Golf Course/Pedestrian Walkway Bridge

Closed Pre-Solicitation Posted

Solicitation number
F2M3CB6020A001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
San Antonio, Texas 78263, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Education and Training Command, through the 502D Air Base Wing, is conducting market research for the removal and replacement of two pedestrian walkway bridges at Joint Base San Antonio (JBSA) locations in Texas. The contractor must provide all management, tools, equipment, labor, materials, and transportation necessary to remove the existing Hole 18 Golf Cart Bridge (B490) at JBSA Lackland and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex, and install structurally sound prefabricated replacement bridges that comply with Americans with Disabilities Act (ADA) standards. Key requirements include developing a Quality Control Plan addressing workmanship and defect correction, maintaining compliance with OSHA safety and environmental regulations, providing manufacturer warranties and operation/maintenance manuals, and ensuring zero defects per month with an on-site contract manager available within one hour during duty hours. This is a sources sought notice for market research purposes under Federal Acquisition Regulation Part 10, and respondents should note that no formal contract award is anticipated at this stage and participants will not receive evaluation results or notifications. Interested contractors must submit responses in MS Word or Adobe PDF format to Miranda Garza (miranda.garza.2@us.af.mil) and Lauren Macias (lauren.macias.1@us.af.mil) by February 17, 2026, at 11:00 a.m. Central Standard Time.

This opportunity is designated as a Total Small Business set-aside. The procurement involves two distinct line items: the golf cart bridge at Lackland must be at least eight feet wide and 85 feet long with 42-inch-high steel railings and an eight-ton load capacity, while the pedestrian bridge at Chapman Training Annex must be at least eight feet wide and 80 feet long with 50-inch-high fully welded steel railings and an eight-ton load capacity. Both bridges require pressure-treated Douglas Fir wood decking, black corrosion-preventative compound on steel structures, and corrosion-resistant powder finishes on rails. The solicitation does not identify any current contractors or incumbents, and no specific award value or budget range is disclosed in the sources sought notice, as this is preliminary market research to inform future acquisition planning and technical requirements. Contractors interested in responding should address their NAICS code (811310), small business status and socio-economic designations if applicable, cost estimates for unit pricing, estimated lead times to completion, and relevant military, governmental, or commercial project experience with contract numbers and points of contact.

Notice text

2 versions

Update #2 · Latest ·

10 February 2026: The Sources Sought Notice attachment and General Information section were updated to reflect a response due date of 17 February 2026, 11:00am Central Standard Time (CST).

------------------------------------------------------------------------------------------------------------------------This is a sources sought notice for the removal and replacement of two (2) pedestrian walkway bridges at Joint Base San Antonio (JBSA) Lackland, TX. The contractor shall provide all management, tools, equipment, and labor necessary to ensure that the removal and replacement of the existing Hole 18 Golf Cart Bridge (B490) and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex (CTA) are conducted in a manner that will provide a structurally sound prefabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA).

The Government is conducting market research IAW Far Part 10. Please, review and fill out the attached Sources Sought form and return to the POCs listed in this notice if interested.

Update #1 ·

This is a sources sought notice for the removal and replacement of two (2) pedestrian walkway bridges at Joint Base San Antonio (JBSA) Lackland, TX. The contractor shall provide all management, tools, equipment, and labor necessary to ensure that the removal and replacement of the existing Hole 18 Golf Cart Bridge (B490) and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex (CTA) are conducted in a manner that will provide a structurally sound prefabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA).

The Government is conducting market research IAW Far Part 10. Please, review and fill out the attached Sources Sought form and return to the POCs listed in this notice if interested.

Files

File Type Posted
Sources Sought Notice.docx DOCX document
Sources Sought Notice.docx DOCX document
Attachment 1 - PWS Remove and Replace Bridge_Updated 30 SEPT 25.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity