FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912DR23B0009
- Agency
-
ENDIST Baltimore
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Baltimore, Maryland 21201, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the FY23 Baltimore Harbor and Channels Maintenance Dredging project in Maryland. The U.S. Army Corps of Engineers, Baltimore District seeks to dredge approximately 1,500,000 cubic yards of material from navigation channels serving the Port of Baltimore. The dredging depth ranges from 35 to 50 feet MLLW with an allowable overdepth of 1 foot. Approximately 1,100,000 cubic yards will be placed at Poplar Island and 350,000 cubic yards will be placed at Cox Creek. Proposals are due by March 23, 2023.
There is no set-aside designated for this procurement. The work must be completed between April and August 2023 utilizing equipment such as clamshell dredges, unloaders, tugs, scows, drag bars, and pipelines. The material will be dredged and placed within 120 calendar days of the notice to proceed. The estimated value of this contract is between $25,000,000 and $100,000,000.
Notice text
THIS PROCUREMENT IS "UNRESTRICTED"
FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between April 2023 through August 2023.
The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,100,000 cy will be dredged from the Maryland approach channels (Tolchester Channel, Brewerton Channel Eastern Extension, and Craighill Angle) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 350,000 cy will be dredged from Harbor channels (Brewerton Angle) and placed at the Cox Creek Dredged Material Containment Facility.
The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY23 Baltimore Harbor & Channels Maintenance Dredging, Chesapeake Bay, MD. | Award Notice | |
| FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Solicitation | |
| This notice | Pre-Solicitation | |
| PLA Survey- FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Special Notice | |
| FY23 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity