Gaoa SFK dry blood DAM reconstruction
Award Notice Posted
- Solicitation number
- 140L0622R0038
- Agency
-
National Office
Bureau of Land Management, Department of the Interior
- Awarded
- to Youderian Construction Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 140L0622C0027 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management awarded a contract to Youderian Construction Inc. to repair the South Fork Dry Blood Dam located in Petroleum County, Montana. Under the terms of the contract valued at $1,452,462, Youderian Construction will perform reconstruction of the existing dam embankment and structures including replacement of the primary spillway, construction of a new principal spillway and outlet works, installation of erosion protection and internal filter/drain features, as well as site work such as access road construction and fencing replacement.
Notice text
The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair South Fork Dry Blood Dam located in Petroleum County, approximately 14 miles north of Winnet, MT. The requirement entails the following significant tasks:
1. Dewater reservoir and construction area.
2. Excavate a portion of the existing dam embankment and foundation to remove the existing primary spillway.
3. Reconstruct the dam embankment, including:
a. Placement of compacted fill from onsite borrow sources,
b. Placement of compacted lime amended fill,
c. Placement of imported erosion protection within excavated areas of the upstream face,
d. Placement of erosion protection matting within excavated areas of the downstream face,
e. Placement and compaction of imported sand and gravel for internal filter and drain features.
4. Construct a precast concrete spillway riser for a new principal spillway.
5. Construct concrete encased, precast reinforced concrete pipe outlet conduit.
6. Construct precast concrete low-level inlet structure.
7. Construct a grouted riprap stilling basin.
8. Place road gravel surfacing along the crest of the dam.
9. Construct a temporary construction access road from Valentine Rd. to the dam embankment crest, as necessary.
10. Construct improvements to the auxiliary spillway upstream and downstream of the dam centerline.
11. Remove existing barb wire fencing and cattle guards in the vicinity of the dam.
12. Install a cattle new cattle guard on Valentine Rd. and construct a new barb wire fence.
13. Reclaim all disturbed areas, including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding but does not include seeding.
Awarded contract 140L0622C0027 to YOUDERIAN CONSTRUCTION INC for 1452462 on 2022-09-15.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Gaoa SFK dry blood DAM reconstruction | Solicitation | |
| South Fork Dry Blood Dam Reconstruction | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity