AF161-008: Generator Power Recapture
PROJECTED CMMC LEVEL REQUIREMENT:
N/A
TECHNOLOGY AREAS:
Materials
MODERNIZATION PRIORITIES:
KEYWORDS:
generators, energy production, support equipment, power, efficient depot
ADDITIONAL INFORMATION
OBJECTIVE:
The objective of this topic is to increase the depot energy efficiency by utilizing electrical energy produced by testing generators.
DESCRIPTION:
The Air Force tests and repairs both airborne and ground power generators. The generators are mainly AC with one 277V DC generator. Several generators are run, sometimes for several hours at a time, to perform test and repair functions. There is an opportunity here to capture the power being created by the test generators. The Air Force desires to capture the test energy to enhance facilities energy efficiency and have a positive environmental impact. The generator tests must conform to and meet technical order (TO) requirements. Essentially the generators are run/tested at 0-, 25-, 50- and 100-percent loads for a certain amount of time. The critical requirement is to be able to accurately apply the load while the test stand monitors the generator. There are both resistive and reactive elements to the loads that must be applied. The AC generators produce either 120V or 208V output at either 60Hz or 400Hz. The size of the generators range form 10kW up to 900kW. The facility has both 120V and 208V electrical power.
PHASE I:
Develop a solution that meets above requirements and conduct preliminary business case analysis (BCA) to determine implementation costs, including a return-on-investment (ROI) calculation that compares anticipated savings to expected costs. Proof-of-concept prototype(s) shall be developed to demonstrate conformance to the requirements. Investigate/prepare paper work for required certifications.
PHASE II:
Proof-of-concept prototype(s) shall be refined to a flight-ready article and shall undergo testing to validate all requirements. This process may require multiple iterations before a final design is selected. Refine BCA/ROI based on the final design. Obtain certifications/authorization to put energy into the building / power grid.
PHASE III DUAL USE APPLICATIONS:
If cost effective, implement developed technology.
REFERENCES:
DoD Directive 4140.25, DoD Management Policy for Energy Commodities and Related Services, April 12, 2004.
1.
Energy Reduction at U.S. Air Force Facilities Using Industrial Processes, Copyright 2013.2.
DoD Directive 5134.15, Assistant Secretary of Defense for Operational Energy Plans and Programs, May 17, 2011.
3.
DoD Directive 5126.46, Defense Energy Information System, December 2, 1987.4.
U.S. Air Force Energy STRATEGIC PLAN, March 2013.5.
Energy Independence and Security Act (EISA) of 2007, Public Law 110-140, December 19, 2007.6.
Energy Policy Act of 2005 (EPAct 2005), Public Law 109-58, August 8, 2005.7.
Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, October 5, 2009.
8.
DoD Instruction 4170.10, Energy Management Policy, August 8, 1991.9.
Sample Technical Orders: 8C7-2-49-3, 8A6-8-11-3, 35C2-3-462-3, 35C2-3-395-3, 8A6-9-8-3.10.