FY21 Houston Ship Channel Exxon to Carpenters - Dredging
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912HY21B0011
- Agency
-
ENDIST Galveston
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Tx Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for pipeline deep draft dredging of the Houston Ship Channel between Alexander Island and Carpenters Bayou by the U.S. Army Corps of Engineers Engineering District Galveston. Approximately 1.5 million cubic yards of material will be dredged at a rate of 15,000 cubic yards per day and placed in the Peggy Lake Placement Area. The base work completion time is estimated at 180 days, while options have a 90-day estimate. The solicitation will be a firm-fixed price contract between $5-10 million issued in May 2021 with responses due in June 2021. Offerors must register with SAM and visit the Army's website for plans and specifications.
There is no set-aside designation for this opportunity. The primary NAICS code is 237990 and PSC code is D301. Subcontracting goals include 40% for small businesses with further targets for small disadvantaged, woman-owned, HUBZone, and veteran-owned small businesses. Key details include the total dredge quantity of 1.5 million cubic yards to be removed within 180 days for the base requirements.
Notice text
Project is for Pipeline Deep Draft Dredging of the Houston Ship Channel generally between Alexander Island and Carpenters Bayou to include the Jacintoport channel. Options for dredging CARE and J-Port docs. Material will go into Peggy Lake Placement Area. The total is 1.5M cubic yards and the production rate is 15,000 cubic yards per day.
Contractor should be familiar with the dredge material placement areas an the soft material found within them. Contractor should be familiar with the traffic conditions on the Houston Ship Channel.
Files
| File | Type | Posted |
|---|---|---|
| 21B0011_Synopsis_Final_Pre-Advertising_25 Jan21.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY21 Houston Ship Channel Exxon to Carpenters - Dredging | Award Notice | |
| FY21 Houston Ship Channel Exxon to Carpenters - Dredging | Solicitation | |
| This notice | Pre-Solicitation | |
| FY21 Houston Ship Channel Exxon to Carpenters - Dredging | Pre-Solicitation |