FTC Air Traffic Control Tower
Closed Pre-Solicitation Posted
- Solicitation number
- W912QR26RATCT
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Campbell, Kentucky, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Louisville District intends to issue a Request for Proposal for design and construction of an Air Traffic Control Tower at Fort Campbell, Kentucky, with solicitation anticipated in July 2026. This is a full and open competition under a single-phase Design-Build-to-Budget (or Design-Bid-Build) procurement with no set-asides, evaluated using Best Value Trade Off methodology and awarded as a single Firm-Fixed-Price contract.
The primary facility spans multiple floors and includes equipment maintenance spaces, administrative offices and support areas, passenger elevator, server room, storage, bathrooms with showers, locker rooms, training and conference rooms, ready room, control tower cab, Army Radar Approach Control functional space, and mechanical and electrical rooms. The facility incorporates Fire Life Safety systems, Building Control Systems, Electronic Security Systems, and Energy Monitoring and Control Systems connection. Supporting facilities include paving, walks, parking, lighting, site improvements, and comprehensive interior design and furnishings. Heating and air conditioning will be provided by a self-contained system.
Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures beyond Department of Defense Minimum Antiterrorism for Buildings standards per UFC 4-010-01; these enhanced measures are included in the building cost. Accessibility accommodations will be provided up to the tenth floor. The facility will be designed for a minimum 40-year lifespan per DoD Unified Facilities Criteria UFC 1-200-02, including energy considerations.
The anticipated construction magnitude is $25 million to $100 million. Work occurs at Fort Campbell, Kentucky. All solicitation documents will be posted exclusively to SAM.gov; offerors must maintain active System for Award Management registration to be eligible for award. Contact: Thomas Nauert, Contract Specialist, Thomas.s.nauert@usace.army.mil.
Notice text
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board – RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY. Construct a standard Design Flight Control Tower. The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors’
closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms. Project includes special foundations, backup power generation and an uninterruptable power supply. Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included. Energy Monitoring and Control Systems (EMCS) connection will be provided if applicable. Access for individuals with disabilities will be provided up to the tenth floor. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided and costs are included in the building unit cost. Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures over the minimum required by UFC 4-010-01 be included. The cost for the additional measures is included in the Building Antiterrorism Measures line item. Supporting facilities include paving, walks, parking, lighting, and site improvements. Comprehensive interior design and furnishings are required. Heating and air conditioning will be provided by a self-contained system. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy.
Files
| File | Type | Posted |
|---|---|---|
| Pre-solicitation Synopsis FCKY ATCT.pdf | ||
| Pre-solicitation Synopsis FCKY ATCT.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity