Geotechnical drilling NV flap was CR 34(1) county road 34

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF26Q000011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Gerlach, Nevada, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration seeks geotechnical drilling services for 11 miles of Washoe County Road 34 near Gerlach, Nevada, with quotations due June 5 at 2:00 p.m. Mountain Time and technical questions due May 29. The procurement is set-aside for Total Small Business under NAICS 541330, Engineering Services (size standard $19.0 million).

Place of performance is Gerlach, Nevada (approximately 100 miles north of Reno). Work consists of thirty-four shallow borings (5-foot depth or until refusal) along CR 34 north of its intersection with CR 447, with drilling scheduled for June or July 2026. The contractor must provide a truck-mounted drill rig with 6-inch outside diameter auger, a three-person crew (journeyman-level drill operator, drill helper, and laborer with pickup truck), mobilization and demobilization, utility locates, traffic control setup, sample collection supplies (twenty 5-gallon buckets with lids), backfilling materials (pea gravel and cold mix asphalt patch), and office work and task management. Work is estimated at a maximum of 10 hours (one day of drilling) with contractor and FHWA meeting at 8 a.m. at Bruno's Country Club in Gerlach.

Quotations must be submitted electronically as PDF files not exceeding 10 megabytes and include technical capability, pricing, past performance, and mandatory organizational information. Payment uses a fixed-price structure with three Contract Line Item Numbers for mobilization/demobilization (lump sum), drill work (hourly rate for 10 hours), and miscellaneous supplies (lump sum). Davis Bacon wages do not apply. All contractors must maintain current active registration in SAM.gov. A June 1 questions and answers document clarified that pre-coring of asphalt is not required and confirmed the 10-hour labor allocation is binding; bidders may not request adjustment to higher hour estimates.

Notice text

Project Description/Location: The project consists of geotechnical drilling (through the existing pavement) for the 11 miles of Washoe County Road 34 (CR 34) north of its intersection with CR 447 (40.655506, 119.363147) just north of the Town of Gerlach, Nevada (see attached location map). The Town of Gerlach is located approximately 100 miles north of Reno, Nevada.

Files

Notice history

Notice Type Posted
Geotechnical drilling NV flap was CR 34(1) county road 34 Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement Oregon, United States · NAICS 238910 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors