DoD SBIR topic AF161-008

Component: USAF

Command: AFSC-HILL

Phase: SBIR Program Phase I Action

Technology Areas: Materials

Keywords: generators; energy production; support equipment; power; efficient depot

Objective:

The objective of this topic is to increase the depot energy efficiency by utilizing electrical energy produced by testing generators.

Description:

The Air Force tests and repairs both airborne and ground power generators. The generators are mainly AC with one 277V DC generator. Several generators are run, sometimes for several hours at a time, to perform test and repair functions. There is an opportunity here to capture the power being created by the test generators. The Air Force desires to capture the test energy to enhance facilities energy efficiency and have a positive environmental impact.

The generator tests must conform to and meet technical order (TO) requirements. Essentially the generators are run/tested at 0-, 25-, 50- and 100-percent loads for a certain amount of time. The critical requirement is to be able to accurately apply the load while the test stand monitors the generator. There are both resistive and reactive elements to the loads that must be applied.

The AC generators produce either 120V or 208V output at either 60Hz or 400Hz. The size of the generators range form 10kW up to 900kW. The facility has both 120V and 208V electrical power.

Phase I:

Develop a solution that meets above requirements and conduct preliminary business case analysis (BCA) to determine implementation costs, including a return-on-investment (ROI) calculation that compares anticipated savings to expected costs. Proof-of-concept prototype(s) shall be developed to demonstrate conformance to the requirements. Investigate/prepare paper work for required certifications.

Phase II:

Proof-of-concept prototype(s) shall be refined to a flight-ready article and shall undergo testing to validate all requirements. This process may require multiple iterations before a final design is selected. Refine BCA/ROI based on the final design. Obtain certifications/authorization to put energy into the building / power grid.

Phase III:

If cost effective, implement developed technology.

Files

File Type Posted
AF161-008.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors