GAOA Crow Valley Olive Ridge Water System

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
1240LT24B0001
Agency
Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Z1PA Maintenance Of Recreation Facilities (Non-Building)
Place of performance
Fort Collins, Colorado, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service R2-Rocky Mountain Region is seeking small business contractors to perform water system improvement work at the Crow Valley Campground and Olive Ridge Campground in Colorado. The work includes the removal and replacement of plumbing, electrical, pumps, tanks, and other system components. Contractors will be required to provide all labor, equipment, materials, and transportation to complete the specified work in compliance with the contract terms and specifications. Important dates include the solicitation posting on or about May 3, 2024, and a proposal due date of May 3, 2024. Performance and payment bonds as well as a bid guarantee will be required.

This contract opportunity is set aside 100% for small businesses under NAICS code 237110, with a size standard of $45.0 million. The estimated project value is between $500,000 and $1,000,000. The Engineering point of contact is Steven Wood, and work is expected to begin around July 1, 2024.

Notice text

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT MAY 3, 2024.

PROJECT DESCRIPTION: The Crow Valley Campground Water Improvement work consists of removal and replacement of existing plumbing and electrical, well pump and controls, hydro-pneumatic tank, electrical work, and yard hydrants. System components to be added include isolation valves and reduced pressure zone (RPZ) backflow preventers. Optional work includes removal and replacement of pipes and fittings connecting the two livestock tanks to the PVC distribution pipe.

The Olive Ridge Campground Water Improvement project consists of removal of an existing wood frame treatment building and foundation, new treatment building with upgraded plumbing and controls, new well pump, pit less unit and well cap, installation of chlorine feed equipment, equalization tank, booster pump and hydro-pneumatic tank, and associate electrical work and replacement of the distribution piping and yard hydrants and installation of day light drains.

PROJECT LOCATION: Crow Valley Campground & Briggsdale Work Center, is located approximately 1/2 mile north of Hwy 14 along CR 77, Colorado.

Olive Ridge Campground is located approximately 2 miles north of Allens Park, Colorado on State Highway 7.

Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around July 1, 2024. Engineering point of contact is Steven Wood, telephone: 970-295-6751. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $500,000 and $1,000,000. NAICS 237110 with size standard $45.0M. This project is set aside 100% for small business.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GAOA Crow Valley Olive Ridge Water System Award Award Notice
GAOA Crow Valley Olive Ridge Water System Latest solicitation Solicitation
GAOA Crow Valley Olive Ridge Water System This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity