FY19 Snohomish River Channel Maintenance Dredging, Everett, Washington

Award Notice Posted

Solicitation number
W912DW19B0005
Agency
Awarded
to Portable Hydraulic Dredging LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912DW19C0021 Federal contract award
PSC
Not on record
Place of performance
Snohomish River - Everett Harbor Everett, Washington 98201, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Awarded Vendors: Portable Hydraulic Dredging LLC. Contract Award Dollar Amount: $1,591,000.00. Contract Award Date: 2019-09-11.

Update #3 ·

The due date and time for receipt of bids is not changed. Bid opening is scheduled for 27 August 2019 at 11:00 AM Pacific Standard Time.

The purpose of this amendment is to accomplish the following:


1. Replace section 35 20 23 of the associated specifications in its entirety.



2. Update the small business size standard for NAICS code 237990 to $30,000,000 in average annual receipts. Change is made in accordance with the Small Business Administration (SBA) updated North American Industry Classical System (NAICS) code Small Business Size Standards, effective 19 August 2019.


NOTE: Bidder must acknowledge receipt of all amendments with their bid. Instructions are set forth in item 11 of the amendment.

.

Update #2 ·

The purpose of this amendment is to update the attached plans to reflect the minimum pay depth is -20 Mean Lower Low Water (MLLW). The maximum pay depth is -22 MLLW.

NOTE: Bidder must acknowledge receipt of all amendments with their bid. Instructions are set forth in Item 11 of the amendment. The date for receipt of bids has not changed and bid opening will occur on 27 August 2019 at 1100 am Pacific Standard Time.

.

Update #1 ·

Construction Project:

U.S. Army Corps of Engineers (USACE), Seattle District requires hydraulic maintenance dredging of the Upper Settling Basin and the Federal channel adjacent to the Lower Settling Basins in the Snohomish River Federal navigation channel. The volume of sediment to be dredged from the Upper Settling Basin is approximately 100,000 cubic yards with placement at the City of Everett property Site O, near the dredge area. For the channel segment adjacent to the Lower Settling Basin, the Contractor shall hydraulically dredge approximately 40,000 cubic yards of sediment with placement at the western shore of Jetty Island. In-water work begins 16 October 2019 and all in-water work must be completed by 14 February 2020.


The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The resulting contract will be firm-fixed-price. The NAICS code for this procurement is 237990, Other Heavy and Civil Engineering Construction - Dredging and Surface Cleanup Activities, and the associated small business size standard is $27,500,000 in average annual receipts. This solicitation is UNRESTRICTED.


IMPORTANT NOTICE:


All contractors proposing on Department of Defense (DoD) solicitations must be registered in the System for Award Management (SAM) database prior to award of a contract. The purpose of this database is to provide basic business information and capabilities to the Government. The SAM website can be accessed at www.sam.gov.


Contractors are encouraged to register as soon as possible. All new contracts can be made ONLY to contractors who are registered in SAM. This requirement applies to all DoD contract awards.

.

Files

Notice history

Notice Type Posted
This notice Award Award Notice
FY19- Snohomish River Dredging / Everett Harbor Latest pre-solicitation Pre-Solicitation