GMNF FR59-4. 9 Culvert Replacement

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
12441923B0003_Synopsis_Pre-Solicitation_Notice
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Ripton, Vermont 05766, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for a construction project to replace a culvert on Forest Road 59-4.9 in the Green Mountain National Forest in Ripton, Vermont. The scope of work includes excavation, removal of an existing culvert, installation of a government-furnished plate arch culvert, construction of concrete substructures and stream simulation features, roadway reconstruction, and approach work. The U.S. Department of Agriculture Forest Service will issue an invitation for bid on May 5, 2023 with bid opening scheduled for May 23, 2023. Contractors must complete all work no later than October 31, 2024.

The project has a total small business set-aside designation. The anticipated price range for replacement of the single culvert is between $250,000 and $500,000. Applicable specifications include the U.S. DOT FP-14 and Forest Service Supplemental Specifications, along with Davis-Bacon wage determination VT20230048. Technical evaluation will be based on the contractor's ability to meet the specifications and complete the project by the designated deadline.

Notice text

SCOPE OF CONTRACT

The Forest Road 59 – 4.9 Culvert Replacement Contract work shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, construction of concrete substructures, stream simulation, roadway reconstruction, and approach work. The Contractor shall utilize a Government-furnished plate arch. The Contractor shall furnish all new hardware for the plate arch. See Attachments 2 and 5 for additional details.

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Work in accordance with the Specifications referenced below.

PROJECT LOCATION

FR59 – 4.9 culvert is located in the Green Mountain National Forest in Ripton, VT, 05766 in Addison County.

MAGNITUDE OF CONSTRUCTION PROJECT

Per FAR Subpart 36.204, the anticipated price range of this project is between $250,000 and $500,000.

TECHNICAL SPECIFICATIONS

The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and its revisions are included by reference only (see Attachment 3).  Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein.  The requirements contained in these specifications are hereby made a part of this Invitation for Bid and any resulting contract.

FP-14 can be downloaded directly from the following website free of charge:  https://highways.dot.gov/federal-lands/specs.

Please note, it is the responsibility of the Contractor to verify they are using the current version.

In addition to the specifications referenced above, the Forest Service Supplemental Specifications (FSSS) are revisions to the Standard Specifications (FP-14) that incorporate changes and/or additions that are specific requirements unique to this particular project also apply (see Attachment 4). 

The applicable Wage Determination is VT20230048 (see Attachment 6).

KEY DATES

Tentative date for issuing the Invitation for Bid is 05/05/2023.

Tentative date for opening bids is 05/23/2023.

Project must be completed by 10/31/2024.  

The solicitation and all supporting documents will be posted on this website (SAM.gov) free of charge.

ATTACHMENTS

Attachment 1 - Reserved

Attachment 2 - Plate Arch Assy and Install Manual_For Information Only

Attachment 3 - DOT-FHA Standard Specifications for Construction of Roads and Bridges (FP-14)

Attachment 4 - GMNF FR10-10.4 Culvert Replacement_FSSS_3.30.2023

Attachment 5 - GMNF FR59-4.9 Culvert Replacement_Plans

Attachment 6 - Davis-Bacon Act WD VT20230048

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GMNF FR59-4. 9 Culvert Replacement Latest solicitation Solicitation
GMNF FR59-4. 9 Culvert Replacement This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity