GBSD Integrated Command Center - FE Warren AFB

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F23R0022
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1JZ Construction Of Miscellaneous Buildings
Place of performance
FE Warren AFB, Wyoming 82001, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The federal contract opportunity involves the construction of the Integrated Command Center (ICC) at F.E. Warren Air Force Base. The ICC will be a multi-story facility meeting Intelligence Community Directive 705 technical standards and will include site improvements, utilities, pavements, communications, electrical work, and all associated support facilities. The estimated construction cost of this project is between $100,000,000 and $250,000,000, with the contract expected to be awarded on 31st July 2023 and the work to be completed within 900 calendar days after receiving the award.

List of services and products to be provided:

  1. Construction of the ICC Building
  2. Construction of the HEMP Shielding
  3. Construction of Sitework, Utilities, and Pavements
  4. High West Energy scope of work
  5. Environmental Remediation of any contaminated soil or ground water
  6. Cybersecurity documentation and alterations to commercial equipment, devices, firmware and software
  7. Procurement and Installation of Furniture, Fixtures & Equipment
  8. Procurement and Installation of UPS Equipment
  9. Procurement and Installation of LCD Displays, VTC Conference Rooms and Communication Head-sets
  10. Procurement and Installation of Electronic Security Equipment
  11. Procurement and Installation of all Communications & IT Equipment
  12. Excavation & transportation of contaminated soil off site to approved landfill
  13. Additional Filtration for removal of Ground Water Contaminants.

Notice text

9 versions

Update #9 · Latest ·

***AM-0008 - Updated Wage Rate***

***AM-0007 - Updated Wage Rate and Offeror Acceptance Period Revision***

***AM-0006 - Updated Wage Rate and Offeror Acceptance Period Revision***

***AM-0005- Revised Specs/Drawings, Proposal Due Date Extension***

***AM-0004 - Revised Specs/Drawings***

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #8 ·

***AM-0006 - Updated Wage Rate and Offeror Acceptance Period Revision***

***AM-0006 - Updated Wage Rate and Offeror Acceptance Period Revision***

***AM-0005- Revised Specs/Drawings, Proposal Due Date Extension***

***AM-0004 - Revised Specs/Drawings***

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #7 ·

***AM-0006 - Updated Wage Rate and Offeror Acceptance Period Revision***

***AM-0005- Revised Specs/Drawings, Proposal Due Date Extension***

***AM-0004 - Revised Specs/Drawings***

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #6 ·

***AM-0005- Revised Specs/Drawings, Proposal Due Date Extension***

***AM-0004 - Revised Specs/Drawings***

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #5 ·

***AM-0004 - Revised Specs/Drawings***

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #4 ·

***AM-0003 - Revised DIV 21/22, updated Specs/Drawings and removal of NOFORN***

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings must be requested via DoD SAFE, in order to access drawings***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #3 ·

***AM-0002 - Revised DIV 22 and Specs/Drawings***

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings are CUI/NOFORN and must be requested via DoD SAFE, in order to access drawings proof of U.S. Citizenship must be provided by the requester via, (1) Birth Certificate, (2) U.S. Passport, (3) Certifiacte of Citizenship or (4) Naturalization Certificate***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #2 ·

***AM-0001 - Revised DIV 22 and updated header to CUI/NOFORN***

***Specifications and Drawings are CUI/NOFORN and must be requested via DoD SAFE, in order to access drawings proof of U.S. Citizenship must be provided by the requester via, (1) Birth Certificate, (2) U.S. Passport, (3) Certifiacte of Citizenship or (4) Naturalization Certificate***

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Update #1 ·

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.

The construction acquisition method is design-bid-build (construction).

Project Description:

This project consists of renovating an approximate 60,000 Square Foot (SF) facility to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at F.E. Warren Air Force Base. This project will include a space or spaces constructed to secure area standard Intelligence Community Directive/Intelligence Community Standard 705 (ICD/ICS 705) See 01 14 00 WORK RESTRICTIONS for additional information and requirements. This project will include space or spaces for emergency power, High-altitude Electromagnetic Pulse (HEMP), and Chemical, Biological, Radiological protection measures. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. All work shall be in accordance with RFP documents issued within this solicitation.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within 900 calendar days after receipt of NTP. Clauses will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The magnitude of construction costs for this project is between $100,000,000 and $250,000,000.

Attachments

Show all 20

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GBSD Integrated Command Center - FE Warren AFB Award Award Notice
GBSD Integrated Command Center - FE Warren AFB This notice · Latest solicitation Solicitation
Notice of Intent for Brand Name Generators Special Notice
Notice of Intent for Brand Name Fire Alarm Panels Special Notice
Notice of Intent for Brand Name HVAC Chillers Special Notice
Sources Sought Announcement - GBSD ICC Fire Alarm Panels Pre-Solicitation
Sources Sought Announcement - GBSD ICC Facility Generator Pre-Solicitation
Sources Sought Announcement - GBSD ICC HVAC Chillers Pre-Solicitation
Draft RFP - GBSD Integrated Command Center, FE Warren AFB Special Notice
GBSD Integrated Command Center - FE Warren AFB Pre-Solicitation
GBSD Integrated Command Center - FE Warren AFB Original Pre-Solicitation
Show all 11

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity