Fire Suppression System Inspection and Testing, and Categorizing

Awarded Award Notice Posted

Solicitation number
FA5606-16-R-0002
Agency
Air Forces Europe and Africa Air Force, Department of Defense
Awarded
to GFA Gesellschaft FÜR Anlagenbau MBH
Set-aside
No set-aside

Opportunity facts

Contract number
FA560616D0005 Federal IDV award
NAICS code
561621 Security Systems Services (except Locksmiths)
PSC
Not on record
Place of performance
Spangdahlem Air Base Germany plus some outlying buildings in the local area. 54529 Spangdahlem Germany Spangdahlem, Non-U.S. 54529 Germany

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Dec 23, 2015 5:19 am Modified: Dec 30, 2015 9:57 amTrack Changes

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION.


The contractor shall provide all management, tools, supplies, equipment, transportation, and labor necessary to ensure that Annual Inspection and Testing, and Categorizing of the Fire Suppression Systems at Spangdahlem Air Base is performed and the fire suppression system is operational.  Contractor must categorize the fire suppression systems and identify under which regulation, VdS or NFPA, is installed in each individual facility.  Workload of systems and buildings to be categorized initially is shown paragraph 4.2.  Additional buildings can be added with task orders up to the maximum amount of 100 buildings.  Additionally, the contractor must provide a new inspection book (Prüfbuch) for all systems which do not have the original inspection book anymore.  Contractor must be a VdS Accredited Installer Company for Fire Suppression Systems (VdS anerkannte Errichterfirma für Feuerlöschanlagen) and shall comply with all applicable federal, regional, state, and local laws commercial standards and manufacturer guidelines.


 1.1. SERVICE REQUIREMENTS. 


1.1.1. Scheduled Services.  The Contractor shall provide annual inspection and testing, and categorizing on the fire suppression systems that are listed in the individual task orders.  All services mentioned in this PWS will be coordinated through a Government Contracting Officer Representative (COR).  The name and the telephone number of the COR will be given to the contractor at the time of contract award. 


The work shall be accomplished in accordance with (IAW) NFPA standards 11 through 17 and 72, German DIN EN 12845, German DIN EN ISO 9001:2000, VdS CEA 4001 standards and applicable manufacturer's instructions. 


If the system is connected to the installation fire department, the contractor and the COR shall notify the fire department that the system test is to be conducted at least 72 hours before the desired testing.  Personnel at the end-user's facility have to be notified by the COR prior to conducting a test. 


Installed fire suppression systems located in areas that are inaccessible for safety considerations shall be tested at times coordinated with the COR. 


If systems fail the inspection because of minor damages, the contractor shall immediately notify the Contracting Officer.  Upon gaining permission from Contracting Officer, contractor shall conduct minor repairs to make the system fit to pass inspection.  The contractor is not authorized to make any repairs that exceed 100 Euro.  Any repairs exceeding 100 Euro must be brought to the attention of the Contracting Officer (CO) for additional coordination/guidance.

 1.1.2. Inspection Book.  The contractor will provide a new VdS Inspection Book (VdS Betriebsbuch für Feuerlöschanlagen) to all systems which do not have the original inspection book, to all systems that require a new book because there is no more space to write down recent year's inspection results in the Basic Period and to all inspection books that only have space to write down the Basic Period results.  Inspection books only last for 2 (two) years then they are filled up and need to be replaced.  Therefore, contractor will also provide new inspection books for all systems in the 2nd Option Period and in the 4th Option Period. 


1.1.3. Categorization.  The contractor is required to categorize the fire suppression systems between VdS- or NFPA regulation to determine which regulation applies for inspection and maintenance of each system within each individual facility.  The contractor shall perform categorization within the first three (3) months of the contract start date.  Within three (3) months of contract start a detailed report shall be prepared and given to the COR.  This report must determine which regulation has to be used to complete the inspection and maintenance in each individual facility. 


1.1.3.1. Reports and Records.


 


The contractor shall provide a detailed service report after services have been performed as described in Paragraph 1.1.1. listing all deficiencies and all work that needs to be performed after annual inspection and testing was provided.  Each service report shall be submitted to the COR in English within 4 (four) weeks after the inspection is completed.


 


The contractor has to provide a complete list with all fire suppression systems stating if the system is categorized as VdS or NFPA installed IAW Paragraph 1.1.3.  Each service report shall be submitted to the COR in English within two (2) weeks after the three (3) months of categorization are over.


 1.2. Disposal.  The contractor shall clean up the work area upon completion of each work process; no litter, removed parts, and any other trash produced by the contractor shall be left on the work site.  The trash shall be removed and disposed of by the contractor in accordance with the German laws and regulations.  The contractor shall be responsible for any permits or fees regarding the disposal. 


1.3. Quality Assurance.  The Government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan.  This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards.  It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).


 1.4. Contractor Employees.  Personnel shall meet or exceed the following requirements:


 1.4.1. The contractor shall not employ persons for work on this contract if such employee(s) are identified to the contractor by the Government as a potential threat to health, safety, security, general wellbeing, or operational mission of the installation and its population in accordance with (IAW) DoDR 5500.7, Standards of Conduct. 


1.4.2. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.  As a minimum the contractor shall be responsible to issue badges displaying company name and ensure they are worn by employees during execution of their duties.


1.5. Hours of Operations.  Inspection and testing, and categorizing shall be performed during business hours (0700-1600), Monday through Friday, with the exception of U.S. Government holidays, other Government installation down days, and German national holidays.


Exempted are emergency services. 


1.5.1. Performance of Services during Military Exercises or Operations.


Work stoppages may occur during the execution of this PWS due to military exercises or operations.  During these times, access to areas supporting the exercise or operation may be curtailed or not allowed.  During scheduled and unscheduled exercises or operations, the contractor must be prepared to move to other work locations or suspend operations at no additional costs to the Government.  Reschedule of work in such cases will be coordinated through the COR.


1.6. Special Qualifications


All services on the installed fire suppression systems and fire alarm systems included in this contract shall be performed by a certified company.  The contractor shall be VdS accredited Installer Company for Fire Suppression Systems (VdS anerkannte Errichterfirma für Feuerlöschanlagen). 


1.7. Manpower Reporting


1.7.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractfor the United States Air Force via a secure data collection site.  The contractor is required to completely fill in all required date fields at http://www.ecmra.mil.


 1.7.2. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 01 October through 30 September.  While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year.  Contractors may direct questions to the CMRA help desk. 


*Reporting Period:  Contractors are required to input data by 31 October of each year.


Uses and Safeguarding of Information:  Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars.  At no time will any data be released to the public with the contractor name and contract number associated with the data. 


User Manuals:  Data for Air Force service requirements must be input at the Air Force CMRA link.  However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.


1.8. PERFORMANCE OF SERVICES DURING CRISIS: 


In accordance with DFARS 237.76 and unless otherwise directed by an authorized Government representative, it is determined that services as identified in this PWS are NOT essential for performance during a crisis. 


2. Security Requirements:


The contractor will be escorted by the COR or an assigned person from 52 CES to his working sites on base.  The escort will stay with the contractor at all times.


3. Service Summary 




Performance Objective



Paragraph PWS



Performance Threshold



Annual Inspection and Testing shall be performed one time annually for each system



1.1.1



Not to exceed 2 deficiencies per task order



Detailed service report shall be submitted to COR after services have been performed listing all deficiencies and all work that needs to be performed after annual inspection and testing was provided per inspected fire suppression system within 4 weeks after inspection is completed



1.1.3.1



Not to exceed 2 deficiencies per task order



Detailed report for categorization as VdS or NFPA within first 3 months of task order start date


 



1.1.3.1



Not to exceed 1 deficiency per task order



Trash removal and disposal after each completed inspection and testing



1.2



Not to exceed 2 deficiencies per task order




4.1 References 


VDS CEA 4001, German DIN EN 12845, German DIN EN ISO 9001:2000, NFPA Standards 11 through 17 and 72 (NFPA standards are available at the Spangdahlem AB Fire Department) 


4.2 Initial Categorization Workload 


 




 



Bldg.



Wet System



Dry System



AFFF



1



Bit 10



Yes



No



No



2



Bit 11



Yes



No



No



3



Bit 13



Yes



No



No



4



Bit 15



Yes



No



No



5



Bit 16



Yes



No



No



6



Bit 47



Yes



No



No



7



Bit 70



Yes



No



No



8



Bit 84



Yes



No



No



9



Oberweis



Yes



No



No



10



Zemmer



Yes



No



No



11



Sülm



Yes



No



No



12



15



Yes



No



No



13



19



Yes



No



No



14



51



Yes



No



No



15



61



Yes



No



No



16



73



Yes



No



No



17



77



Yes



No



No



18



99



Yes



Yes



Yes



19



103



Yes



No



No



20



103



Yes



No



No



21



110



Yes



No



No



22



120



Yes



No



No



23



127



Yes



No



No



24



129



Yes



No



No



25



136



Yes



No



No



26



155



Yes



No



No



27



157



 



 



 



28



168



Yes



No



No



29



208



Yes



No



Yes



30



211



Yes



No



No



31



212



Yes



No



No



32



215



Yes



No



No



33



216



Yes



No



No



34



218



Yes



No



No



35



219



Yes



No



No



36



221



Yes



No



Yes



37



222



Yes



No



No



38



227



Yes



Yes



No



39



250



Yes



Yes



No



40



257



Yes



No



Yes



41



257



Yes



No



No



42



260



Yes



No



Yes



43



263



Yes



No



Yes



44



300



Yes



No



No



45



311



Yes



No



Yes



46



332



Yes



Yes



No



47



333



Yes



Yes



No



48



335



Yes



Yes



No



49



340



Yes



No



No



50



345



Yes



No



No



51



360



Yes



No



No



52



364



Yes



Yes



Yes



53



371



Yes



No



No



54



386



Yes



No



No



55



427



Yes



No



No



56



440



Yes



No



No



57



443



 



 



 



58



457



Yes



No



No



59



500



Yes



No



No



60



515



Yes



Yes



No



61



520



Yes



No



No



62



560



Yes



No



No



63



570



Yes



Yes



No



64



580



 



 



 



65



600



Yes



Yes



Yes



66



630



Yes



No



No



67



640



No



Yes



No



68



645



Yes



No



No



69



660



Yes



No



No



70



670



Yes



No



No



71



690



Yes



No



No



72



771



No



Yes



No



73



839



Yes



No



No



74



840



Yes



No



No



75



919



Yes



No



No



76



920



Yes



No



Yes



77



2024



No



Yes



No



78



2026



No



Yes



No




 

Update #1 ·

Added: Dec 23, 2015 5:19 am

NOTE:
This is ONLY a PRE-SOLICITATION Notice.
Quotes are NOT requested at this point.
This is not the final version of the Performance Work Statement (PWS). 
The final PWS will be posted with the solicitation.
The response date will be adjusted as well.


1. DESCRIPTION OF SERVICES/GENERAL INFORMATION.


The contractor shall provide all management, tools, supplies, equipment, transportation, and labor necessary to ensure that Annual Inspection and Testing, and Categorizing of the Fire Suppression Systems at Spangdahlem Air Base is performed and the fire suppression system is operational.  Contractor must categorize the fire suppression systems and identify under which regulation, VdS or NFPA, is installed in each individual facility.  Workload of systems and buildings to be categorized initially is shown paragraph 4.2.  Additional buildings can be added with task orders up to the maximum amount of 100 buildings.  Additionally, the contractor must provide a new inspection book (Prüfbuch) for all systems which do not have the original inspection book anymore.  Contractor must be a VdS Accredited Installer Company for Fire Suppression Systems (VdS anerkannte Errichterfirma für Feuerlöschanlagen) and shall comply with all applicable federal, regional, state, and local laws commercial standards and manufacturer guidelines.


 1.1. SERVICE REQUIREMENTS. 


1.1.1. Scheduled Services.  The Contractor shall provide annual inspection and testing, and categorizing on the fire suppression systems that are listed in the individual task orders.  All services mentioned in this PWS will be coordinated through a Government Contracting Officer Representative (COR).  The name and the telephone number of the COR will be given to the contractor at the time of contract award. 


The work shall be accomplished in accordance with (IAW) NFPA standards 11 through 17 and 72, German DIN EN 12845, German DIN EN ISO 9001:2000, VdS CEA 4001 standards and applicable manufacturer's instructions. 


If the system is connected to the installation fire department, the contractor and the COR shall notify the fire department that the system test is to be conducted at least 72 hours before the desired testing.  Personnel at the end-user's facility have to be notified by the COR prior to conducting a test. 


Installed fire suppression systems located in areas that are inaccessible for safety considerations shall be tested at times coordinated with the COR. 


If systems fail the inspection because of minor damages, the contractor shall immediately notify the Contracting Officer.  Upon gaining permission from Contracting Officer, contractor shall conduct minor repairs to make the system fit to pass inspection.  The contractor is not authorized to make any repairs that exceed 100 Euro.  Any repairs exceeding 100 Euro must be brought to the attention of the Contracting Officer (CO) for additional coordination/guidance.

 1.1.2. Inspection Book.  The contractor will provide a new VdS Inspection Book (VdS Betriebsbuch für Feuerlöschanlagen) to all systems which do not have the original inspection book, to all systems that require a new book because there is no more space to write down recent year's inspection results in the Basic Period and to all inspection books that only have space to write down the Basic Period results.  Inspection books only last for 2 (two) years then they are filled up and need to be replaced.  Therefore, contractor will also provide new inspection books for all systems in the 2nd Option Period and in the 4th Option Period. 


1.1.3. Categorization.  The contractor is required to categorize the fire suppression systems between VdS- or NFPA regulation to determine which regulation applies for inspection and maintenance of each system within each individual facility.  The contractor shall perform categorization within the first three (3) months of the contract start date.  Within three (3) months of contract start a detailed report shall be prepared and given to the COR.  This report must determine which regulation has to be used to complete the inspection and maintenance in each individual facility. 


1.1.3.1. Reports and Records.


 


The contractor shall provide a detailed service report after services have been performed as described in Paragraph 1.1.1. listing all deficiencies and all work that needs to be performed after annual inspection and testing was provided.  Each service report shall be submitted to the COR in English within 4 (four) weeks after the inspection is completed.


 


The contractor has to provide a complete list with all fire suppression systems stating if the system is categorized as VdS or NFPA installed IAW Paragraph 1.1.3.  Each service report shall be submitted to the COR in English within two (2) weeks after the three (3) months of categorization are over.


 1.2. Disposal.  The contractor shall clean up the work area upon completion of each work process; no litter, removed parts, and any other trash produced by the contractor shall be left on the work site.  The trash shall be removed and disposed of by the contractor in accordance with the German laws and regulations.  The contractor shall be responsible for any permits or fees regarding the disposal. 


1.3. Quality Assurance.  The Government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan.  This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards.  It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).


 1.4. Contractor Employees.  Personnel shall meet or exceed the following requirements:


 1.4.1. The contractor shall not employ persons for work on this contract if such employee(s) are identified to the contractor by the Government as a potential threat to health, safety, security, general wellbeing, or operational mission of the installation and its population in accordance with (IAW) DoDR 5500.7, Standards of Conduct. 


1.4.2. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.  As a minimum the contractor shall be responsible to issue badges displaying company name and ensure they are worn by employees during execution of their duties.


1.5. Hours of Operations.  Inspection and testing, and categorizing shall be performed during business hours (0700-1600), Monday through Friday, with the exception of U.S. Government holidays, other Government installation down days, and German national holidays.


Exempted are emergency services. 


1.5.1. Performance of Services during Military Exercises or Operations.


Work stoppages may occur during the execution of this PWS due to military exercises or operations.  During these times, access to areas supporting the exercise or operation may be curtailed or not allowed.  During scheduled and unscheduled exercises or operations, the contractor must be prepared to move to other work locations or suspend operations at no additional costs to the Government.  Reschedule of work in such cases will be coordinated through the COR.


1.6. Special Qualifications


All services on the installed fire suppression systems and fire alarm systems included in this contract shall be performed by a certified company.  The contractor shall be VdS accredited Installer Company for Fire Suppression Systems (VdS anerkannte Errichterfirma für Feuerlöschanlagen). 


1.7. Manpower Reporting


1.7.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractfor the United States Air Force via a secure data collection site.  The contractor is required to completely fill in all required date fields at http://www.ecmra.mil.


 1.7.2. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 01 October through 30 September.  While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year.  Contractors may direct questions to the CMRA help desk. 


*Reporting Period:  Contractors are required to input data by 31 October of each year.


Uses and Safeguarding of Information:  Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars.  At no time will any data be released to the public with the contractor name and contract number associated with the data. 


User Manuals:  Data for Air Force service requirements must be input at the Air Force CMRA link.  However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.


1.8. PERFORMANCE OF SERVICES DURING CRISIS: 


In accordance with DFARS 237.76 and unless otherwise directed by an authorized Government representative, it is determined that services as identified in this PWS are NOT essential for performance during a crisis. 


2. Security Requirements:


The contractor will be escorted by the COR or an assigned person from 52 CES to his working sites on base.  The escort will stay with the contractor at all times.


3. Service Summary 




Performance Objective



Paragraph PWS



Performance Threshold



Annual Inspection and Testing shall be performed one time annually for each system



1.1.1



Not to exceed 2 deficiencies per task order



Detailed service report shall be submitted to COR after services have been performed listing all deficiencies and all work that needs to be performed after annual inspection and testing was provided per inspected fire suppression system within 4 weeks after inspection is completed



1.1.3.1



Not to exceed 2 deficiencies per task order



Detailed report for categorization as VdS or NFPA within first 3 months of task order start date


 



1.1.3.1



Not to exceed 1 deficiency per task order



Trash removal and disposal after each completed inspection and testing



1.2



Not to exceed 2 deficiencies per task order




4.1 References 


VDS CEA 4001, German DIN EN 12845, German DIN EN ISO 9001:2000, NFPA Standards 11 through 17 and 72 (NFPA standards are available at the Spangdahlem AB Fire Department) 


4.2 Initial Categorization Workload 


 




 



Bldg.



Wet System



Dry System



AFFF



1



Bit 10



Yes



No



No



2



Bit 11



Yes



No



No



3



Bit 13



Yes



No



No



4



Bit 15



Yes



No



No



5



Bit 16



Yes



No



No



6



Bit 47



Yes



No



No



7



Bit 70



Yes



No



No



8



Bit 84



Yes



No



No



9



Oberweis



Yes



No



No



10



Zemmer



Yes



No



No



11



Sülm



Yes



No



No



12



15



Yes



No



No



13



19



Yes



No



No



14



51



Yes



No



No



15



61



Yes



No



No



16



73



Yes



No



No



17



77



Yes



No



No



18



99



Yes



Yes



Yes



19



103



Yes



No



No



20



103



Yes



No



No



21



110



Yes



No



No



22



120



Yes



No



No



23



127



Yes



No



No



24



129



Yes



No



No



25



136



Yes



No



No



26



155



Yes



No



No



27



157



 



 



 



28



168



Yes



No



No



29



208



Yes



No



Yes



30



211



Yes



No



No



31



212



Yes



No



No



32



215



Yes



No



No



33



216



Yes



No



No



34



218



Yes



No



No



35



219



Yes



No



No



36



221



Yes



No



Yes



37



222



Yes



No



No



38



227



Yes



Yes



No



39



250



Yes



Yes



No



40



257



Yes



No



Yes



41



257



Yes



No



No



42



260



Yes



No



Yes



43



263



Yes



No



Yes



44



300



Yes



No



No



45



311



Yes



No



Yes



46



332



Yes



Yes



No



47



333



Yes



Yes



No



48



335



Yes



Yes



No



49



340



Yes



No



No



50



345



Yes



No



No



51



360



Yes



No



No



52



364



Yes



Yes



Yes



53



371



Yes



No



No



54



386



Yes



No



No



55



427



Yes



No



No



56



440



Yes



No



No



57



443



 



 



 



58



457



Yes



No



No



59



500



Yes



No



No



60



515



Yes



Yes



No



61



520



Yes



No



No



62



560



Yes



No



No



63



570



Yes



Yes



No



64



580



 



 



 



65



600



Yes



Yes



Yes



66



630



Yes



No



No



67



640



No



Yes



No



68



645



Yes



No



No



69



660



Yes



No



No



70



670



Yes



No



No



71



690



Yes



No



No



72



771



No



Yes



No



73



839



Yes



No



No



74



840



Yes



No



No



75



919



Yes



No



No



76



920



Yes



No



Yes



77



2024



No



Yes



No



78



2026



No



Yes



No




 

Attachments

Files attached to this notice, newest first
File Type Posted
FA5606-16-R-0002-0002.doc DOC document
Site_Visit_Fr22Jan16_-_Minutes_-_KS-Signed.pdf PDF
FA5606-16-R-0002-P0001_Amend_1.pdf.doc DOC document
FA5606-16-R-0002_Fire_Suppression_-_Amend_1.pdf PDF
FA5606-16-R-0002.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Runway deicing fluid Latest Award Notice
Fire Suppression System Inspection and Testing, and Categorizing This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity