Grounds maintenance services for louisiana national cemetery

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C78618Q9695
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
36C78619D0089 Federal IDV award
NAICS code
561730 Landscaping Services
PSC
Not on record
Place of performance
Louisiana National Cemetery 303 W. Mount Pleasant Road Zachary, LA 70791 USA
More information

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

The purpose of this amendment is to 1) address a question from a prospective vendor and 2) revise the solicitation response date.
1. Question: [W]ith respect to the quantity listed in under line item 2009, it notes 2 On-call clean ups while the rest of the option periods and the base period call for 1 Is this a misprint or a deliberate increase for option period 2?
Answer: The quantity under line 2009 will change from 2 On-call clean ups to 1 On-call clean up.
2. The solicitation response date will change from November 30, 2018 at 4:00 pm to December 3, 2018 at 4:00 pm..

Update #4 ·

The purpose of this amendment to the solicitation is to 1) address questions from prospective vendors and 2) revise language in the first paragraph under the Price Schedule heading on page 2 of the solicitation.
1)
Question 1: [C]an the contracting team please confirm the rates that vendors are to use ?
Answer 1: The applicable wage rates are requirements are set forth in FAR 52.222-41 Service Contract Labor Standards (Aug 2018). The rates listed under FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) are for informational purposes only and they are not a wage determination.
Question 2: [P]lease clarify what needs, if any, the cemetery will have for interments and excavations to be performed by the contractor?
Answer 2: None.
Question 3: Are there local Boy Scout troops and other volunteer organizations who have routinely performed this service in the past?
Answer 3: Yes.
2) The language in the first paragraph under the Price Schedule heading on page 2 of the solicitation will change from,
Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grave excavations, interments, and grounds and facility maintenance services to maintain the Louisiana National Cemetery located at 303 W Mount Pleasant Road, Zachary, LA 70791, following National Cemetery Administration standards. Contract period will consist of a base period from January 1, 2019 (or date of contract award), through September 30, 2019, with up to four (4) one-year options to extend the term of the contract through September 30, 2023
To
Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grounds and facility maintenance services to maintain the Louisiana National Cemetery located at 303 W Mount Pleasant Road, Zachary, LA 70791, following National Cemetery Administration standards. Contract period will consist of a base period from January 1, 2019 (or date of contract award), through September 30, 2019, with up to four (4) one-year options to extend the term of the contract through September 30, 2023..

Update #3 ·

The purpose of this amendment is to address questions from prospective vendors.
Question 1: [H]ow much was the award amount?
Answer 1: The award amount of the base year plus, four, one-year option periods (if exercised) was $534,876.00.
Question 2: [W]ere there any changes to the scope of work for this solicitation from the current contract?
Answer 2: Yes. The changes made decreased ambiguity of the contractual requirements provided in the performance work statement and price schedule. The requirements of the contract, in and of themselves, did not change..

Update #2 ·

The purpose of the solicitation amendment is to address questions from a prospective vendor.
Question 1: Who is the incumbent contractor and what is the current contract number?
Answer 1: The incumbent is 4 A ERA LLC. The current contract number is 36C78618D0111.
Question 2: Is this a new requirement or is there an incumbent vendor?
Answer 2: This is not a new requirement..

Update #1 ·


RFQ FOR COMMERCIAL ITEMS
GENERAL INFORMATION
Document Type: Combined Synopsis Solicitation
Solicitation Number: 36C78618Q9695
Post Date: 10/31/2018
Original Response Date: 11/30/2018 at 4:00 pm
Applicable NAICS: 561730
Classification Code: S208
Set Aside Type: 100% Service Disabled Veteran Owned Small Business
Period of Performance: Date of Award through September 30, 2019 plus, four, one-year
option periods, if exercised
Issuing Contracting Office: Department of Veterans Affairs
National Cemetery Administration, Contract Services
75 Barrett Heights Rd., Suite 309
Stafford, VA 22556
Place of Performance: Louisiana National Cemetery
303 W Mount Pleasant Road
Zachary, LA 70791
Attachments: A Performance Work Statement
B Past Performance Questionnaire
C List of References
D Wage Determination (East Baton Rouge Parish)
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78618Q9695.
This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2005-101 (26 Oct 2018).
This is a 100% set-aside for Service Disabled Veteran Owned Small Business (SDVOSB)
The applicable North American Industrial Classification System (NAICS) code for this procurement is 561730, with a business size standard of $7.5 million.
This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.
The U.S. Department of Veterans Affairs, National Cemetery Administration, anticipates the award of a Firm Fixed Priced Requirements Contract.
Scope: The contractor shall be responsible for providing ground maintenance services at Louisiana National Cemetery.
PRICE SCHEDULE: Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grave excavations, interments, and grounds and facility maintenance services to maintain the Louisiana National Cemetery located at 303 W Mount Pleasant Road, Zachary, LA 70791, following National Cemetery Administration standards. Contract period will consist of a base period from January 1, 2019 (or date of contract award), through September 30, 2019, with up to four (4) one-year options to extend the term of the contract through September 30, 2023. Units and services to be in accordance with Performance Work Statement, Technical Specifications, Performance Incentives/Disincentives, terms and conditions contained in this solicitation.
The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Items (CLINs). Offerors shall enter unit price and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only.
The guaranteed minimum award for this contract is $500.00. The maximum aggregate value of orders that can be placed under this contract is $3,000,000.00. The Government does not guarantee that it will place any orders under this contract in excess of the guaranteed minimum award amount.
Period of Performance: Date of award through September 30, 2019, plus four, one-year option periods, if exercised. Estimated beginning of period of performance: February 1, 2019.
Base Year: Date of award thru September 30, 2019
CLIN
No.
Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
0001
Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 15.0 acres mowed)
40
Job
$ ___________
$ ___________
0002
String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. (Est. 15.0 acres trimmed.)
40
Job
$ ___________
$ ___________
0003
Trim headstones in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. (Est. 1490 headstones trimmed)
40
Job
$ ___________
$ ___________
0004
Blade Edge all curbing, sidewalks, and roads. (Est. 9510 linear feet edged.)
24
Job
$ ___________
$ ___________
0005
Pre-Emergent Herbicide Applications (Est. 15 acres treated.)
2
Job
$ ___________
$ ___________
0006
Post-Emergent Herbicide Applications (Est. 15 acres treated.)
3
Job
$ ___________
$ ___________
0007
Weed control monitoring in turf area, rock areas and mulch beds.
9
Month
$ ___________
$ ___________
0008
Fertilizer Applications and materials. Free flowing, granular, 21-07-14 (N-P-K) with 50% slow release nitrogen (Polyplus) and 4.5% iron (Fe), in 50-lb bags. (Est 15 acres).
3
Job
$ __________
$ __________
0009
On-call Cleanup: Collect and remove leaves, nuts, and twigs (above and beyond normal leaf and debris removal).
1
Job
$ __________
$ __________
0010
Set up/pickup memorial day gravesite flags
2
Job
$ __________
$ __________
0011
Custodial services: Public restrooms, Administrative Building, Maintenance Building, Site trash receptacles
40
Week
$ __________
$ __________
Total Price For the
Base Year:
$ __________
OPTION PERIOD 1: October 1, 2019 thru September 30, 2020
CLIN
No.
Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
1001
Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 15.0 acres mowed)
52
Job
$ ___________
$ ___________
1002
String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. (Est. 15.0 acres trimmed.)
52
Job
$ ___________
$ ___________
1003
Trim headstones in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. (Est. 1490 headstones trimmed)
52
Job
$ ___________
$ ___________
1004
Blade Edge all curbing, sidewalks, and roads. (Est. 9510 linear feet edged.)
30
Job
$ ___________
$ ___________
1005
Pre-Emergent Herbicide Applications (Est. 15 acres treated.)
2
Job
$ ___________
$ ___________
1006
Post-Emergent Herbicide Applications (Est. 15 acres treated.)
3
Job
$ ___________
$ ___________
1007
Weed control monitoring in turf area, rock areas and mulch beds.
12
Month
$ ___________
$ ___________
1008
Fertilizer Applications and materials. Free flowing, granular, 21-07-14 (N-P-K) with 50% slow release nitrogen (Polyplus) and 4.5% iron (Fe), in 50-lb bags. (Est 15 acres).
3
Job
$ __________
$ __________
1009
On-call Cleanup: Collect and remove leaves, nuts, and twigs (above and beyond normal leaf and debris removal).
1
Job
$ __________
$ __________
1010
Set up/pickup memorial day gravesite flags
2
Job
$ __________
$ __________
1011
Custodial services: Public restrooms, Administrative Building, Maintenance Building, Site trash receptacles
52
Week
$ __________
$ __________
Total Price For Option Period 1:
$ __________
OPTION PERIOD 2: October 1, 2020 thru September 30, 2021
CLIN
No.
Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
2001
Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 15.0 acres mowed)
52
Job
$ ___________
$ ___________
2002
String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. (Est. 15.0 acres trimmed.)
52
Job
$ ___________
$ ___________
2003
Trim headstones in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. (Est. 1490 headstones trimmed)
52
Job
$ ___________
$ ___________
2004
Blade Edge all curbing, sidewalks, and roads. (Est. 9510 linear feet edged.)
30
Job
$ ___________
$ ___________
2005
Pre-Emergent Herbicide Applications (Est. 15 acres treated.)
2
Job
$ ___________
$ ___________
2006
Post-Emergent Herbicide Applications (Est. 15 acres treated.)
3
Job
$ ___________
$ ___________
2007
Weed control monitoring in turf area, rock areas and mulch beds.
12
Month
$ ___________
$ ___________
2008
Fertilizer Applications and materials. Free flowing, granular, 21-07-14 (N-P-K) with 50% slow release nitrogen (Polyplus) and 4.5% iron (Fe), in 50-lb bags. (Est 15 acres).
3
Job
$ __________
$ __________
2009
On-call Cleanup: Collect and remove leaves, nuts, and twigs (above and beyond normal leaf and debris removal).
2
Job
$ __________
$ __________
2010
Set up/pickup memorial day gravesite flags
2
Job
$ __________
$ __________
2011
Custodial services: Public restrooms, Administrative Building, Maintenance Building, Site trash receptacles
52
Week
$ __________
$ __________
Total Price For Option Period 2:
$ __________
OPTION PERIOD 3: October 1, 2021 thru September 30, 2022
CLIN
No.
Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
3001
Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 15.0 acres mowed)
52
Job
$ ___________
$ ___________
3002
String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. (Est. 15.0 acres trimmed.)
52
Job
$ ___________
$ ___________
3003
Trim headstones in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. (Est. 1490 headstones trimmed)
52
Job
$ ___________
$ ___________
3004
Blade Edge all curbing, sidewalks, and roads. (Est. 9510 linear feet edged.)
30
Job
$ ___________
$ ___________
3005
Pre-Emergent Herbicide Applications (Est. 15 acres treated.)
2
Job
$ ___________
$ ___________
3006
Post-Emergent Herbicide Applications (Est. 15 acres treated.)
3
Job
$ ___________
$ ___________
3007
Weed control monitoring in turf area, rock areas and mulch beds.
12
Month
$ ___________
$ ___________
3008
Fertilizer Applications and materials. Free flowing, granular, 21-07-14 (N-P-K) with 50% slow release nitrogen (Polyplus) and 4.5% iron (Fe), in 50-lb bags. (Est 15 acres).
3
Job
$ __________
$ __________
3009
On-call Cleanup: Collect and remove leaves, nuts, and twigs (above and beyond normal leaf and debris removal).
1
Job
$ __________
$ __________
3010
Set up/pickup memorial day gravesite flags
2
Job
$ __________
$ __________
3011
Custodial services: Public restrooms, Administrative Building, Maintenance Building, Site trash receptacles
52
Week
$ __________
$ __________
Total Price For Option Period 3:
$ __________
OPTION PERIOD 4: October 1, 2022 thru September 30, 2023
CLIN
No.
Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
4001
Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 15.0 acres mowed)
52
Job
$ ___________
$ ___________
4002
String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. (Est. 15.0 acres trimmed.)
52
Job
$ ___________
$ ___________
4003
Trim headstones in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. (Est. 1490 headstones trimmed)
52
Job
$ ___________
$ ___________
4004
Blade Edge all curbing, sidewalks, and roads. (Est. 9510 linear feet edged.)
30
Job
$ ___________
$ ___________
4005
Pre-Emergent Herbicide Applications (Est. 15 acres treated.)
2
Job
$ ___________
$ ___________
4006
Post-Emergent Herbicide Applications (Est. 15 acres treated.)
3
Job
$ ___________
$ ___________
4007
Weed control monitoring in turf area, rock areas and mulch beds.
12
Month
$ ___________
$ ___________
4008
Fertilizer Applications and materials. Free flowing, granular, 21-07-14 (N-P-K) with 50% slow release nitrogen (Polyplus) and 4.5% iron (Fe), in 50-lb bags. (Est 15 acres).
3
Job
$ __________
$ __________
4009
On-call Cleanup: Collect and remove leaves, nuts, and twigs (above and beyond normal leaf and debris removal).
1
Job
$ __________
$ __________
4010
Set up/pickup memorial day gravesite flags
2
Job
$ __________
$ __________
4011
Custodial services: Public restrooms, Administrative Building, Maintenance Building, Site trash receptacles
52
Week
$ __________
$ __________
Total Price For Option Period 4:
$ __________
PRICE SUMMARY
Base Period (date of award through 9/30/2019)
$
Option Period 1 (10/1/2019 through 9/30/2020)
$
Option Period 2 (10/1/2020 through 9/30/2021)
$
Option Period 3 (10/1/2021 through 9/30/2022)
$
Option Period 4 (10/1/2022 through 9/30/2023)
$
Total Estimated Price
(Base Plus all Option Periods):
$
Services to be Provided: See Attachment A Performance Work Statement
SITE VISIT: Offerors are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Baton Rouge National Cemetery, YOU MUST CONTACT one of the following personnel to make arrangements:
Louisiana National Cemetery:
POC: Maurice Roan Phone: 225-654-1988
POC: Chris Carpenter Phone: 225-654-1988
POST AWARD CONFERENCE: Prior to commencement of work, contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer to assure that all parties understand all contractual obligations and the role that each party serves.
Responses to this Request for Quotation (RFQ) are due to the Contracting Officer no later than 4:00 pm on 11/30/2018. Responses to this announcement will result in a Firm-Fixed Price Requirements Contract and the Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining any and all amendments or additional information concerning this announcement at https://fbo.gov.
All questions regarding this solicitation are to be submitted to the contracting officer, via email, no later than (5) calendar days before the closing date of the solicitation. Questions will not be addressed using the telephone.
Proposal Format and Submission Information:
Offers must be submitted on company letterhead. Commercial format is encouraged. All offerors shall include the following information as part of their quote:
Legal Business/Company Name (as listed in www.sam.gov)
DUNS Number
Point of Contact Name
Telephone number
Email Address
-Pricing shall be submitted as requested in the Schedule of Supplies/Services
-Technical Package for Evaluation
-Past Performance Questionnaire (Attachment B)
-List of References (Attachment C)
Proposals shall be submitted via email or via mail to the following addresses:
Email: Kenneth.dougherty@va.gov
Mail: 75 Barrett Heights Road
Suite 309
Stafford, VA 22556
For proposals mailed, proposals shall be submitted on compact disk (CD) and files shall be in either Microsoft Word or Adobe pdf formats. DVDs are not acceptable as the Government computer is unable to read this media type. Any DVDs received in response to this announcement will be rated as technically unacceptable and removed from consideration.
Questions pertaining to this announcement shall be sent by email to: kenneth.dougherty@va.gov . Telephone inquiries will not be accepted.
Evaluation Process:
The Government intends to award a firm fixed price, Requirements contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered. Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the best as a whole.
Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which quote provides the government with its needs, as identified in the RFQ. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The government has the discretion to accept other than the lowest priced offeror that provides additional benefits. The government also has the has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the government.
The following factors shall be used to evaluate offers:
Pricing: The sum of all the CLINs, to include options, will represent the total evaluated price. Proposed price must be determined to be fair and reasonable in order to be eligible for award.
Technical Acceptability
Demonstrated experience performing this requirement
Demonstrated qualifications to perform services
Use of Sub-Contractors
Past Performance
SDVOSB Status verification in CVE
Proposal Contents:
-Pricing shall be submitted as requested in the Schedule of Supplies/Services.
-Technical Package for Evaluation
