Fire alarm
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140P5320Q0037
- Agency
- Southeast Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- 4210 Fire Fighting Equipment
- Place of performance
- Cape Hatteras National Seashore
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Site visit will be conducted on August 14 at 7:00 am EDT. Contact Frank Hester for details at frank_hester@nps.gov 252-475-9027
This notice cancels site visit previously scheduled for August 12, 2020.
No further changes, response date remains August 20,2020, 1700 E.D.T.
Update #4 ·
A site visit will be conducted on August 12 at 7:00 am EDT. Contact Frank Hester for details at frank_hester@nps.gov 252-475-9027
No further changes, response date is August 20,2020, 1700 E.D.T.
Update #3 ·
A site visit will be conducted on August 3rd at 7:00 am EDT. Contact Frank Hester for details at frank_hester@nps.gov 252-475-9027
This amendment adds attachment: NPS Back Flow Devises NOT Fire System attachment has data on type, size, and location of back flow preventers.
No further changes, response date is August 5,2020, 1700 E.D.T.
Update #2 ·
This amendment adds one attachment that includes SF18, SOW, and full list of clauses.
No further changes, response date is August 5,2020, 1700 E.D.T.
Update #1 ·
Combined Synopsis/Solicitation for Commercial Items
FAR 12.603
General Information
Document Type: Combined Solicitation/Synopsis
Solicitation Number:
Posted Date: 7/15/2020
Original Response Date: 8/14/2020
Current Response Date: 8/14/2020
Product or Service Code: 4210
Set Aside: Total Small Business
NAICS Code: 238220
Contracting Office Address
Interior Region 2 South Atlantic Gulf
DESCRIPTION
A. Project: Fire/Intrusion Alarm, Water Based Fire Sprinkler Protection Systems Inspection Contract
B. Provide annual NFPA inspection, and testing of 12 dry systems, 4 wet systems, 3 pre action, 1
deluge, 17 back flow preventers, and 1 RPZ which are monitored for fire protection. Inspect and
test six RPZ for buildings domestic water supply at five locations Provide annual NFPA inspection
and testing for 6 buildings with no sprinkler protection system installed but has fire/intrusions
alarm panels that are monitored. The locations are park wide with locations in Manteo NC, Nags
Head NC, Kill Devil Hills NC, Buxton NC, Hatteras NC, and Ocracoke NC.
1.01 LOCATION
A. Indicate locations. See attached sheet with building name and locations. For information,
and directions call Frank Hester (252) 216 7828.
1.02 REFERENCES
A. Fire Protection: National Fire Protection Association (NFPA), Current (most recent) edition
1. NFPA 25 ¿ Water based fire protection systems
2. NFPA 72 - National Fire Alarm Code
Scope of Work: Automatic Sprinkler System
1.0 GENERAL
A. Perform complete code compliant Inspection and Testing on the automatic sprinkler
system(s) in the18 buildings. The ITM on the sprinkler system shall be performed based on
current National Fire Protection Association (NFPA) 25 and manufacturer requirements.
Provide all tools, supplies, equipment, to perform the testing and inspections.
B. National Park Service Southeast Regional Structural Fire Manager is the AHJ for the fire
protection at this Park.
C. Liability: The contractor will be responsible for repairing any damage to the building or
contents in the building if the government determines that the damage is a result of poor ITM
procedures during the performance of this contract.
D. All automatic sprinkler system tests and inspections performed under this contract shall
comply with the NFPA 25 including all appendix chapters.
E. The Contractor shall leave areas where they perform work neat, clean, and orderly. Spills,
dust, debris, material, packaging, etc., caused as a result of the contractor shall be cleaned
up or removed by the contractor to the satisfaction of the COR.
F. If the inspector encounters equipment that is in a condition that may endanger life or
property, the inspector shall immediately notify the CO, COR, and Authority Having
Jurisdiction, of the condition requiring immediate action. Within 24 hours the inspector shall
provide a written report to the CO, COR, and Authority Having Jurisdiction of the hazardous
condition and recommended corrective action.
G. Certifications and Qualifications
1. The Contractor shall always have available a enough capable and qualified employees
to enable the contractor to properly, adequately, and safely perform all work required
under the terms of this contract.
2. Automatic Sprinkler System technicians performing contract work shall hold at least a
NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering
Technology Inspection and Testing of Water Based Systems. Additionally, the Technician
must have experience in the past five years in fire sprinkler system testing, repair,
maintenance, installation, and related activities of buildings and equipment comparable to
the buildings and equipment covered by this contract.
3. Contractor and subcontractor personnel engaged in the activities specified by this
contract shall be required to possess certificates of training, licenses, and permits as
required by the state, county, parish, city, and other local jurisdictions when the alarm
system is installed in a facility covered by such state, county, parish, city, and other local
jurisdictions.
4. The Contractor shall provide to the CO, COR, and Authority Having Jurisdiction
documentation of the certificates of training, licenses, and permits for all new employees
not later than seven (7) days prior to that person beginning work under the terms of this
contract. The Contractor shall insure that all certificates of training, licenses, permits, and
bonds are current and valid. All offers must include documentation and proof of the above
certifications and qualifications for each employee.
2.0 SCOPE
A. The system(s) shall be inspected and tested per current NFPA 25.
B. All visits will be made under the direction of the Park Structural Fire Coordinator, or a park
designated employee. Scheduling arrangements must be provided at least 1 week in
advance. The inspection period normal takes 5 working days to complete.
C. No deviations from this SOW shall be made without written authorization from the AHJ. All
recommendations are encouraged to be discussed with the Park representatives.
D. Before proceeding with any testing, the Contractor shall coordinate the notification of all
persons and facilities that receive alarm, supervisory or trouble signals (e.g. COR, facility
manager, central station, Fire Department). The Contractor will coordinate with the COTR to
ensure that all building occupants are notified. At the conclusion of testing, the Contractor
shall notify those previously notified that the testing has been concluded.
E. The Contractor is responsible for the fire alarm operation and restoration during the
performance of the tests specified in this SOW.
F. The Contractor shall ensure that the sprinkler system is always maintained operable except
while being tested. It is essential that the contractor carefully schedule with the Building
Manager all non-emergency shutdowns of the sprinkler system and that back up fire
protection be provided by the contractor any time that the sprinkler system is out of service.
In addition, regardless of the duration of the shutdown, the affected portion of the system
shall be tested to ensure that the protection has been restored.
G. The contractor shall coordinate with the building manager to decide when testing and
inspections can be performed. Testing and inspections can be performed during normal
business hours when it does not interfere with building operations. When testing and
inspections will interfere with building operations; it shall be performed after normal business
hours.
3.0 PERFORMANCE
A. The service of the fire sprinkler systems will include the points listed below and shall follow
NFPA 25 Table 5.1 Summary of Sprinkler System Inspection and Testing.
B. As a minimum, Work conducted at annual inspection shall include, but not restricted to:
(1) Visual inspection of the general occupancy conditions, environment, and
operations related to fire protection.
(2) Check for any changes in occupancy status that may affect the performance or
reliability of the fire suppression systems.
(3) Inspect general storage and stock arrangements in relation to fire sprinkler
system effectiveness.
(4) Inspect all sprinkler valves for proper position, general condition, accessibility
and protection. Test control valves as required to insure satisfactory operation.
(5) Inspect control valves. Seal and tag all control valves and clean and lubricate
control valve components as required.
(6) Inspect priming levels and air pressure on all dry pipe valves. Check and adjust
as necessary.
(7) Drain and blow out all dry system low points equipped with valve arrangements.
(8) Inspect all accelerators and accessories to determine if they are in satisfactory
condition.
(9) Inspect sprinkler control valve identification signs and security arrangements.
(10) Check condition of drain valves, check valve, gauges and related components.
(11) Instruct the Park representative on the proper operation, care and maintenance
of the fire
protection equipment and system as required.
(12) Inspect and test 17 back flow preventers and 1 RPZ,
(13) Document pass or fail results for each back flow/RPZ
(14) Inspect and test six RPZ for building domestic water supply at five locations.
(15) Document pass or fail results for each RPZ for each of the six domestic water supply
lines.
(16) Compile a complete report of the inspection and explain any deficiencies and
recommend corrective action to be taken according to recognized care and
maintenance standards for each of the six domestic water supply lines.
C. As a minimum, work conducted at alarm flow test conducted annual inspections:
(1) Inspect and test operation of alarm valves, flow indicators, retard chambers, and
accessories for proper operation.
(2) Inspect and test all alarm system components for satisfactory condition. Clean
and lubricate necessary.
D. Work conducted at trip and water flow test conducted once a year as part of the
inspection.
E. Operations and maintenance manuals, as-built installation drawings, and other system
documentation shall be provided by the park to assist in the proper care of the system and
its components.
(1) Inspect and determine if all portions of the fire sprinkler systems are in service
and in satisfactory condition.
(2) Inspect all changes or modifications to fire suppression systems ensuring the
modifications meet current code requirements.
(3) Check the general condition of sprinkler heads. Visually check the heads for any
obstructions or coatings that may hinder satisfactory activation and that there is
adequate clearance around the heads to allow proper water distribution.
(4) Check the general condition of the sprinkler system piping, hangers and related
equipment.
(5) Inspect fire department connection couplings, caps, threads, clappers, check
valves and drain. Lubricate as required.
(6) Check the reserve supply of sprinkler heads for proper assortment.
(7) Ensure proper fire alarm signaling (supervisory and alarm conditions)
(8) Conduct a trip test of all dry valves as described below:
- Note location, device number, system and area controlled.
- Check for normal air and water pressure prior to test.
- Flow tests each system prior to trip to remove obstructive materials
from supply piping.
- Fully trip and flood each system by utilizing proper test connections.
- Check trip point pressures and times to determine satisfactory results.
- Check and document the time to flood system and discharge water
from proper test outlets.
- Inspect the performance of each valve.
- Inspect the valve interior, moving parts, rubber facings, seats and other
related components.
- Clean and reset dry valve, replacing necessary gaskets as required.
- Check alarm activation at trip test point.
- Drain and dry all low points.
- Restore the system back in service.
- Check and determine satisfactory operation of accelerators.
- Clean, reset and return accelerators to service.
- Record the time necessary to re-pressurize the system with air and
report any RELATED DEFICIENCIES.
4.0 INSPECTION AND TESTS
A. After ITM has been performed on the 20 sprinkler systems and 18 buildings with fire/security
alarm panels, the Contractor shall provide for each location:
1. Written certification the equipment has been inspected and tested by a NICET II,
Inspection and Testing of Water Based Systems.
2. Written certification the equipment is in proper working order.
3. Completed Record of Inspection and Testing form(s) as outlined in NFPA 25
B. Compile a complete report of the inspection and explain any deficiencies and recommend
corrective action to be taken according to recognized care and maintenance standards.
Deficiencies shall be noted and accompanied with code citation from NFPA 25.
C. One set of hard-copy documents and one electronic copy, for each type of system, will be
required at contract completion.
D. Document report of site inspections using standard company forms for condition assessment.
The report will be used for immediate repairs and future system planning replacement.
Scope of Work: Fire Alarm system panels
6.0 GENERAL
A. The Statement of Work (SOW) requires the contractor to perform complete code compliant
Inspection and Testing on the automatic fire alarm system(s) and intrusion systems in the 24
buildings for 20 sprinkler systems with fire alarm panels and 6 buildings with fire/security
alarm panels and no sprinkler protection. The ITM on the fire alarm system shall be
performed based on current National Fire Protection Association (NFPA) 72 and
manufacturer requirements. The intrusion system shall follow the same testing requirements
as the fire alarm requirements.
B. In accordance with this SOW and the Task Order, the Contractor shall provide all required
site-specific information in the execution of the contract.
C. National Park Service Southeast Regional Structural Fire Manager is the AHJ for the fire
protection at this Park.
D. Liability: The contractor will be responsible for any damages to the building or content if the
damage is the result of poor maintenance, or inspection during the performance of this
contract.
E. The contractor shall provide all tools and supplies necessary to properly perform inspections
and tests in accordance with NFPA 72.
F. All Fire Alarm Systems tests and inspections performed under this contract shall comply with
the most current edition of the NFPA 72 National Fire Alarm Code including all appendix
chapters.
G. Housekeeping. The Contractor shall leave areas where he performs work neat, clean and
orderly.
H. Certifications and Qualifications:
1. The Contractor shall always have available a sufficient number of capable and
qualified employees to enable the contractor to properly, adequately, and safely perform
all work required under the terms of this contract.
2. Fire Alarm Systems technicians performing contract work shall meet NFPA 72¿s
qualifications and hold at least a NICET Level 2 (Associate Engineering Technician) in
Fire Protection Engineering Technology, Fire Alarm Systems. Additionally, the Technician
must have experience in the past five years in fire alarm system testing, repair,
maintenance, installation, and related activities of buildings and equipment comparable to
the buildings and equipment covered by this contract.
3. Technicians modifying the fire alarm control panel of systems shall be factory trained
and currently certified for the operating system, including software version, of the fire
alarm system, and shall provide documentation of this certification per NFPA 72.
4. Contractor and subcontractor personnel engaged in the activities specified by this
contract shall be also required to possess certificates of training, licenses, and permits as
required by the state, county, parish, city, and other local jurisdictions when the alarm
system is installed in a facility covered by such state, county, parish, city, and other local
jurisdictions.
5. The Contractor shall provide to the Ordering Official and Authority Having Jurisdiction
documentation of the certificates of training, licenses, and permits for all new employees
not later than seven (7) days prior to that person beginning work under the terms of this
contract.
6. The Contractor shall insure that all certificates of training, licenses, permits, and bonds
are current and valid. All offers must include documentation and proof of the above
certifications and qualifications for each employee.
7.0 SCOPE
A. Services includes the performance inspection and testing of a variety of intrusion, fire alarm
and notification systems, equipment and components such as manual alarm devices, smoke
and heat detectors, remote and graphic annunciators, main fire alarm panel and components,
voice alarm system, speakers and horns and other audible and visual devices, wiring circuits
and junctions, all other alarm, detection and control and ancillary devices, and emergency
power operations. The system(s) shall be inspected and tested per current NFPA 72 (current
edition).
B. The Contractor shall ensure that the fire alarm system is always maintained operable except
while being tested. It is essential that the contractor carefully schedule with the Building
Manager all non-emergency shutdowns of the fire alarm system and that back up protection
be provided by the contractor (arrangement of additional personnel stationed at the fire alarm
system control panel) any time that the fire alarm system is out of service. In addition,
regardless of the duration of the shutdown, the affected portion of the system shall be tested
to ensure that the protection has been restored.
C. All visits will be made under the direction of the Park Structural Fire Coordinator, or a park
designated employee. Scheduling arrangements must be provided at least 1 week in
advance.
D. No deviations from this SOW shall be made without written authorization from the AHJ. All
recommendations are encouraged to be discussed with the Park representatives.
E. Before proceeding with any testing, the Contractor shall coordinate the notification of all
persons and facilities that receive alarm, supervisory or trouble signals (e.g. COTR, facility
manager, central station, Fire Department). The Contractor will coordinate with the COTR to
ensure that all building occupants are notified. At the conclusion of testing, the Contractor
shall notify those previously notified that the testing has been concluded.
F. The contractor shall coordinate with the building manager to decide when testing and
inspections can be performed. Testing to be performed during normal business hours when it
does not interfere with building operations. When testing interferes with building operations; it
shall be performed after normal business hours.
G. The Contractor may be required to perform some work, inspections, and tests outside the
normal working hours of the building occupants. Any scheduled work that is disruptive to the
tenants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed
after the building occupant¿s normal working hours. The Contractor shall coordinate with the
COTR for coordination of after-hours access to the building.
H. If the inspector encounters equipment that is in a condition that may endanger life or
property, the inspector shall immediately notify the Ordering Official and Authority Having
Jurisdiction, of the condition requiring immediate action. Within 24 hours the inspector shall
provide a written report to the Ordering Official and Authority Having Jurisdiction of the
hazardous condition and recommended corrective action. The Contractor is responsible for
the fire alarm operation and restoration during the performance of the tests specified in this
SOW.
I. Fire Alarm inspection reports shall be submitted to the requesting Park on the ¿suggested
form¿, as found in NFPA 72
8.0 PERFORMANCE
A. The Contractor shall perform a full initial inspection and test of each device on the fire alarm
system in accordance with NFPA 72, National Fire Alarm Code.
1. Testing Frequencies from NFPA 72 shall be used.
2. Testing Methods from NFPA 72 shall be used.
9.0 INSPECTION AND TESTS
A. Inspection and Testing Records: Within 14 days after completing the inspection and testing,
the Contractor will furnish a written record to the COTR that includes the following:
3. Contractor¿s Inspection and Testing Form that includes all the information required by
NFPA 72.
4. Date of manufacture of fire alarm system(s) and whether parts are readily available.
5. The record shall include any problems noted with the system, including inoperable or
unsupervised devices or equipment, or devices that cannot be calibrated, tested, or
serviced in accordance with the manufacturer¿s recommendations.
6. A complete system inventory including the intrusion and fire alarm manufacture, number
of notification and initiation devices (fire and intrusion) including device type is required.
7. The record shall be provided electronically (by email) if required by the COTR (formatted
in Microsoft Word or Excel).
B. Compile a complete report of the inspection and explain any deficiencies and recommend
corrective action to be taken according to recognized care and maintenance standards.
NOTE- any discrepancies found during annual test shall be noted AND accompanied by
appropriate code section from NFPA 72 and/or manufacturer¿s requirements.
C. One set of hard-copy documents and one electronic copy, for each type of system, will be
required at contract completion.
D. Document report of site inspections using standard company forms for condition assessment.
The report will be used for immediate repairs and future system planning replacement.
13. Department of Labor Wage Determination- In the performance of this contract the
Contractor shall comply with the requirements of U.S. Department of Labor Wage
Determination Numbers WD # 2015-4408 DARE&Hyde County which is located online via
https://beta.sam.gov/
Award shall be made to the quoter whose quotation the best value to the government,
considering technical capability, past performance, and price. The government will evaluate
information based on the following evaluation criteria: meeting or exceeding the requirement,
past performance, technical capability, and price.
The full text of FAR provisions or clauses may be accessed electronically at
http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
1. FAR 52.212-1, ¿Instructions to Offerors¿Commercial Items¿
2. FAR 52.212-2, ¿Evaluation ¿ Commercial Items¿
3. FAR 52.212-3, ¿Offerors Representations and Certifications¿Commercial Items¿
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov
in accordance with FAR 52.212-3, ¿Offerors Representations and Certifications¿Commercial
Items.¿
The following contract clauses apply to this acquisition:
¿ FAR 52.212-4, ¿Contract Terms and Conditions¿Commercial Items¿
¿ FAR 52.212-5, ¿Contract Terms and Conditions Required to Implement Statutes or
Executive Orders¿
The following subparagraphs of FAR 52.212-5 are applicable:
52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-13, 52.225-13, 52.232-34.
Attachment includes a full list of clauses applicable to this solicitation.
All quoters shall submit the following: Price quote and specifications. Price shall be broken out
for the base and each option year (4) and a total for base and option years.
All quotations, shall be emailed to William_leady@nps.gov
This is an open-market combined synopsis/solicitation for products as defined herein. The
government intends to award a purchase order as a result of this combined synopsis/solicitation
that will include the terms and conditions set forth herein. To facilitate the award process, all
quotes must include a statement regarding the terms and conditions herein as follows:
"The terms and conditions in the solicitation are acceptable to be included in the
award document without modification, deletion, or addition."
OR
"The terms and conditions in the solicitation are acceptable to be included in the
award document with the exception, deletion, or addition of the following:"
Quoter shall list exception(s) and rationale for the exception(s).
Quoter shall provide lump sum pricing for base and each option year (4). In addition, provide a
total for base and option years.
Submission shall be received not later than August 14,2020 at 5:00 pm ET. All submissions
shall be emailed to William_leady@nps.gov. Late submissions shall be treated in accordance
with the solicitation provision at FAR 52.212-1(f).
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to
the William Leady via email at William_leady@nps.gov.
Point of Contact
William Leady via email at William_leady@nps.gov
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140P5320Q0037_Amd_0004.pdf | ||
| Sol_140P5320Q0037_Amd_0003.pdf | ||
| Alarm attachment_0002.pdf | ||
| Sol_140P5320Q0037_Amd_0002.pdf | ||
| SF 18 SOW CLAUSES_0001.pdf | ||
| Sol_140P5320Q0037_Amd_0001.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| FIRE ALARM Inspection services | Award Notice | |
| Fire alarm | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity