Fort Pierce Beach Renourishment St. Lucie County, Florida

Closed Solicitation Posted

Solicitation number
W912EP25B0011
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Jacksonville District is seeking a contractor for the Fort Pierce Beach Renourishment project in St. Lucie County, Florida. The solicitation (W912EP25B0011) involves constructing a beach berm along approximately 5,400 feet of shoreline south of Fort Pierce Inlet, using beach-compatible sand dredged from Capron Shoal. Key contract requirements include environmental species monitoring, sea turtle trawling, turbidity monitoring, beach tilling, and quality control activities. The pre-bid conference is scheduled for December 31, 2024, via Webex, with ProjNet questions due by January 8, 2025, and bid responses required by January 21, 2025 at 2:00 PM EST. Evaluation criteria will likely include technical capability, past performance, and pricing, with the contractor required to self-perform 40% of the work and provide a bid guarantee of 20% of the bid price or $3 million, whichever is less.

The solicitation is an unrestricted contract with no specific set-aside designations, categorized under NAICS code 237990 for Heavy and Civil Engineering Construction. Two bidders, Great Lakes Dredge & Dock Co, LLC and Weeks Marine, Inc., submitted proposals with bids of $26,958,800 and $26,112,250 respectively, compared to the Independent Government Estimate of $9,810,000. The project requires the contractor to commence work within 60 calendar days of the Notice to Proceed, with specific area completion deadlines: Area B must be completed by May 15, 2025, Area A by May 30, 2025, and the entire project must be finished by June 30, 2025. The work will be performed in St. Lucie County, Florida, with offloading of beach fill occurring inside the South Jetty of Fort Pierce Inlet and a staging area located at the end of Seaway Drive. The project involves approximately 350,000 cubic yards of beach fill and includes 14 contract line items covering various aspects of the beach renourishment effort.

Notice text

2 versions

Update #2 · Latest ·

Project Description Project work includes construction of a beach berm along approximately 5,400 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-39. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring.The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the Notice to Proceed (NTP) and be off the beach no later than 15 May 2025 for Area B and 30 May 2025 for Area A, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 June 2025. For clarification: - Area A is the area between the south jetty (pump off location) Florida Department of Environmental Protection (FDEP) Range monument R-34 to R-37 where our contractor will need to be off the beach by 30 May 2025. - Area B is south of R-37 where all beach fill activities will need be out of that area by 15 May 2025.A Pre-Bid Conference will be held virtually on Tuesday, December 31, 2024 at 10:00 AM, EST. Please utilize the link and call information provided below: Webex Link: https://usace1.webex.com/meet/nicole.m.batista-cruzAudio Teleconference: 1-844-800-2712Access code: 199 262 9798

Update #1 ·

Project Description Project work includes construction of a beach berm along approximately 5,400 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-39. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring.The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the Notice to Proceed (NTP) and be off the beach no later than 15 May 2025 for Area B and 30 May 2025 for Area A, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 June 2025. For clarification: - Area A is the area between the south jetty (pump off location) Florida Department of Environmental Protection (FDEP) Range monument R-34 to R-37 where our contractor will need to be off the beach by 30 May 2025. - Area B is south of R-37 where all beach fill activities will need be out of that area by 15 May 2025.A Pre-Bid Conference will be held virtually on Tuesday, December 31, 2024 at 10:00 AM, EST. Please utilize the link and call information provided below: Webex Link: https://usace1.webex.com/meet/nicole.m.batista-cruzAudio Teleconference: 1-844-800-2712Access code: 199 262 9798

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Fort pierce beach renourishment 2025, ST. Lucie county, florida Pre-Solicitation
Fort pierce beach renourishment 2025, ST. Lucie county, florida Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
St. Lucie South Jetty Repair Industry Day Stuart, Florida, United States · NAICS 237990 ENDIST Jacksonville No set-aside
Pass-a-grille-pass, maintenance dredging, pinellas county, florida NAICS 237990 ENDIST Jacksonville Total Small Business
Tybee Island Shoreline Protection Project Tybee Island, Chatham County, Georgia. Tybee Island, Georgia 31328, United States · NAICS 237990 ENDIST Savannah No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors