Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W5168W25RA005
Agency
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
238160 Roofing Contractors
Place of performance
Usag Ft BELVOIR9925 Tracy Loop, Bldg 767FORT Belvoir, VA 22060UNITED States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army is seeking qualified contractors to provide roofing construction services at Fort Belvoir, Virginia, including roof removal, installation, repair, sealing, and replacement work on multiple buildings. All labor, equipment, and materials must be furnished by the contractor in accordance with the Statement of Work specifications, with the objective of delivering complete, functional, and suitable roofing systems. The solicitation was officially posted in September 2025 with a proposal submission deadline of September 25, 2025, and the Government conducted question and answer periods throughout August and September 2025 to address industry inquiries. As of February 26, 2026, the Source Selection Evaluation Board is currently evaluating submitted proposals, indicating that the evaluation phase is actively underway. The contract structure is an Indefinite Delivery/Indefinite Quantity (IDIQ) arrangement, which allows the Government flexibility in ordering roofing services as needed over the contract period.

This opportunity is designated as a Competitive 8(a) set-aside, restricting competition to small disadvantaged businesses certified in the Small Business Administration's 8(a) Business Development Program. The procurement falls under NAICS code 238160 (Roofing Contractors) and PSC code Z2JZ (Repair or Alteration of Miscellaneous Buildings), establishing the technical classification for the work. The place of performance is located at Fort Belvoir, Virginia, specifically at Building 767, Tracey Loop, Fort Belvoir, VA 22060. No specific contract value or timeline details are provided in the solicitation notice, though the IDIQ structure suggests ongoing work requirements over an extended period. Interested contractors should continue monitoring SAM.gov for announcements regarding the Source Selection Evaluation Board's completion and final contract award decision.

Notice text

6 versions

Update #6 · Latest ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

__________________________________________________

Update as of 26 FEB 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates.

__________________________________________________

Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates.

___________________________________________________

Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates.

____________________________________________________

Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025.

____________________________________________________

Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.

_________________________________________________

Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

__________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming

____________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

_____________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

__________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

____________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #5 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

__________________________________________________

Update as of 22 JAN 2026: The Source Selection Evaluation Board is in progress. Please continue to monitor Sam.gov for further updates.

___________________________________________________

Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates.

____________________________________________________

Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025.

____________________________________________________

Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.

_________________________________________________

Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

__________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming

____________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

_____________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

__________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

____________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #4 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

____________________________________________________

Update as of 2 DEC 2025: The Government is reviewing proposals. Please continue to monitor Sam.gov for further updates.

____________________________________________________

Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025.

____________________________________________________

Update as of AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.

_________________________________________________

Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

__________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming

____________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

_____________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 26 NOV 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_____________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates. The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

__________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

____________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #3 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

Update #2 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

________________________________________________________________________

Update as of 15 SEP 2025: At this time, the solicitation for this requirement has been posted. The closing date for this solicitation is 25 SEP 2025.

________________________________________________________________________

Update as of  AUG 2025: At this time, the solicitation for this requirement has been posted. The Government continues to work through answering questions posed by industry. Please continue to monitor Sam.gov for updates.

Update #1 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealingand or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the Statement Of Work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

Notice history

Notice Type Posted
Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005 Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z2DA--657-27-103JB, FCA Replace Building 51 Roof, JB St. Louis Vamc St. Louis MO 63125 · NAICS 236220 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152) Wilmington, Delaware 19805, United States · NAICS 236220 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business
Building 434 Roof Repair Groton, Connecticut 06340, United States · NAICS 236220 Naval Facilities Engineering Command Competitive 8(a)
Renovation at Truman Hall Headquarters in Fort Belvoir, VA NAICS 236220 ENDIST Louisville No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors