About this opportunity
The Department of the Air Force's Air Mobility Command is seeking a contractor to provide labor, materials, and equipment for airfield striping and rubber removal services at Dover Air Force Base in Delaware. The contractor will be required to repaint up to 290,000 square feet of pavement markings, both reflective and non-reflective, and remove up to 12,000 square feet of built-up and flaking markings. Additionally, the contractor must remove 85% of the rubber buildup from a designated 2,500 linear foot by 65 linear foot area on the runways. The total period of performance for the project is 365 days, and the work must be coordinated with base security, civil engineering, and airfield operations to maintain an active airfield during the project.
This procurement does not have any set-aside designations, and there is no information provided about potential incumbent contractors or award values. The key numerical details include the maximum square footage of striping and rubber removal required, as well as the timeline for the project.
Notice text
1. OBJECTIVE:
The Contractor shall provide all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications in accordance with the statement of work.
1.1 PERIOD OF PERFORMANCE:
Total period of performance (POP) for this project is 365 days from the date of the Notice to Proceed (NTP). The POP shall be agreed upon prior to contract award.
1.2 LIMITATIONS:
All work shall be coordinated with Security Forces, Civil Engineering Program Management and Airfield Operations and it should be assumed the airfield will remain active during the striping process, Contact with Ground Control will be necessary.
1.3 LOCATION:
The primary location of this project is base-wide on Dover Air Force Base located in Kent County the city of Dover Delaware.
1.4 DESCRIPTION OF WORK:
a. Repaint existing and paint new pavement markings in accordance with the statement of work and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.
b. Rubber removal is required as part of this contract. The work specified by this section consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property. The determination of the 85% removal shall be accomplished by the test.
Files
| File | Type | Posted |
|---|---|---|
| SOW Airfield Striping-Rubber 2025.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity