to submit phase two pricing by an unspecified future date.
The solicitation is set aside for small businesses and targets the NAICS codes 236220 (Commercial and Institutional Building Construction) and 541330 (Engineering Services). The estimated value is between $25-30 million to be awarded under PSC code C211 for the renovation of the facility in Nogales, Arizona, which must be substantially completed by April 29, 2022 to better serve up to 500 non-citizens in the Tucson Sector Area of Responsibility for Customs and Border Protection.
Notice text
6 versions
Update #6 · Latest ·
AMENDMENT 3 STANDARD FORM 30 IS HEREBY ATTACHED.
AMENDMENT 3 PROVIDES NAMES OF FIRMS SELECTED TO MOVE FORWARD TO PHASE 2 AND INCLUDES REVISED STATEMENT OF WORK. SEE ATTACHMENT TITLE AMENDMENT 3.
AMENDMENT 2 REFER TO ATTACHMENTS - Please note the substituted Nogales CPC- Solicitation RFI Log in Excel format in lieu of the pdf version.
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Update #5 ·
AMENDMENT 3 PROVIDES NAMES OF FIRMS SELECTED TO MOVE FORWARD TO PHASE 2 AND INCLUDES REVISED STATEMENT OF WORK. SEE ATTACHMENT TITLE AMENDMENT 3.
AMENDMENT 2 REFER TO ATTACHMENTS - Please note the substituted Nogales CPC- Solicitation RFI Log in Excel format in lieu of the pdf version.
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Update #4 ·
AMENDMENT 2 REFER TO ATTACHMENTS - Please note the substituted Nogales CPC- Solicitation RFI Log in Excel format in lieu of the pdf version.
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Update #3 ·
AMENDMENT 2 REFER TO ATTACHMENTS
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Update #2 ·
AMENDMENT 1 REFER TO ATTACHMENTS
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Update #1 ·
This project is for the renovation of the Department of Homeland Security (DHS), Border Patrol
Facilities and Tactical Infrastructure’s Centralized Processing Center (CPC) in Nogales, Arizona.
The delivery method of the construction project is design-build (DB) where the end result will be
the renovation of 78,000 square feet of existing warehouse space to create a CPC in Nogales,
Arizona within the Tucson Sector Area of Responsibility (AOR)(the “Project”). The intent of the
Project is to create a space that better serves the operational needs of the U. S. Border Patrol
(BP) agents and staff. In order to fulfill this need, the CPC will be designed as a multi-functional
facility which is intended to house approximately 500 non-citizens. The renovation will consist of
administrative space for BP functions such as offices, open workstations, conference space,
restrooms, processing and holding space, non-citizen phone booths, local area network (LAN)
room space, janitorial, electrical, mechanical and fire protection equipment rooms. Additionally, the
Project will include electrifying an existing vehicle gate that will be for used for non-citizen
transportation, new connection to city sewer, utility infrastructure upgrades and supplemental
storm water management work to eliminate drainage issues at the warehouse.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| GSA Solicitation for Design Build Construction Services, Nogales, AZ | Award Notice | |
| This notice | Solicitation | |
| GSA Synopsis for Design Build Construction Services, Nogales, AZ | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SOLICITATION NOTICE- Massena NY Virtual Law Enforcement Training Facility- Construction | — | Total Small Business | |
| CBP Ajo Station Trash Removal Services | Customs and Border Protection | Total Small Business | |
| USBP ITC Construction FLETC Artesia | Federal Law Enforcement Training Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity