Attachment 2 - Plate Arch Assy and Install Manual_For Information Only.pdf
PDF 13 MB Posted
- Attached to
- GMNF FR59-4. 9 Culvert Replacement
- Solicitation number
- 12441923B0003_Synopsis_Pre-Solicitation_Notice
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides details for a federal contract opportunity for culvert replacement work on Forest Road 59 - 4.9 in the Green Mountain National Forest in Ripton, Vermont. The scope of work includes excavation, removal of an existing culvert, construction of a plate arch structure utilizing a government-furnished plate arch, construction of concrete substructures and stream simulation, roadway reconstruction, and approach work. The anticipated price range for the project is between $250,000 and $500,000. The solicitation is expected to be issued on May 5, 2023 with bids opening on May 23, 2023 and work must be completed by October 31, 2024. Relevant attachments include plans and specifications for the project as well as the applicable Davis-Bacon wage determination. The solicitation and supporting documents will be posted on SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MULTI-PLATE Product Assembly Instructions and Installation Precautions
| MULTI-PLATE Round and Elliptical Structures |
| MULTI-PLATE Pipe-Arch and Underpass |
| MULTI-PLATE Arches |
| MULTI-PLATE Box Culvert |
File details come from the government source that posted it. Updated .