Grand Coulee Right Powerplant, GSU Transformer Replacements, Columbia Basin Pro

Closed Pre-Solicitation Posted

Solicitation number
140R1025R0005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Washington 99133, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Reclamation is seeking contractors for the Grand Coulee Right Powerplant GSU Transformer Replacements project in Washington State, approximately 90 miles west of Spokane. The project involves replacing three in-service, single-phase Generator Step-Up (GSU) power transformers, with comprehensive requirements including manufacturing, testing, transportation, removal, and disposal of existing transformers. Key contract requirements include handling asbestos materials, installing seismic anchorage systems, modifying fire protection systems, and complying with Buy American provisions. Evaluation criteria will likely focus on contractors' capabilities, past performance on similar high-value projects (minimum $8M), transformer manufacturer details, and demonstrated expertise in power infrastructure replacements. The sources sought notice response deadline is February 11, 2025, at 5 PM Mountain Time, with an anticipated contract award in fiscal year 2026.

The contract is not set aside for any specific small business designation and falls under NAICS codes 237130 (Power and Communication Line Construction, $45M size standard) and 335311 (Transformer Manufacturing, 800-employee size standard). The estimated contract value exceeds $10 million, with the project requiring three new 50 MVA transformers featuring synthetic ester fluid insulation and specific voltage and temperature requirements. Contractors will need to demonstrate capabilities for comprehensive transformer replacement, including removing existing equipment, installing new infrastructure, and modifying electrical connections. The work will be performed at the Grand Coulee Dam, which can be accessed via a government-owned rail siding in Odair, Washington. The contract will likely be structured as a hybrid Firm Fixed Price arrangement for both construction and supply components.

Notice text

3 versions

Update #3 · Latest ·

Grand Coulee Right Powerplant GSU Transformer Replacements, Columbia Basin Project, Washington, Columbia-Pacific Northwest Region 9
See Sources Sought attachments

Be advised, that there is an amended Sources Sought document only. The draft spec pages from the original sources sought announcement remains unchanged.

This amendment provides anticipated Insulating Fluid requirement to the sources sought document.

Update #2 ·

Grand Coulee Right Powerplant GSU Transformer Replacements, Columbia Basin Project, Washington, Columbia-Pacific Northwest Region 9
See Sources Sought attachments

Be advised, that there is an amended Sources Sought document only. The draft spec pages from the original sources sought announcement remains unchanged.

Update #1 ·

Grand Coulee Right Powerplant GSU Transformer Replacements, Columbia Basin Project, Washington, Columbia-Pacific Northwest Region 9
See Sources Sought attachment

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
LLA Navigation Lock Switchgear Pomeroy, Washington 99347, United States · NAICS 238210 ENDIST Walla Walla Total Small Business
East Bear Creek Pumping Plant and Pipeline Moderni NAICS 237990 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors