Grand Coulee Dam Left and Right Powerplants G1-G18 Penstock Lining Rehabilitati
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140R1020R0013
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- More information
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks information from interested parties for the Grand Coulee Dam left and right powerplant G1-G18 penstock lining rehabilitation project for the Bureau of Reclamation. Firms must have experience providing labor, equipment, and materials for spot and zone lining repairs as well as complete lining removal and re-lining of 18 penstock interiors. Respondents must demonstrate bonding capacity, size/SBA status, capability to manage complex requirements, and experience with similar projects. Statements of interest must be submitted by April 2, 2020.
There is no set-aside designated for this potential award, which has a budget between $10-20 million. Interested parties must operate under NAICS code 237990 and have experience with complex civil construction projects. Responses should include contact information, bonding levels, size status, and examples of relevant past performance. The deadline for responses is April 2, 2020, and the agency seeks qualified firms to rehabilitate and replace penstock lining at the Grand Coulee Dam powerplants.
Notice text
Sources Sought
Grand Coulee Dam Left & Right Powerplants G1-G18 Penstock Lining Rehabilitation
1.01 SYNOPSIS
A. Work is located at Grand Coulee Dam, adjacent to the cities of Grand Coulee and Coulee Dam in Grant and Okanogan Counties, approximately 90 miles west of Spokane, Washington.
B. The Bureau of Reclamation (Reclamation) is conducting market research for the Grand Coulee Dam left and right powerplant G1-G18 penstock lining rehabilitation, Columbia Basin Project. The Grand Coulee left and right powerplant contains 18 main generators. Grand Coulee Dam is operated by Reclamation as a multi-purpose reservoir to provide recreation, power generation, and flood control to meet irrigation needs. Reservoir discharges through the penstocks and powerplant will be halted for the specified outage window. This requirement has an order of magnitude between $10,000,000 and $20,000,000.
C. The Principle Components of work to be performed includes the following:
Penstock Lining Repairs and Replacement:
a) Minimum of Spot and Zone lining repairs of the following Units¿ penstock interiors. The Government will inspect the following penstock interiors within 7 calendar days after the start of the respective penstocks outage. The Government reserves the right to exercise the option CLIN pertaining to the respective penstock within 14 calendar days after the start of the respective penstocks outage.
1. G1
2. G2
3. G3
4. G5
5. G6
6. G7
7. G8
8. G9
9. G11
10. G12
11. G16
b) Complete lining removal and re-lining of the penstock interiors for Units:
1. G4
2. G10
3. G13
4. G14
5. G15
6. G17
7. G18
c) Removal and re-installation of the surface-mounted flowmeters and associated conduits to facilitate access to the penstock surface in Units:
1. G2
2. G8 if full re-lining is implemented
3. G9
4. G12
D. The intent of this notice is to identify potential interested offerors for the Grand Coulee Dam left and right powerplant G1-G18 penstock lining rehabilitation, Columbia Basin Project. Reclamation is seeking qualified, experienced firm capable of providing the labor, equipment, and materials necessary to accomplish the Principle Components of Work identified above and as identified within the project specifications and drawings (drawings not included herein and must be requested). Interested offerors are invited to submit the following information:
1. Statement of interest as a prime and/or subcontractor
2. Construction bonding level, aggregate and per contract
3. Point of contact information
4. Size status and/or SBA certification program for NAICS 237990
5. Firms capability to successfully manage complex requirements
6. Recent projects similar in size and scope
E. Responses to this Sources Sought are due No Later Than (NLT) 1:00pm MDT, Thursday 2nd April 2020. All responses are to be sent to lfleming@usbr.gov.
F. This market research is for informational purposes only. This announcement does not constitute a commitment, implied or otherwise, that a procurement action will be issued, and shall not be construed as a Request for Proposal or Invitation for Bid, or as an obligation on the part of the Government. No entitlement to payment will arise as a result of the submission of contractor information.
G. Any questions regarding this announcement should be sent to lfleming@usbr.gov. Phone calls will not be accepted.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Grand Coulee Dam Left and Right Powerplants G1-G18 | Award Notice | |
| Grand Coulee Dam Left and Right Powerplants G1-G18 | Solicitation | |
| Grand Coulee Dam Left and Right Powerplants G1-G18 Penstock Lining Rehabilitati | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| East Bear Creek Pumping Plant and Pipeline Moderni | — | No set-aside | |
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| Bonneville Powerhouse II Unwatering Pump Replacement | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity