Attachment 0002 - QASP - Granite Surface Plates.pdf
PDF 158 KB Posted
- Solicitation number
- W519TC27QA007
About this file
This is a Quality Assurance Surveillance Plan (QASP) for granite surface plate services. The contractor is required to perform remedial repair (RR), preventive maintenance (PM), and calibration (CAL) services on granite surface plates in accordance with the ANSI Z540 standard and the Statement of Work (SOW).
TARA-PQ personnel will conduct 100% inspection of all contractor performance to verify compliance with the QASP requirements. Surveillance methods are defined for five key service areas: Performance (paragraph 4.4, IAW SOW, 0% AQL), Calibrations (paragraph 4.1, IAW ANSI Z-540-1 standards and traceable to N.I.S.T, 100% AQL), Schedule Service (paragraph 4.4, ensuring machines are calibrated/certified on or before due date, 0% AQL), Lapping (paragraph 4.4, ensuring all repairs are authorized by Contracting Officer or Contracting Officer's Representative, 0% AQL), and Service Acceptance Report (paragraph 4.3, ensuring all parts and labor costs are itemized, 0% AQL). TARA-QA personnel will analyze results from all RR, PM, and CAL operations and coordinate any issues with the contractor. All surveillance methods employ 100% inspection with acceptance-quality levels ranging from 0% to 100% depending on the service category.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - W519TC27QA007 - updated.pdf | ||
| Solicitation - W519TC27QA007.pdf | ||
| Attachment 0001 - Scope of Work (SOW).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Granite Surface Plates – Remedial Repair (RR), Preventive Maintenance (PM) & Calibration (CAL)
1. CONTRACT REQUIREMENT:
The contractor is to perform calibration and lapping of Granite Surface Plates outlined in the SOW IAW the ANSI Z540 standard.
2. PRIMARY METHOD OF SURVEILLANCE:
The contractor’s performance will be inspected by TARA-PQ personnel to ensure all requirements have been met IAW this QASP.
Specific inspection methods are outlined below.
3. ANALYSIS OF RESULTS:
TARA-QA personnel will analyze the results of the RR, PM & CAL operations and coordinate any issues with the contractor.
Service Paragraph
Letter/Number
Standards AQL & Lot Size Method of Surveillance
Performance 4.4 IAW SOW 0%
N/A
100% Inspection
Calibrations 4.1 IAW ANSI Z-540-1 standards
& traceable to N.I.S.T
100%
IAW ANSI requirements
100% Inspection
Schedule Service 4.4 IAW SOW – ensure machines are calibrated/certified on or before due date
0%
NA
100% Inspection
Lapping 4.4 IAW SOW – ensure all repairs are authorized by CO or COR
0%
NA
100% Inspection
Service Acceptance
Report (SAR)
4.3 IAW SOW – ensure all parts
and labor costs are itemized
0%
NA
100% Inspection
File details come from the government source that posted it. Updated .