Gaoa finale DAM reconstruction

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140L0625R0015
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management (BLM) is seeking sources for the GAOA Finale Dam Reconstruction project located in Valley County, Montana, approximately 41.5 miles southwest of Glasgow. The project involves comprehensive dam reconstruction services, including dewatering the reservoir, excavating the existing dam embankment, constructing new outlet works with precast concrete structures, building an auxiliary spillway, placing gravel road surfacing, and reclaiming disturbed areas. Interested businesses are required to submit detailed responses by June 12, 2025, at 5:00 PM MDT, providing company information, business classification, bonding capacity, and demonstrated experience in dam construction. The BLM will use these responses to develop an acquisition strategy and determine potential small business or socio-economic set-asides. Evaluation criteria will focus on companies' capabilities, past performance in heavy civil engineering construction, and ability to meet the technical specifications outlined in the draft project documents.

The pre-solicitation notice indicates no specific set-aside designations at this time, with the NAICS code 237990 for Other Heavy and Civil Construction and a small business size standard of $45.0M. The anticipated construction magnitude is between $1M-$5M, with a planned performance period of 431 calendar days. The solicitation is scheduled for release in July 2025, with bid, performance, and payment bonds expected to be required. The project involves reconstructing an existing dam infrastructure, including constructing a precast concrete outlet works riser, a concrete-encased reinforced concrete pipe outlet conduit, a low-level inlet structure, a grouted riprap stilling basin, an auxiliary spillway, and road gravel surfacing on the dam crest. Technical specifications emphasize precise materials placement, quality control, and long-term performance of the reconstructed dam infrastructure.

Notice text

This is a Sources sought Announcement for GAOA Finale Dam Reconstruction in accordance with drawings and specifications. Project is located in Valley County, Montana, approximately 41.5 miles southwest of Glasgow, MT.

Files

Notice history

Notice Type Posted
Gaoa finale DAM reconstruction Award Award Notice
Gaoa finale DAM reconstruction Latest solicitation Solicitation
Gaoa finale DAM reconstruction Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cableway crane refurbishment NAICS 237990 Bureau of Reclamation No set-aside
Sources Sought:Neopit Dam Remediation Construction NAICS 237990 Central Office No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business
Bradbury Dam Outlet Valve Replacement NAICS 237990 — No set-aside
East canal efficiency improvements NAICS 237110 Bureau of Reclamation Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity