Fir Creek Aquatic Organism Passage and Bridge Construction

Award Notice Posted

Solicitation number
AG-0489-S-10-0213
Agency
Awarded
to Rognlins, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-0489-C-10-0199 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Olympic National Forest 1835 Black Lake Blvd. SW Suite A Directions to Site This project is located on the Hood Canal District, South Area of the Olympic National Forest, Section 33, Township 22 N, R 5 W. near Shelton, Wa. It may be reached by traveling Northwest of Shelton on Hwy 101, turning left on Skokomish Valley Rd. and traveling 5.5 miles on the Skokomish Valley Road, to Forest Road 23, turning right onto Forest Road 23 and traveling a couple miles to Forest Road 2350, turning left onto FR 2350 and traveling 0.05 miles. Olympia, Washington 98512, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Please see revised Solicitation. Schedule B, Bid Schedule has been corrected. Please use updated Bid Schedule in Solicitation Rev 1.



No other changes to this solicitation.

Update #4 ·

Added Drawings files. 3 Files in total were added -



Original Zip File of drawings did not load correctly

Update #3 ·

Solicitation is released on Feb 18, 2010. Bid due date March 22, 2010 1600 Local Time

Update #2 ·

Recovery -Fir Creek Aquatic Organism Passage and Bridge Construction. Olympic National Forest.



This project consists of the following major items of work: Construction of a new bridge and foundations, roadway excavation and embankment, paving, removal of existing steel culvert; channel re-alignment and re-grading, placement of designed in-channel stream simulation material, placement of woody debris, haul of excavated material, and seeding and mulching.



The Government Project Range is between $250,000 and $500,000.



Anticipated period of performance is July 15, 2010 through October 15, 2010.



This project is a full and open competition



This project is subject to the American Recovery and Reinvestment Act - Reporting Requirements.



The Solicitation is expected to be released on or about 2/9/2010.



The Government anticipates to award a Firm Fixed Price Contract as a result of this solicitation.



Update #1 ·

Recovery -Fir Creek Aquatic Organism Passage and Bridge Construction. Olympic National Forest.



This project consists of the following major items of work: Construction of a new bridge and foundations, roadway excavation and embankment, paving, removal of existing steel culvert; channel re-alignment and re-grading, placement of designed in-channel stream simulation material, placement of woody debris, haul of excavated material, and seeding and mulching.



The Government Project Range is between $250,000 and $500,000.



Anticipated period of performance is July 15, 2010 through October 15, 2010.



This project is set aside 100% for Small Business.



This project is subject to the American Recovery and Reinvestment Act - Reporting Requirements.



The Solicitation is expected to be released on or about 2/9/2010.



The Government anticipates to award a Firm Fixed Price Contract as a result of this solicitation.



Files

File Type Posted
Fire Plan.pdf PDF
Industrial Fire Precaution Levels.pdf PDF
MOU-Jan25_signed.pdf PDF
Revised Section J.docx DOCX document
Amendment 1.pdf PDF
Solicitation AG-0489-S-10-0213 Rev 1.docx DOCX document
FirFinalForestDrawings1to11.pdf PDF
FirBridgeTypicalsDrawings15to21.pdf PDF
FirCreekBridgeDrawings12to14Signed.pdf PDF
fp-03usc-all.zip ZIP file
Solicitation AG-0489-S-10-0213.docx DOCX document
General Decision Number WA0800001 020510.docx DOCX document
Updated Specs.zip ZIP file
Show all 13

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors