This document is a Statement of Work (SOW) for the Fixed CO2 Fire Suppression System Cylinder Hydro-Test / Recharge, Cylinder Valve Rebuild, and High-Pressure Hose Hydro-Test on the USCGC THETIS (WMEC 910) vessel. The SOW requires a Department of Transportation (DOT) approved hydro-static test facility to hydro-test 9 50lb CO2 bottles attached to the vessel's fixed CO2 systems, one-third at a time to maintain operational readiness. The bottles will be refilled and reinstalled with the ship's crew's assistance. Additionally, the hoses attached to the bottles must be hydro-tested and the valve assemblies rebuilt. The work must be performed between August 12-30. The contracting agency is the Department of Homeland Security US Coast Guard. The contracting officer's representative is ENS Robert Stankovich, and the requisitioner/approver is SK1 Elizabeth Haun.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12a_Provisions and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CGC THETIS (WMEC 910)
Fixed CO2 Fire Suppression System Cylinder Hydro-Test / Recharge, Cylinder Valve Rebuild, and High-Pressure Hose Hydro-Test
FSMS Requisi�on # 11510PR240000412
Descrip�on of Service:
Service must be provided by Department of Transporta�on (DOT) approved hydro-sta�c test facility. Hydro-test 09 50lb CO2 botles atached to the units various fixed CO2 systems. The botles be taken 03 at a �me to ensure that the installed systems remain opera�onal. Post hydro-test, the botles be refilled and returned to the unit with ships force assis�ng in the reinstalla�on. Addi�onally, request that the hoses atached to the botles be hydrotested in addi�on to rebuilding the valve assembly on the botles. Hoses must be renewed or tested at a pressure of 1,000 psi. At test pressure, the pressure must not drop at a rate greater than 150 psi per minute for a 2-minute period.
Period of Performance:
Actual date of service will be arranged by cuters DCA. Preferred POP AUG12-AUG30.
Cuter Homeport Loca�on:
USCGC THETIS (WMEC 910)
100 Trumbo Point Road Key West, FL 33040-6650
Cuter Contact Informa�on
DCA: ENS Robert Stankovich Email: Robert.J.Stankovich@uscg.mil Phone: (571) 420-5745
Requisi�oner/ IPP Approver Contact Info
SK1 Elizabeth Haun Email: Elizabeth.f.haun@uscg.mil Phone: (206) 815-2411 mailto:Robert.J.Stankovich@uscg.mil mailto:Elizabeth.f.haun@uscg.mil