Granite Surface Plate Calibration and lapping - with Q&As
Closed Solicitation Posted
- Solicitation number
- W519TC27QA007
- Agency
-
ACC Rock Island
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541380 Testing Laboratories and Services
- Place of performance
- Rock Island, Illinois 61299, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Army Contracting Command–Rock Island is soliciting offers under W519TC27QA007 for inspection, calibration, and lapping of granite surface plates at the Joint Manufacturing and Technology Center (JMTC), Rock Island Arsenal, with offers due November 9, 2026 at 10:00 AM. The acquisition is unrestricted, with no set-aside used, and is issued under FAR Part 12 as a commercial services buy. Questions were answered in the solicitation's Q&A, and the updated solicitation and new QASP attachment posted October 20, 2026.
Performance is at Rock Island, Illinois, with inspection and acceptance at Building 299, Rock Island Arsenal. The base period runs February 2, 2027 through February 1, 2028, with four one-year options through February 1, 2032. Offerors must price the base year and all four options on a firm-fixed basis. The scope covers 20 plates (six Laboratory Grade AA and fourteen Laboratory Grade A, ranging from 48 x 72 to 96 x 144 inches), with annual calibration and lapping to ASME B89.3.7. The contractor must be ISO 17025 accredited and deliver a Service Acceptance Report within three business days of completion. Per the Q&A, calibration is a firm-fixed lot price, lapping is priced separately at an hourly rate and performed only when authorized by the Contracting Officer or COR, and estimated travel is included in firm-fixed pricing, with actual costs billed after service.
Security requirements include CAC issuance with NACI investigations, background checks, Real-ID-compliant personnel, visitor access passes, AT Level I awareness training within 60 days, iWATCH briefings, RAMP participation, FPCON compliance, IT escort for any vendor access to JMTC information systems, and scanning of removable media before use. The solicitation does not state evaluation criteria or a estimated award value.
Notice text
2 versions
Update #2 · Latest ·
Q&A's:
1. CLINs 0001 through 0005 (pages 3-5) are each one firm-fixed-price lot for "Inspection and calibration." SOW paragraphs 1 and 4.2 (pages 1-2) call for lapping only of plates that are out of specification, the QASP (Attachment 0002, page 1) says lapping repairs must be authorized by the CO or COR, and Section G, paragraph 6.a (page 12) asks for labor rates. Should each year's lot price cover inspection and calibration of all 18 plates, with lapping priced separately (for example, a per-plate price or an hourly labor rate) and billed only when authorized? Or should the lot price include all lapping that may be needed that year? If lapping is priced separately, where in the quote should those prices or rates be shown?
Answer: Firm fixed for calibration of all plates listed in the SOW. Lapping to be priced separately. We don’t know which plates will require lapping or how much lapping per plate will be needed. We are asking for an hourly rate for lapping. Whether the plate is big or small, the hourly rate would be the same. Plates may require a lot of lapping or very little. Pricing lapping by the plate doesn’t seem to make much sense.
2. Each CLIN (pages 3-5) states "All travel shall be in accordance with the Joint Travel Regulation (JTR)," and SOW paragraph 2 (page 1) says invoices will be checked against the contract prices and JTR approved prices. Should travel be included in each year's firm-fixed lot price, or will it be reimbursed separately at JTR rates? If it is reimbursed separately, how should travel be shown in the quote?
Answer: Include estimated travel costs in the firm-fixed pricing. The Vendor that gets the award will bill actual costs after the service.
3. Section G, paragraph 6.c (page 12) asks offerors to "concur at the bottom of the Scope of Work (SOW) and sign," but Attachment 0001 ends at paragraph 15.1 on page 4 with no concurrence or signature block. Is it acceptable to add a signed and dated concurrence statement at the bottom of SOW page 4, or to submit a separate signed concurrence page on company letterhead that references Attachment 0001 dated 15 Oct 26?
Answer: Either is fine by me.
_______________________
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action.
Update #1 ·
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Burner Rack Cradle Assembly | ACC Rock Island | No set-aside | |
| Wafer broach holding bar | ACC Rock Island | No set-aside | |
| DRS M7A1 hdpe platform | ACC Rock Island | Total Small Business | |
| CAAA Rapid Acquisition Sustainment Program (RASP) BOA | ACC Rock Island | No set-aside | |
| M82 Energetics | ACC Rock Island | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity