Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912HN21B5005
- Agency
- ENDIST Savannah US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Brunswick, Georgia 31520, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks maintenance dredging services for the Fiscal Year 2021 Brunswick Inner Harbor project. The U.S. Army Corps of Engineers Savannah District requires the removal of up to 500,000 cubic yards of sediment from the East River, South Brunswick River, and Lower Turtle River channels in Brunswick, Georgia. Bids will be evaluated using sealed bidding procedures in accordance with FAR Part 14. The deadline for submission of proposals is August 18, 2021. The scope of work must be completed within 90 calendar days of the notice to proceed.
This requirement has been set aside only for small businesses and will result in a fixed price contract. The place of performance is Brunswick, GA and the estimated value is between $1,000,000 to $5,000,000. Dredged materials will be disposed at the Andrews Island Confined Upland Disposal Area. The primary NAICS code is 237990 and PSC code is D203 for maintenance dredging services. Environmental restrictions prohibit dredging and disposal activities between mid-April through mid-August.
Notice text
3 versions
Update #3 · Latest ·
****The bid abstract and virtual bid opening attendee list have been uploaded.****
AMENDMENT 0001 includes changes to the drawings, File No. CWK0615: Sheets VH101 and CN301 with Revision 1 dated 09 August 2021 are hereby added to and made a part of the Contract Drawings. Updated drawings are uploaded in the attachments.
The required response date/time has changed from 11 August 2021 01:00 PM EST to 18 August 2021 01:00 PM EST.
Use the most recent conformed solicitation for your bid.
***The solicitation and final plans and specifications have been posted.***
_____________________________________________________________________
This solicitation is for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging. This acquisition is being offered as an 100% Small Business set-aside solicitation and will result in a Fixed Price Contract Award. The magnitude of this requirement per FAR 36.204 is between $1,000,000 and $5,000,000.
Project Location: Brunswick Harbor is a deep draft navigation project located 70 statute miles south of the Savannah Harbor (GA) and 25 statute miles north of Fernandina Harbor (FL) in Glynn County, Georgia. The Inner Harbor channel of Brunswick Harbor is 36 feet deep MLLW and 400 feet wide through St. Simon Sound, Brunswick River and East River.
Project Description: The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be two months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.
Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored for shoaling. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that requires dredging at this time. Approximately 295,000 cubic yards of material is removed from the East River annually,approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the
Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:
East River, 0+000 to 2+500 project depth is 36’ with 1’ of advanced maintenance
East River, 2+500 to 4+500 project depth is 36’ with 5’ of advanced maintenance
East River, 4+500 to 6+250 project depth is 36’ with 1’ of advanced maintenance
East River, 6+250 to 12+000 project depth is 36’ with no advanced maintenance
South Brunswick River, 0+000 to 7+000 project depth is 36’ with no advanced maintenance
Environmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August.
The estimated construction duration for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging is 90 calendar days after issuance of the Notice to Proceed.
Evaluation Criteria: The contract will be solicited and procureusing Sealed Bidding Procedures under FAR Part 14.
Update #2 ·
AMENDMENT 0001 includes changes to the drawings, File No. CWK0615: Sheets VH101 and CN301 with Revision 1 dated 09 August 2021 are hereby added to and made a part of the Contract Drawings. Updated drawings are uploaded in the attachments.
The required response date/time has changed from 11 August 2021 01:00 PM EST to 18 August 2021 01:00 PM EST.
Use the most recent conformed solicitation for your bid.
***The solicitation and final plans and specifications have been posted.***
_____________________________________________________________________
This solicitation is for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging. This acquisition is being offered as an 100% Small Business set-aside solicitation and will result in a Fixed Price Contract Award. The magnitude of this requirement per FAR 36.204 is between $1,000,000 and $5,000,000.
Project Location: Brunswick Harbor is a deep draft navigation project located 70 statute miles south of the Savannah Harbor (GA) and 25 statute miles north of Fernandina Harbor (FL) in Glynn County, Georgia. The Inner Harbor channel of Brunswick Harbor is 36 feet deep MLLW and 400 feet wide through St. Simon Sound, Brunswick River and East River.
Project Description: The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be two months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.
Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored for shoaling. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that requires dredging at this time. Approximately 295,000 cubic yards of material is removed from the East River annually,approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the
Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:
East River, 0+000 to 2+500 project depth is 36’ with 1’ of advanced maintenance
East River, 2+500 to 4+500 project depth is 36’ with 5’ of advanced maintenance
East River, 4+500 to 6+250 project depth is 36’ with 1’ of advanced maintenance
East River, 6+250 to 12+000 project depth is 36’ with no advanced maintenance
South Brunswick River, 0+000 to 7+000 project depth is 36’ with no advanced maintenance
Environmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August.
The estimated construction duration for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging is 90 calendar days after issuance of the Notice to Proceed.
Evaluation Criteria: The contract will be solicited and procureusing Sealed Bidding Procedures under FAR Part 14.
Update #1 ·
***The solicitation and final plans and specifications have been posted.***
_____________________________________________________________________
This solicitation is for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging. This acquisition is being offered as an 100% Small Business set-aside solicitation and will result in a Fixed Price Contract Award. The magnitude of this requirement per FAR 36.204 is between $1,000,000 and $5,000,000.
Project Location: Brunswick Harbor is a deep draft navigation project located 70 statute miles south of the Savannah Harbor (GA) and 25 statute miles north of Fernandina Harbor (FL) in Glynn County, Georgia. The Inner Harbor channel of Brunswick Harbor is 36 feet deep MLLW and 400 feet wide through St. Simon Sound, Brunswick River and East River.
Project Description: The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be two months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.
Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored for shoaling. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that requires dredging at this time. Approximately 295,000 cubic yards of material is removed from the East River annually,approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the
Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:
East River, 0+000 to 2+500 project depth is 36’ with 1’ of advanced maintenance
East River, 2+500 to 4+500 project depth is 36’ with 5’ of advanced maintenance
East River, 4+500 to 6+250 project depth is 36’ with 1’ of advanced maintenance
East River, 6+250 to 12+000 project depth is 36’ with no advanced maintenance
South Brunswick River, 0+000 to 7+000 project depth is 36’ with no advanced maintenance
Environmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August.
The estimated construction duration for the Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging is 90 calendar days after issuance of the Notice to Proceed.
Evaluation Criteria: The contract will be solicited and procureusing Sealed Bidding Procedures under FAR Part 14.
Attachments
| File | Type | Posted |
|---|---|---|
| W912HB21B5005-Webex Bid Opening Attendee List.pdf | ||
| W912HB21B5005-Abstract (Optional Form 1419).pdf | ||
| B.08 AMD0001 Solicitation W912HN21B5005.pdf | ||
| W912HN-21-B-5005_DRAWINGS.pdf | ||
| B.08 AMD0001 Conformed Solicitation W912HN21B5005.pdf | ||
| B.08 W912HN21B5005 Specifications.pdf | ||
| B.08 W912HN21B5005 - Solicitation.pdf | ||
| B.08 W912HN21B5005 Drawings.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging | Award Notice | |
| Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging | Solicitation | |
| Fiscal Year 21 Brunswick Inner Harbor Maintenance Dredging | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity