Fixed CO2 Fire Suppression System Cylinder Hydro-Test / Recharge, Cylinder Valve Rebuild, and High-Pressure Hose Hydro-Test

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
11510PR240000412
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Key West, Florida 33040, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The Department of Homeland Security US Coast Guard is seeking a contractor to provide fixed CO2 fire suppression system services, including hydrostatic testing and recharging of CO2 bottles, rebuilding of cylinder valves, and hydrostatic testing of high-pressure hoses. The services must be provided by a Department of Transportation (DOT) approved hydrostatic test facility. The contractor will be required to hydro-test 9 x 50lb CO2 bottles attached to various fixed CO2 systems, one-third at a time, and then refill and reinstall the bottles with the ship's crew's assistance. Additionally, the attached hoses must be hydro-tested at 1,000 psi, with a pressure drop no greater than 150 psi per minute for 2 minutes.

Paragraph 2:

This solicitation is set aside for small businesses. The work must be performed between August 12-30 on the USCGC THETIS (WMEC 910) vessel located in Key West, FL. The solicitation does not specify any incumbent contractors or award value ranges. However, it does outline the specific quantity of CO2 bottles and timeline for completing the services.

Notice text

3 versions

Update #3 · Latest ·

Service must be provided by Department of Transportation (DOT) approved hydro-static test facility. Hydro-test 09 50lb CO2 bottles attached to the units various fixed CO2 systems. The bottles be taken 03 at a time to ensure that the installed systems remain operational. Post hydro-test, the bottles be refilled and returned to the unit with ships force assisting in the reinstallation. Additionally, request that the hoses attached to the bottles be hydrotested in addition to rebuilding the valve assembly on the bottles. Hoses must be renewed or tested at a pressure of 1,000 psi. At test pressure, the pressure must not drop at a rate greater than 150 psi per minute for a 2-minute period. Contractor must have a valid driver's license, registration, and proof of insurance in order to gain access to the military installation at time of service.

POP to begin 12AUG2024 thru 11SEP2024

RFQs should be sent to Elizabeth.f.haun@uscg.mil

Update #2 ·

Service must be provided by Department of Transportation (DOT) approved hydro-static test facility. Hydro-test 09 50lb CO2 bottles attached to the units various fixed CO2 systems. The bottles be taken 03 at a time to ensure that the installed systems remain operational. Post hydro-test, the bottles be refilled and returned to the unit with ships force assisting in the reinstallation. Additionally, request that the hoses attached to the bottles be hydrotested in addition to rebuilding the valve assembly on the bottles. Hoses must be renewed or tested at a pressure of 1,000 psi. At test pressure, the pressure must not drop at a rate greater than 150 psi per minute for a 2-minute period. Contractor must have a valid driver's license, registration, and proof of insurance in order to gain access to the military installation at time of service.

RFQs should be sent to Elizabeth.f.haun@uscg.mil

Update #1 ·

Service must be provided by Department of Transportation (DOT) approved hydro-static test facility. Hydro-test 09 50lb CO2 bottles attached to the units various fixed CO2 systems. The bottles be taken 03 at a time to ensure that the installed systems remain operational. Post hydro-test, the bottles be refilled and returned to the unit with ships force assisting in the reinstallation. Additionally, request that the hoses attached to the bottles be hydrotested in addition to rebuilding the valve assembly on the bottles. Hoses must be renewed or tested at a pressure of 1,000 psi. At test pressure, the pressure must not drop at a rate greater than 150 psi per minute for a 2-minute period. Contractor must have a valid driver's license, registration, and proof of insurance in order to gain access to the military installation at time of service.

Files

File Type Posted
STATEMENT OF WORK.pdf PDF
12a_Provisions and Clauses.pdf PDF

Notice history

Notice Type Posted
Fixed CO2 Fire Suppression System Cylinder Hydro-Test / Recharge, Cylinder Valve Rebuild, and High-Pressure Hose Hydro-Test Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors