FY26 G3 Aviation Solar Generator
Closed Solicitation Posted
- Solicitation number
- W9124B26QA004
- Agency
- MICC Fort Hood Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- Place of performance
- Bicycle Lake Army Airfield (Blaaf), Building 6212 92310
- Points of contact
-
- Franklin Brown franklin.w.brown4.civ@army.mil (760) 380-4450
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood seeks a 12-month lease for a comprehensive, turn-key portable solar generator system to support critical operations at Bicycle Lake Army Airfield (BLAAF) at Fort Irwin, California. The system must deliver a minimum continuous power output of 1,800 watts (240VAC at 7.5 amps) with peak capacity of 3,600 watts, incorporating a 2.88kW solar array, 800Ah lithium iron phosphate battery bank with 20,480Wh capacity, and an integrated propane-fueled backup generator with automatic switching capability. The contractor bears full responsibility for delivery, installation, maintenance, repairs, and removal of the equipment, with mandatory 48-hour response time for equipment failures and joint operational testing required upon installation. Evaluation will be conducted using a Lowest Price Technically Acceptable (LPTA) methodology, assessing technical acceptability on a pass/fail basis for core system components and power specifications before proceeding to price evaluation. The original solicitation deadline was April 13, 2026, though an amended version posted April 1, 2026 adjusted the due date to April 10, 2026 at 1:00 PM and permitted monthly invoicing arrangements.
This procurement is designated as a 100% set-aside for Women-Owned Small Businesses (WOSB), classified under NAICS code 532490 (General Rental Centers) and PSC code W061 (Equipment Lease/Rental). The contract period runs from June 16, 2026 through June 15, 2027, with one optional year extension available. No incumbent contractor information has been identified in the solicitation documents, and specific award value ranges are not disclosed in the materials provided. The equipment must be of recent vintage, not exceeding five years old, and mounted on a skid or wheels for portability at the remote, off-grid location. Performance of all work, including equipment delivery and installation, will occur at Bicycle Lake Army Airfield, Building 6212, Fort Irwin, California, with the contractor assuming responsibility for all environmental, storage, and logistical considerations inherent to the Mojave Desert environment.
Notice text
3 versions
Update #3 · Latest ·
***1 April 2026, ammended to allow for monthly invoicing***
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.
1. Can offerors supply a gas or diesel generator as a back up to the solar portion, instead of the propane generator?
While other generator types may be technically feasible, propane is the preferred solution for this application. It is highly reliable for remote sites due to its indefinite fuel shelf life and minimal maintenance requirements. Propane's clean-burning nature and closed-system refueling process also eliminate the risks of fuel system degradation and environmental spills, which are concerns with gasoline and diesel.
2. How often does the current propane generator have to turn on and run as a back up?
According to the system's performance report for 2023, the backup generator recorded zero hours of runtime. The solar array and battery bank were sufficient to handle 100% of the load, even during periods of overcast weather. Generator use is exceedingly rare and would only be anticipated during prolonged periods (e.g., 3+ days) of extreme weather with no sun.
3. What is the running wattage of the load?
Our field observations show a consistent baseline load of approximately 120 Watts (1A at 120V). This does not include ancillary equipment like the heater or fan, which cycle on periodically.
4. What is the peak wattage of the load?
The peak wattage occurs when the unit's internal heater or lens-clearing fan activates.
Update #2 ·
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.
1. Can offerors supply a gas or diesel generator as a back up to the solar portion, instead of the propane generator?
While other generator types may be technically feasible, propane is the preferred solution for this application. It is highly reliable for remote sites due to its indefinite fuel shelf life and minimal maintenance requirements. Propane's clean-burning nature and closed-system refueling process also eliminate the risks of fuel system degradation and environmental spills, which are concerns with gasoline and diesel.
2. How often does the current propane generator have to turn on and run as a back up?
According to the system's performance report for 2023, the backup generator recorded zero hours of runtime. The solar array and battery bank were sufficient to handle 100% of the load, even during periods of overcast weather. Generator use is exceedingly rare and would only be anticipated during prolonged periods (e.g., 3+ days) of extreme weather with no sun.
3. What is the running wattage of the load?
Our field observations show a consistent baseline load of approximately 120 Watts (1A at 120V). This does not include ancillary equipment like the heater or fan, which cycle on periodically.
4. What is the peak wattage of the load?
The peak wattage occurs when the unit's internal heater or lens-clearing fan activates.
Update #1 ·
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.
Attachments
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - W9124B26QA0040001 Professional Appearance.pdf | ||
| Expanded answers to industry.pdf | ||
| Solicitation - W9124B26QA004 Professional Appearance.pdf |