FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC
Cancelled Solicitation Posted
- Solicitation number
- W912DY26RA120
- Agency
-
Engineering Support Center Huntsville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering Support Center Huntsville seeks design-build renovation of Buildings 61 and 62 at the National Defense University, Fort McNair, Washington, DC, with proposals due September 4, 2026. The procurement is a 100% Competitive 8(a) set-aside and requires a Facility Clearance; proposals from companies without a Facility Clearance will not be evaluated.
Place of performance is Fort McNair, Washington, DC. The work employs a two-step design-build procedure. A mandatory pre-proposal site visit is scheduled for Thursday at 9:00 AM EST, with potential extension to Friday; attendees must RSVP no later than 2:00 PM CST on July 21, 2026, to Jason Phillips (Project Manager), copying Kelvaun Kennedy (Contract Specialist) and Kelly Hunnicutt (Contracting Officer).
The NAICS code is 236220, Commercial and Institutional Building Construction; PSC is Y1JZ, Construction of Miscellaneous Buildings. The solicitation has issued eight amendments. Amendment 04 extended Phase 1 question due date to August 3 and Phase 1 submittal due date to August 5; Phase 2 technical questions are due August 6. Amendment 05 issued the DD254 Form and site visit sign-in sheet. Amendment 07 provided government responses to contractor questions, a revised SOW dated August 18, and added CLIN 0012. Amendment 08 extended the proposal due date to September 4, 2026. As-built drawings have been reuploaded.
Notice text
8 versions
Update #8 · Latest ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download. Amendment 0004 is issued to update As-Builts File 15 and extend due date for questions and Phase 1 submittals. Any questions in reference to Phase 1 submittals are due 03 August 2026. Phase 1 submittal due date is extended to 05 August. Any technical questions related to Phase 2 submittals are due 06 August. The purpose of Amendment 05 is to issue the Site Visit sign in sheet, Site Visit Slide Presentation, and the DD254 Form. Please note that proposals from companies without a Facility Clearance will not be evaluated. The purpose of Amendment 06 is to extend the proposal due date to 24 August 2026. Please be advised that the due date will be adjusted again when RFIs are posted. The purpose of Amendment 07 is to provide Government responses to contractor questions, revised SOW dated 18 Aug 2026, add CLIN 0012, additional supporting documents/attachments, and extend the proposal due date to 28 Aug 2026. The purpose of Amendment 08 is to extend the proposal due date to 04 September 2026.
Update #7 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download. Amendment 0004 is issued to update As-Builts File 15 and extend due date for questions and Phase 1 submittals. Any questions in reference to Phase 1 submittals are due 03 August 2026. Phase 1 submittal due date is extended to 05 August. Any technical questions related to Phase 2 submittals are due 06 August. The purpose of Amendment 05 is to issue the Site Visit sign in sheet, Site Visit Slide Presentation, and the DD254 Form. Please note that proposals from companies without a Facility Clearance will not be evaluated. The purpose of Amendment 06 is to extend the proposal due date to 24 August 2026. Please be advised that the due date will be adjusted again when RFIs are posted. The purpose of Amendment 07 is to provide Government responses to contractor questions, revised SOW dated 18 Aug 2026, add CLIN 0012, additional supporting documents/attachments, and extend the proposal due date to 28 Aug 2026.
Update #6 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download. Amendment 0004 is issued to update As-Builts File 15 and extend due date for questions and Phase 1 submittals. Any questions in reference to Phase 1 submittals are due 03 August 2026. Phase 1 submittal due date is extended to 05 August. Any technical questions related to Phase 2 submittals are due 06 August. The purpose of Amendment 05 is to issue the Site Visit sign in sheet, Site Visit Slide Presentation, and the DD254 Form. Please note that proposals from companies without a Facility Clearance will not be evaluated. The purpose of Amendment 06 is to extend the proposal due date to 24 August 2026. Please be advised that the due date will be adjusted again when RFIs are posted.
Update #5 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download. Amendment 0004 is issued to update As-Builts File 15 and extend due date for questions and Phase 1 submittals. Any questions in reference to Phase 1 submittals are due 03 August 2026. Phase 1 submittal due date is extended to 05 August. Any technical questions related to Phase 2 submittals are due 06 August. The purpose of Amendment 05 is to issue the Site Visit sign in sheet, Site Visit Slide Presentation, and the DD254 Form. Please note that proposals from companies without a Facility Clearance will not be evaluated.
Update #4 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download. Amendment 0004 is issued to update As-Builts File 15 and extend due date for questions and Phase 1 submittals. Any questions in reference to Phase 1 submittals are due 03 August 2026. Phase 1 submittal due date is extended to 05 August. Any technical questions related to Phase 2 submittals are due 06 August.
Update #3 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information. Amendment 0003 is issued to establish two step design build procedures. See revised basis for award and evaluation criteria. Original as built drawings have been reuploaded for ease of download.
Update #2 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM EST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil. Amendment 0002 is issued to correct site visit time from 9AM CST to 9AM EST and provide additional site visit information.
Update #1 ·
FY26 National Defense University (NDU) BLDG 61 and 62 Classroom Renovation, Fort McNair, Washington, DC. This action is a 100% Competitive 8(a) Set Aside. Site Visit Information: The pre-proposal site visit is Thursday at 9:00 AM CST with the potential it will be extended to Friday as well as needed. If you plan to attend, please RSVP NLT 2:00 PM CST on 21 July 2026 (or sooner) via e-mail to the Project Manager, Jason Phillips at email: Jason.S.Phillips@usace.army.mil, and copy Contract Specialist, Kelvaun Kennedy at email: Kelvaun.J.Kennedy@usace.army.mil, and Contracting Officer, Kelly Hunnicutt at email: Kelly.J.Hunnicutt@usace.army.mil.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Presolicitation Notice for Renovation of Vo-Tech - Fort Knox, Kentucky | ENDIST Louisville | Total Small Business | |
| Joint base lewis mcchord multi domain task force buildings 3223-3224, washington | ENDIST Seattle | Total Small Business | |
| RM16-1405 building 592 renovations | Naval Facilities Engineering Command | Competitive 8(a) | |
| Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX | ENDIST Louisville | Total Small Business | |
| Z1DA--Design Build | NRM 654-27-130 | Eliminate Trip Hazards Facility Wide VASNHCS | Veterans Integrated Service Network 21 | No set-aside |