The following shall be included as part of the offeror s submission:
Experience of company and subcontractors anticipated to perform work under this contract
Managerial & Technical Qualifications of key personnel
Qualifications of any proposed sub-contractors and the percentage of work they will be performing.
-Past Performance. The offeror is responsible for providing three (3) references of their choosing. Send a copy of the attached Past Performance Questionnaire (Attachment B) for their completion. The completed questionnaire is to be returned to the Contracting Officer for review. The completed questionnaires shall be sent to: kenneth.dougherty@va.gov no later than three days after the solicitation s closing date and time. The references chosen by the offer should be selected based on past projects of the same or similar work.
In addition to the past performance questionnaires, the offeror is responsible for providing a completed copy of the List of References (Attachment C) to the contracting officer. The completed list of references shall be included with the offeror s proposal submission.
Solicitation Provisions and Contract Clauses
The full text of FAR/VAAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
https://www.va.gov/oal/library/vaar/
The following solicitation provisions apply to this acquisition:
FAR 52.209-7 Information Regarding Responsibility Matters (Jul 2013)
FAR 52.212-1 Instructions to Offerors Commercial Items (Oct 2018)
FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (Oct 2018)
FAR 52.223-1 Biobased Product Certification (May 2012)
FAR 52.233-2 Service of Protest (Sept 2006)
VAAR 852.233-70 Protest Content /Alternative Dispute Resolution (Oct 2018)
VAAR 852.233-71 Alternate Protest Procedure (Oct 2018)
VAAR 852.270-1 Representatives of Contracting Officers (Jan 2008)
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3 Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.
The following solicitation clauses apply to this acquisition:
The clause at 52.212-4, Contract Terms and Conditions Commercial Items (Jan 2017) applies to this acquisition.
Addendum to FAR clause 52.212-4, Contract Terms and Conditions Commercial Items (Jan 2017):
FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014)
FAR 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
FAR 52.216-18 Ordering (Oct 1995) (date of award through September 30, 2019)
FAR 52.216-19 Order Limitations (Oct 1995) ($250.00 | 60 | 90 | 30 days)
FAR 52.216-21 Requirements (Oct 1995) (September 30, 2019)
FAR 52.217-8 Option to Extend Services (Nov 1999) (15 days)
FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000)
FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013)
FAR 52.228-5 Insurance Work on a Government Installation (Jan 1997)
CL-120 Supplemental Insurance Requirements
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $250,000.00 per person; $500,000.00 per occurrence and $100,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
FAR 52.232-18 Availability of Funds (Apr 1984)
FAR 52.232-19 Availability of Funds for the Next Fiscal Year (Apr 1984)
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
FAR 52.237-3 Continuity of Services (Jan 1991)
VAAR 852.203-70 Commercial Advertising (Jan 2008)
VAAR 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business (Jul 2016) (DEVIATION)
VAAR 852.219-74, Limitations on Subcontracting Monitoring and Compliance (Jul 2018)(VAAR 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business (Jul 2016)(DEVIATION))
VAAR 852.232-72 Electronic Submission of Payments Requests (Nov 2018)
VAAR 852.237-70 Contractor Responsibilities (Apr 1984)
The clause at 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders (Oct 2018) applies to this acquisition. The following subparagraphs of FAR 52.212-5 are applicable: (b)(1), (b)(4), (b)(6), (b)(7), (b)(8), (b)(9), (b)(16), (b)(22), (b)(25), (b)(27), (b)(28)(i), (b)(29)(i), (b)(30), (b)(31), (b)(32), (b)(33)(i), (b)(42), (b)(46), (b)(49), (b)(55), (c)(1), (c)(2), (c)(3), (c)(4), (c)(8), and (c)(9).
(c)(3) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67)
Employee Class
Monetary Wage Fringe Benefits
Laborer, Grounds Maintenance WG 3-1
$12.26 + $4.48
Laborer, Grounds Maintenance WG 3-5
$14.33+ $4.48
Janitor WG 2-1
$10.78+ $4.48
Janitor WG 2-5
$12.58 + $4.48
End of Addenda
End of Document.

Files

File Type Posted
36C78618Q9695-0004000.docx DOCX document
36C78618Q9695-0003000.docx DOCX document
36C78618Q9695-0002000.docx DOCX document
36C78618Q9695-0001000.docx DOCX document
36C78618Q9695-003.pdf PDF
36C78618Q9695-001.docx DOCX document
36C78618Q9695-004.docx DOCX document
36C78618Q9695-000.docx DOCX document
36C78618Q9695-002.pdf PDF

Notice history

Notice Type Posted
Grounds maintenance louisiana national cemetery Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors