About this opportunity

This solicitation from the Army Corps of Engineers seeks maintenance dredging of approximately 1.5 million cubic yards from navigation channels serving the Port of Baltimore between April and August 2023. Dredging depths range from 35 to 50 feet below mean lower low water with an additional foot of allowable overdepth. Bids were due April 4, 2023 and will be evaluated for completion of the work within 120 calendar days from notice to proceed while coordinating with vessel traffic. Dredging will utilize equipment such as clamshell dredges, unloaders, scows, tugs, and pipelines to place material from approach channels at an ecosystem restoration site and harbor channels at a containment facility.

No set-aside designation was used for this opportunity. The primary NAICS code is 237990 and PSC code is D203 for maintenance dredging services valued between $25-100 million to be performed in Baltimore, Maryland. Five contractors submitted bids ranging from approximately $24-30.8 million. Material will be dredged from navigation channels totaling 1.5 million cubic yards to maintain depths for vessel traffic serving the Port of Baltimore.

Notice text

3 versions

Update #3 · Latest ·

***** ABSTRACT OF BIDS *****

**** AMENDMENT 0001 21 MAR 23 **** FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDThe project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between April 2023 through August 2023.The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,100,000 cy will be dredged from the Maryland approach channels (Tolchester Channel, Brewerton Channel Eastern Extension, and Craighill Angle) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 350,000 cy will be dredged from Harbor channels (Brewerton Angle) and placed at the Cox Creek Dredged Material Containment Facility.The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways ? active shipping channels supporting the Port of Baltimore. All work activities performed within the Federal navigation channels will need to be coordinated with the ongoing shipping traffic. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow. The period of performance is 120 calendar days from receipt of Notice-to-Proceed.

Update #2 ·

**** AMENDMENT 0001 21 MAR 23 **** FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDThe project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between April 2023 through August 2023.The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,100,000 cy will be dredged from the Maryland approach channels (Tolchester Channel, Brewerton Channel Eastern Extension, and Craighill Angle) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 350,000 cy will be dredged from Harbor channels (Brewerton Angle) and placed at the Cox Creek Dredged Material Containment Facility.The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways ? active shipping channels supporting the Port of Baltimore. All work activities performed within the Federal navigation channels will need to be coordinated with the ongoing shipping traffic. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow. The period of performance is 120 calendar days from receipt of Notice-to-Proceed.

Update #1 ·

FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDThe project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between April 2023 through August 2023.The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,100,000 cy will be dredged from the Maryland approach channels (Tolchester Channel, Brewerton Channel Eastern Extension, and Craighill Angle) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 350,000 cy will be dredged from Harbor channels (Brewerton Angle) and placed at the Cox Creek Dredged Material Containment Facility.The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways ? active shipping channels supporting the Port of Baltimore. All work activities performed within the Federal navigation channels will need to be coordinated with the ongoing shipping traffic. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow. The period of performance is 120 calendar days from receipt of Notice-to-Proceed.

Files

Notice history

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors