Gavins Point Spillway Gate Heater Redesign

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F20Q0069
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
332313 Plate Work Manufacturing
PSC
9535 Plate, Sheet, Strip, And Foil; Nonferrous Base Metal
Place of performance
NE 68739 USA

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Amendment 1 has been posted to Attachments. 

The purpose of this amendment is to provide a minor correction to the dimension of the cover plate outer radius on the bridging drawings sheet M-101. 

The bottom cover plate outer radius on sheet M-101 shall be revised to read (29'-3" R, not 29'-2 3/16" R), such that the centerline radius of the bullnose bolt holes (29' 2 - 15/32") and the back wall plate will align with dimensions on the bullnose section.

The offer due date has not been extended. All other terms and conditions remain the same.

*******************************************************************************************************************

This project consists of the entire work to furnish all supervision, labor, materials, off-site facility, qualified aluminum welders, and equipment to fabricate new spillway gate wall heater aluminum plates and hardware shown on the bridged drawings. Work shall be completed by trained and certified fabricators who have minimum of 2 years of experience in the aluminum fabrication and welding work.

This work will be for a total of twenty eight (28) custom aluminum plates made in accordance to the specifications attached. Seven (7) back wall plates will be constructed as shown, along with seven (7) on the opposite hand for a total of fourteen (14) back wall plates. Seven (7) cover plates will be constructed as shown, along with seven (7) on the opposite hand for a total of fourteen (14) cover plates. Contractor will be responsible for transportation, loading / unloading of all furnished items to/from the Gavins Point Dam and contractor’s off-site facility. Contractor will not be involved in the installation 

Please see attached full solicitation for a more detailed Scope of Work, along with the Attachments for the bridging drawings and photos of the existing heater plates.

Update #1 ·

This project consists of the entire work to furnish all supervision, labor, materials, off-site facility, qualified aluminum welders, and equipment to fabricate new spillway gate wall heater aluminum plates and hardware shown on the bridged drawings. Work shall be completed by trained and certified fabricators who have minimum of 2 years of experience in the aluminum fabrication and welding work.

This work will be for a total of twenty eight (28) custom aluminum plates made in accordance to the specifications attached. Seven (7) back wall plates will be constructed as shown, along with seven (7) on the opposite hand for a total of fourteen (14) back wall plates. Seven (7) cover plates will be constructed as shown, along with seven (7) on the opposite hand for a total of fourteen (14) cover plates. Contractor will be responsible for transportation, loading / unloading of all furnished items to/from the Gavins Point Dam and contractor’s off-site facility. Contractor will not be involved in the installation 

Please see attached full solicitation for a more detailed Scope of Work, along with the Attachments for the bridging drawings and photos of the existing heater plates.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Gavins Point Spillway Gate Heater Redesign Award Award Notice
Gavins Point Spillway Gate Heater Redesign This notice · Latest solicitation Solicitation
Gavins Point Spillway Gate Heater Redesign Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity