FTC Consolidated Housing Furniture Storage Facility

Cancelled Solicitation Posted

Solicitation number
W912QR25R0011
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Fort Campbell, Kentucky, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Louisville District is seeking a design-build contractor to construct an 18,250 to 19,000 square foot Consolidated Housing Furniture Storage Facility at Fort Campbell, Kentucky. The project requires comprehensive design and construction services for a warehouse capable of storing furniture for over 5,000 single soldier barracks rooms, with capabilities for multi-tiered pallet rack storage and specialized furniture handling. Key contract requirements include implementing sustainable design features, energy monitoring systems, utility connections, loading docks, vehicle parking, and accessibility accommodations for individuals with disabilities. The proposal evaluation will focus on three primary factors: Past Performance, Technical Approach, and Small Business Participation Plan, with a minimum small business participation goal of 15% of the total contract value. Proposals are due by January 2, 2025, at 12:00 PM ET, with a site visit scheduled for November 20, 2024, at 9:00 AM ET.

The solicitation is not set aside for any specific business category, making it open to a broad range of contractors. The project includes four bid options: movable and rack storage furnishings, roadway improvements, pavement material alternatives, and wall panel construction variations. While specific award value ranges are not explicitly stated, the project involves substantial construction and design work with infrastructure development. The facility will support utility connections through privatized systems, with JACOBS managing utilities and City Light & Power providing electrical service. The anticipated contract completion is targeted for October 28, 2024, with the facility designed to support 10,000 bed spaces and serve as a centralized furniture storage and distribution center for Fort Campbell's military housing infrastructure.

Notice text

7 versions

Update #7 · Latest ·

***Amendment 0005 is hereby incorporated. Proposal due date remains 02 January 2025.

***Amendment 0004 is hereby incorporated. Proposal due date remains 02 January 2025. 

***Amendment 0003 is hereby incorporated. Proposal due date has changed to 02 January 2025.

***Amendment 0002 is hereby incorporated. Proposal due date remains 03 December 2024. 

***Amendment 0001 is hereby incorporated. Proposal due date remains 03 December 2024. 

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #6 ·

***Amendment 0004 is hereby incorporated. Proposal due date remains 02 January 2025. 

***Amendment 0003 is hereby incorporated. Proposal due date has changed to 02 January 2025.

***Amendment 0002 is hereby incorporated. Proposal due date remains 03 December 2024. 

***Amendment 0001 is hereby incorporated. Proposal due date remains 03 December 2024. 

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #5 ·

***Amendment 0003 is hereby incorporated. Proposal due date has changed to 02 January 2025.

***Amendment 0002 is hereby incorporated. Proposal due date remains 03 December 2024. 

***Amendment 0001 is hereby incorporated. Proposal due date remains 03 December 2024. 

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #4 ·

***Amendment 0002 is hereby incorporated. Proposal due date remains 03 December 2024. 

***Amendment 0001 is hereby incorporated. Proposal due date remains 03 December 2024. 

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #3 ·

***Amendment 0001 is hereby incorporated. Proposal due date remains 03 December 2024. 

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #2 ·

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Update #1 ·

The proposed project is to Construct a Standard design General Purpose Storage Building for use as Housing Furniture Storage warehouse. This Design-Build warehouse structure will be 18,250 SF. Warehouse floor shall be designed to support multiple tiered pallet racks, and other stackable rack systems needed to increase stack height of odd-shaped furniture and mattresses. Facility includes vehicle parking, building information systems, fire detection and protection systems, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include underground utilities (water, sewer, gas), electric service, loading docks, ramps, Forklift charging areas, Appliance Maintenance support area, roll-up doors, personnel access doors, parking and access roads, paving, sidewalks, curbs and gutters, sanitary sewer system, storm drainage, information systems, landscaping, and site improvements. Comprehensive Interior Design and furnishings related design services are required. Accessibility for individuals with disability will be provided. Utility connections are required to a privatized [electric distribution, electric generation, natural gas, water, wastewater, central [heating and/or cooling]] system(s). The Army intends to have the [respective] Utilities Privatization System Owner make and own the necessary connections up to the facility service disconnect or other defined point of demarcation.

Files

File Type Posted
W912QR25R0011_Specs-0005.pdf PDF
W912QR25R0011_Specs-0004.pdf PDF
W912QR25R0011_Specs-0003.pdf PDF
W912QR25R0011-0002.pdf PDF
W912QR25R0011-0001.pdf PDF
W912QR25R0011_Specs-0000.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX Bldg. 56767 Equipment Concentration Site (ECS) #6428th St. and Park Ave.North Fort Hood, TX Gatesville, Texas 76528, United States · NAICS 236220 ENDIST Louisville Total Small Business
Unaccompanied Enlisted Personnel Housing (UEPH) Barracks# 103 Fort Hood, Texas, United States · NAICS 236220 ENDIST Fort Worth No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors