Grindstone Recreation Area Wastewater Treatment Plant (WWTP) Analysis

Award Notice Posted

Solicitation number
12445121C0006
Agency
Awarded
to Dj&A, P.C.
Set-aside
Total Small Business

Opportunity facts

Contract number
12445121C0006 Federal contract award
NAICS code
541330 Engineering Services
PSC
C1ND Architect And Engineering- Construction: Sewage And Waste Facilities
Place of performance
Missoula, Montana 59808, United States

Notice details come from SAM.gov. Updated .

Notice text

Services under SRS Shortlist 12445121R0005

feasibility study should address the following challenges:

 NPDES permit requirements

 Aging treatment & collection infrastructure and inefficient design

 High annual maintenance and operation costs

 Remote system operation and management

 Seasonal operation and fluctuations

SCOPE OF WORK

PHASE 1: Feasibility Study and Assessment of Replacement Options

The goal of this phase is to study the feasibility of various wastewater treatment options available to replace the existing WWTP, to compare and assess the replacement

options, to recommend the most appropriate replacement option(s) and to provide a closeout plan for the existing wastewater treatment facility. This phase will include the

following activities and deliverables:

a. Review and document the existing Grindstone WWTP facility site and recreation facilities, operations, maintenance activities, historical records/documents, and NPDES

permit.

b. Review and document the recreation facilities currently served by the existing sewage treatment plant and evaluate projected wastewater flows generated by each facility.

c. Review the sanitary sewer infrastructure serving the existing WWTP.

d. Review the electrical and data/telecommunications systems serving the existing WWTP.

e. DELETED

f. Perform subsurface investigation and testing to develop and evaluate replacement WWTP options. It is assumed the USFS will provide an excavator to dig the test pits and

PVC pipe for the percolation tests. Test pit locations will be approved by the Virginia Department of Health (VDH). It is assumed there will be a maximum of five test pits

excavated with each test pit requiring a percolation test. Percolation tests will be performed by the prime contractor in accordance with VDH requirements. It is also assumed

there will be a water source available on site to conduct the percolation tests. Correspondence with VDH has indicated the new WWTP will not require a VDH permit due to its

location on federal land; however, all local and state rules and regulations will be followed. The prime contractor will handle all coordination with VDH as needed. For later

phases of the project, VDH has offered to provide a cursory review.

g. Items a. – e. will be completed during a 2-day site visit.

h. A tv inspection contractor will be subcontracted under the prime contractor to perform gravity sewer tv inspection of approximately 6,000 linear feet of gravity sewer

collection main. The tv inspection will be used to evaluate the existing collection system and inform recommendations. The tv inspection contractor will jet the existing collection

system prior to the tv inspection. Recordings for all of the gravity sewer collection system inspections will be provided to the prime contractor. It is assumed that it will take

approximately five working days to complete the tv inspection.

i. Prepare a feasibility study report detailing replacement of the existing WWTP with simpler and more cost-effective wastewater treatment options. The alternative treatment

options must eliminate the requirement for an NPDES permit and should be sited within, adjacent to, or close-by the existing WWTP. The feasibility study report should evaluate

and consider using components of the existing wastewater infrastructure following some rehabilitation. However, the cost/benefit of new versus rehabilitation must be

considered. The report, not including appendices, will be approximately 30- to 40-pages and will be used to scope the next phase of the project.

j. Provide an assessment and cost analysis of the replacement options identified/recommended in the feasibility study to include comparisons of up to 4 options for treatment

and collection (including a “no action” alternative) identified in collaboration with USFS prior to detailing options. At a minimum, comparisons should include environmental

impact, seasonal operation/fluctuations, operational complexity, remote operation/management, repair/replacement costs, system vulnerability to infrastructure failure, cost

analysis (should include, capital/construction costs, annual operation and maintenance costs, energy savings and life cycle costs), certified operator requirements, options for

phasing, implementation timeline, construction schedule and anticipated service life. A “best replacement option” recommendation shall be made to the USFS as a final

outcome of the assessment including estimated costs and schedules for design and construction.

k. Prepare a closure plan outlining possible approaches for decommissioning the existing wastewater treatment plant prior to construction of the new wastewater system that

would eliminate wastewater discharging and terminate the VDH DEQ NPDES or other operating permits until demolition of the existing can be completed while still providing

limited operations and access to the recreation facilities. Potential closure concepts will be presented in a brief 3- to 4- page technical memorandum, not including attachment.

Awarded contract 12445121C0006 to DJ&A, P.C. for 58931.43 on 2021-06-14.