Solicitation AG-0489-S-10-0213.docx

DOCX document 309 KB Posted

Attached to
Fir Creek Aquatic Organism Passage and Bridge Construction
Solicitation number
AG-0489-S-10-0213
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Industrial Fire Precaution Levels.pdf PDF
Fire Plan.pdf PDF
Amendment 1.pdf PDF
MOU-Jan25_signed.pdf PDF
Revised Section J.docx DOCX document
Solicitation AG-0489-S-10-0213 Rev 1.docx DOCX document
FirCreekBridgeDrawings12to14Signed.pdf PDF
FirFinalForestDrawings1to11.pdf PDF
FirBridgeTypicalsDrawings15to21.pdf PDF
Updated Specs.zip ZIP file
fp-03usc-all.zip ZIP file
General Decision Number WA0800001 020510.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL NO: AG-0489-S-10-0213

UNIT: Olympic NF
PROJ NAME: Fir Creek Organism Passage and Bridge Construction
PAGE 78 of 145

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0489-S-10-0213

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|X| NEGOTIATED (RFP)

3. DATE ISSUED

2/18/2010

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

356950

6. PROJECT NO.

7. ISSUED BYCODE
0489
8. ADDRESS OFFER TO

US Forest Service

EROC-NW

16400 Champion Way Sandy, OR 97055

9. FOR INFORMATION
CALL:
A. NAME

Brad Reed B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 503-668-1695

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

TAS::12 1102::TAS Capital Improvement and Maintenance

This contract will be funded and awarded under the provisions of the American Recovery and Reinvestment Act of 2009 (ARRA)

Performance and Payment Bonds in original form (no copies) are required at 100% of the original contract amount.

Terms and conditions as stated in the Solicitation # AG-0489-S-10-0213 are in full force and effect. See Schedule of Items for bid items description, unit of issue and quantities.

The Government's estimate is: between $250,000 and $500,000.

11. The Contractor shall begin performance within 10 calendar days and complete it within 90 calendar days after receiving |_| award, X notice to proceed. This performance period is |X| mandatory, |_| negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

|X| YES|_| NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time March 22, 2010(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.An offer guaranteeX is,|_| is not required.
C.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA
FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )
26. ADMINISTERED BYCODE
27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer GeneratedSTANDARD FORM 1442 BACK (REV. 4-85)
SOL NO: AG-0489-S-10-0213
UNIT: Olympic NF
PROJ NAME: Fir Creek Organism Passage and Bridge Construction
PAGE 2 of 144
SOL NO: AG-0489-S-10-0213
UNIT: Olympic NF
PROJ NAME: Fir Creek Organism Passage and Bridge Construction
PAGE 61 of 145

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

SCHEDULE OF ITEMS

Solicitation No. AG-0489-S-10-0213

Project Name:

Fir Creek Organism Passage and Bridge Construction Location:

Olympic NF

Contractor:

Issuing and Billing Office:

USDA Forest Service

EROC-NW

16400 Champion Way Sandy, OR 97055

Item No.

Sub-item No.

Description

Unit Qty

Unit Price

Amount

55601
Standard steel W-Beam with curb bridge railing
Foot
125
61701
Guardrail system, steel bridge approach railing, type I, class A
Foot
150
61755
End piece, type C
Each
4
61756
Anchorage
Each
4
56401
Bearing device, elastomeric
Each
16

62528

Seeding and mulching, dry method
Lump Sum

63501

Temporary traffic control Lump Sum

64804A

Placed streambed simulation rock, select borrow, method A
Cubic Yard

64804B

Placed streambed simulation rock, bed class 16, method A

Cubic Yard

$________
$________

64804C Placed streambed simulation rock, channel rock size 1, method A

Each

64804D Placed Streambed simulation rock, channel rock size 2, method A

Each

Sub Total Line Item 1

*OPTIONAL BID ITEMS:

20415

Unsuitable excavation

Cubic Yard
29

64804E

Placed streambed simulation rock, bed class 16, method A

Cubic Yard

SUB-TOTAL Line Item 2

TOTAL PRICE

Contractor Name:

Address:

Signature of Authorized Representative: Date:

TIN: DUNS: email:

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. Final Contract Quantities and possible quantity adjustment or removal of *OPTIONAL BID ITEMS shall be determined on the ground by the CO or a designated representative after inspection of subsurface material immediately adjacent to and under the existing culvert.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 DESCRIPTION OF WORK

Fir Creek Aquatic Organism Passage. Project work consists of the following major items of work: Construction of a new bridge and foundations, roadway excavation and embankment, paving, removal of existing steel culvert; channel re-alignment and re-grading, placement of designed in-channel stream simulation material, placement of woody debris, haul of excavated material, and seeding and mulching. Unless noted otherwise all materials shall be provided by the contractor. All instream work shall be completed per the Memorandum of Understanding between the Forest Service and Washington State Fish and Wildlife attached to the contract.

C.2 PROJECT LOCATION

This project is located on the Hood Canal District, South Area of the Olympic National Forest, Section 33, Township 22 N, R 5 W. near Shelton, Wa. It may be reached by traveling Northwest of Shelton on Hwy 101, turning left on Skokomish Valley Rd. and traveling 5.5 miles on the Skokomish Valley Road, to Forest Road 23, turning right onto Forest Road 23 and traveling a couple miles to Forest Road 2350, turning left onto FR 2350 and traveling 0.05 miles.

a) Existing Conditions:

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

b) Weather Conditions:

Weather conditions suitable for ground excavation are normally expected in May through October. Rain, sometimes heavy, is normal throughout the winter, with periods of light to moderate snowfall. Night freezing is common throughout the winter and several periods of weeklong freezes are likely.

c) Operating Season: Inclusive dates during which operations are permissible.

Activity
Start Date
End Date
Restrictions
Construction Season *
7/15
10/15
Hand Tools
7/15
10/15
Power Tools / 2 Chainsaws
7/15
10/15
Machinery / Car Traffic
7/15
10/15
Heavy Machinery
7/15
10/15
Time of Day Restriction
7/15
09/15
Operations restricted to between 2 hours after sunrise and 2 hours before sunset.
In-Stream Work
7/15
9/15
(HPA/MOU)

* Road Closure at the site is limited from July 15, 2010- October 15, 2010

Notes – Noise Limitation:

· Power Tools/2 Chainsaws - any power tools with noise output cannot exceed output of two operating chainsaws.

· Machinery/Car Traffic - any machinery with noise output is limited to noise output from normal vehicular traffic at site (e.g. small excavator/backhoe).

· Helicopter/Heavy Machinery - any machinery with noise output that is greater than normal vehicular traffic at site.

d) Pre-bid Conference:

None scheduled. If a sufficient number of bidders request a conference, one may be scheduled and information posted along with the solicitation.

As mutually agreed between Small Business Administration and U.S.D.A.- Forest Service.

C.3 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.210-3) (APR 1984)

Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:

Specification
Address

Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects

FP-03

U.S. Customary Units Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 866-512-1800 http://bookstore.gpo.gov/ http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm

ASTM Standards
American Society for Testing and Materials

P.O. Box C700 100 Bar Harbor Drive West Conshohocken, PA 19428-2959

(610) 832-9585 http://www.astm.org

AASHTO Standards
American Association of State

Highway and Transportation Officials 444 North Capitol Street, NW Suite 249 Washington, D.C., 20001

(206) 624- 5800 http://www.aashto.org

C.4 APPLICABLE SPECIFICATIONS AND MATERIAL CERTIFICATIONS

(a) Applicable Specifications:

References to Standard Specifications in the contract refer to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units.

Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.

The Forest Service Supplemental Specifications to the FP-03 are also given on the Specification List. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.

(b) Product Substitution:

Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

Shop Drawings Submittals:

Submit the following shop drawings on this project (4 sets unless noted):

Title
Referenced by Specification No.
Time Allowed for Govt. Review After Submittal
Bridge Railing and Approach Railing Shop Drawings
104.03(b)(1)(d)
21 Days
Prestressed Member Details
104.03(b)(1)(e) &

21 Days

Prestressed Precast Members
104.03(b)(1)(e) & 553
21 Days
Reinforcing Steel Shop Drawings (Bar lists and bending diagrams)
554.03
21 Days
As-Built Plans *
104.03(c)
N/A

(c) Material Certification, Testing Reports and Submittals:

Brief Title
Basic Reference Specification
Detailed Regulations Specification
Copies To Submit
Time for Government Approval After Total Submittal
Traffic Control Management Plan
C.4
156

& MUTCD Part 6

1
7 Days

Written Notification of Road Closure

156.03

156.03

14 Days

Hazardous Spill Plan
107.10
1
7 Days

Fire Plan

J.4
1
7 Days
Quality Control Plan
153.02
1
7 Days
Project Work Schedule any any Revisions
FAR 52.236-15c
1
7 Days
Notification for Moving Construction Equipment onto Project
171.03
171.03
1
14 Days
Erosion Control Plan
157.03
157.03 & Plans
3
14 Days
Dewatering and Sediment Control Plan
157.03
HPA/MOU
3
14 Days
Stream Diversion Plan
203.04
203.04
3
21 Days

Structure Removal Plan (Culvert)

203.04

203.04

21 Days

Target Values for Gradation
FS Supplemental 322.03
Tables 703-2 & 703-3
2
7 Days
Riprap (commercial source)
251.07 &

106.03

705.02
2
7 Days
Asphalt Concrete Mixing Plant Certification
404.02
404.02
2
14 Days
Minor Hot Asphalt Concrete Mix Design
404.02
404.02
1
7 Days
Hot Asphalt Concrete Quality Control Certificates
404.09 & 106
404.09
2
N/A
Pile Driving Equipment
551
551.03(b)(1)
2
14 Days
Wave Equation Analysis
551
551.03(b)(2)
2
14 Days
Pile Production Certificate
551.15
715.06
1
14 Days

Manufacturer Data for Pile Shoe Attachment

715.08

715.08

14 Days

Concrete Mix Design, including admixtures
552.03
1
14 Days
Portland Cement Production Certification
552.19
701.01 (a)
2
N/A
Concrete Quality Control Certificates, including batch tickets and test results
552.09, FS Supp 552.09 & 106
552.09, FS Supp 552.09
1
N/A
PCI Plant Certification
FS Supp 553.03
FS Supp 553.03
2
21 Days
PCI Plant Quality Control Report
FS Supp 553.03
FS Supp 553.03
2
21 Days
Concrete Mix Design for Prestressed Members
553
553.11, 553.03, 552.03
2
21 Days
Prestressing Strand Certification
553
553.11, 709.03& FS Supp 553.03
2
21 Days
Prestressed Concrete Test Results
553
553.11, 553.03 & FS Supp 5 53.03
2
N/A
Reinforcing Steel Production Certification
554.10
709.01 & FS Supp 709.01
1
N/A

Structural Steel Certified Test Results

a. Steel Specified by AASHTO Designation

b. Steel Specified by ASTM Designation 555.20

555.05 & 717.01

555.05 & Plans

AASHTO M270 & Plans

ASTM A36 & Plans

21 Days

21 Days

Certified Bridge Welder
555.03, 551.09 & Plans
ANSI/AASHTO/AWS Bridge Welding Code D1.5
2
21 Days
Bridge Railing Production Certification
556.10
710.06
2
21 Days
Seed
625
713.03

713.04 713.05

3
7 Days
Straw (Weed-free)
625
713.05
3
7 Days
Erosion Control Blanket
629.07 & 106.03
713.17 & Table 713-3
1
21 Days
Portland Cement Production Certification
FP-03 552.19, FP-03 701.01 (a)
1
N/A
Portland Cement Production Certification
High Strength Non-Shrink Grout Data
725.22 (c) & FS Supp 725.22 (c)
State Qualified Products List
2
14 Days

(d) General Guidelines for Submittals:

Submittals are required by their corresponding specifications (basic reference & detailed requirement). Work requiring submittals shall not begin until submittals have been approved.

Submittals shall include the following:

· Date and Revision Dates.

· Project Name and Contract Number.

· Names of Contractor, Subcontractor, Supplier, and Manufacturers.

· Field Dimensions and Relation to Adjacent Structures.

· Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.

Samples:

Physical samples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.

Manufacturer's requirements:

Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.

Approval or Rejection Time Allowance:

Submittals will be reviewed and either approved or rejected by (SEE (d) ABOVE).

C.5 Attachments to Statement of Work/Specifications (AGAR 452.211-73)(FEB 1988)

The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.

Definition and Acronyms

Wherever in these provisions or in other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:

Reference to a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.

These Definitions and Abbreviations are in addition to those lists in Standard Specifications Sections 101.03 and 101.04 and any related FSSS’s.

––-–––– ACRONYMS –––––––

ALSC
American Lumber Standards Committee
APA
American Plywood Association
API
American Petroleum Institute
APWA
American Public Works Association
ARA
American Railway Association
AREA
American Railway Engineering Association
ASHRAE
American Society of Heating, Refrigerating & Air Conditioning Engineers
ASME
American Society of Mechanical Engineers
ATCC
American Type Culture Collection
CS
Commercial Standard issued by U.S. Department of Commerce
CSI
Construction Specifications Institute
CY
Cubic Yard
DEMA
Diesel Engine Manufacturers Association
DOT
Department of Transportation

FED. SPEC.

FS

Federal Specifications

FSSS
Forest Service Supplemental Specifications
ICBO
International Conference of Building Officials
IEEE
Institute of Electrical and Electronic Engineers
NBFU
National Board of Fire Underwriters
NBS
National Bureau of Standards
NCHRP
National Cooperative Highway Research Program
NFPA (Fire)
National Fire Protection Association
NFPA (Forest)
National Forest Products Association
NWMA
National Woodwork Manufacturers Association
PE
Polyethylene
PS
Product Standard Issued by the U.S. Department of Commerce
RIS
Redwood Inspection Service
SMACNA
Sheet Metal & Air Conditioning Contractors National Association
UBC
Uniform Building Code
UFC
Uniform Fire Code
UL
Underwriter's Laboratories, Inc.
UMC
Uniform Mechanical Code
UPC
Uniform Plumbing Code
USASI
United States of America Standards Institute
WWPAA
Western Wood Products Association
WWPI
Western Wood Preservation Institute
Calendar Day
Every day shown on the calendar, Sundays and holidays included.
Change Order
A written order, signed by the Contracting Officer, directing the contractor to make a change that the Changes clause authorizes the Contracting Officer to order without the contractor’s consent.
Contract Modification
A bilateral written supplemental agreement between the Government and the Contractor.
Equipment
All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Forest Supervisor
The person, or designated representative, responsible for administration of a National Forest.
Notice of Non-Compliance
Written notice issued detailing specific area(s) of Non-Compliance with contract requirements.
Utility Services
Services such as electricity, gas, steam, water and sewerage.
Work Order
A written instruction directing the Contractor to fulfill contract requirements.

List of applicable Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units

STANDARD SPECIFICAIONS

FOR CONSTRUCTION OF

ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS

FP-03

US CUSTOMARY UNITS

Project Name:
Fir Creek Aquatic Organism Passage and Bridge Construction
Date:
09/17/2009
ID LABEL
1
2
3
4
5
ROAD NO.
2350000

MP 0.05

Terminus Begin Fir Creek

Terminus End Fir Creek

Construction (C) Reconstruction (R) C

List of applicable Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units

Specifications
Supplements
Road Numbers

2350000

101 - Terms, Format, and Definitions
X
X
102 - Bid, Award, and Execution of Contract
X
X
103 - Scope of Work
X
X
104 - Control of Work
X
X
105 - Control of Material
X
X
106 - Acceptance of Work
X
X
107 - Legal Relations and Responsibility to the Public
X
X
108 - Prosecution and Progress
X
X
109 - Measurement and Payment
X
X

151 - Mobilization

152 - Construction Survey and Staking
X
X
153 - Contractor Quality Control
X
X

154 - Contractor Sampling and Testing

155 - Schedules for Construction Contracts
X
X
156 - Public Traffic
X
X
157 - Soil Erosion Control
X
X

158 - Watering for Dust Control

170 – Develop Water Supply and Watering
X
X
171 – Weed and Disease Prevention
X
X

183 – P Line Survey

201 - Clearing and Grubbing
X
X

202 - Additional Clearing and Grubbing

203 - Removal of Structures and Obstructions
X
X
204 - Excavation and Embankment
X
X

205 - Rock Blasting

207 - Earthwork Geotextiles

208 - Structure Excavation and Backfill for Selected Major Structures
X
X

209 - Structure Excavation and Backfill

210 - Permeable Backfill

211 - Roadway Obliteration

212 - Linear Grading

212 - Linear Grading

213 - Subgrade Stabilization

251 - Riprap
X
X

252 - Special Rock Embankment and Rock Buttress

253 - Gabions and Revet Mattresses

254 - Crib Walls

255 - Mechanically Stabilized Earth Walls

256 - Permanent Ground Anchors

257 - Alternate Retaining Walls

258 - Reinforced Concrete Retaining Walls

259 - Soil Nail Retaining Walls

260 - Rock Bolts

261 - Rock Dowels

301 - Untreated Aggregate Courses

302 - Treated Aggregate Courses

303 - Road Reconditioning

304 - Aggregate-Stabilization

305 - Aggregate-Topsoil Course

306 - Dust Palliative

308 - Minor Crushed Aggregate

309 - Emulsified Asphalt Treated Base

322 – Minor Aggregate Courses
X
X

401 - Superpave Hot Asphalt Concrete Pavement

402 - Hot Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method

403 - Hot Asphalt Concrete Pavement

404 - Minor Hot Asphalt Concrete
X
X

405 - Open Graded Asphalt Friction Courses

408 - Cold Recycled Asphalt Base Course

409 - Asphalt Surface Treatment

410 - Slurry Seal

411 - Asphalt Prime Coat

412 - Asphalt Tack Coat

413 - Asphalt Pavement Milling

415 - Paving Geotextiles

416 - Continuous Cold Recycled Asphalt Base Course

417 - Minor Cold Asphalt Mix

501 - Rigid Pavement

502 - Rigid Pavement Restoration

551 - Driven Piles
X
X
552 - Structural Concrete
X
X
553 - Prestressed Concrete
X
X
554 - Reinforcing Steel
X
X
555 - Steel Structures
X
X
556 - Bridge Railing
X
X

557 - Timber Structures

X

558 - Dampproofing

559 - Waterproofing

560 - Removal of Concrete by Hydrodemolition

562 - Temporary Works

563 - Painting

564 - Bearing Devices

X

565 - Drill Shafts

566 - Shotcrete

601 - Minor Concrete

602 - Culverts and Drains

603 - Structural Plate Structures

604 - Manholes, Inlets, and Catch Basins

605 - Underdrains, Sheet Drains, and Pavement Edge Drains

606 - Corrugated Metal Spillways

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

608 - Paved Waterways

609 - Curb and Gutter

X

610 - Horizontal Drains

611 - Water Systems

612 - Sanitary Sewer Systems

613 - Simulated Stone Masonry Surface

614 - Lean Concrete Backfill

615 - Sidewalks, Drive Pads, and Paved Medians

616 - Slope Paving

617 - Guardrail
X
X

618 - Concrete Barriers and Precast Guardwalls

619 - Fences, Gates, and Cattleguards

620 - Stone Masonry

621 - Monuments and Markers

622 - Rental Equipment

623 - General Labor

624 - Topsoil

625 - Turf Establishment
X
X

626 - Plants, Trees, Shrubs, Vines, and Groundcovers

627 - Sod

628 - Sprigging

629 - Erosion Control Mats, Roving, and Cellular Confinement Systems

X

633 - Permanent Traffic Control

634 - Permanent Pavement Marking

X

635 - Temporary Traffic Control
X
X
636 - Signal, Lighting, and Electrical Systems
X
X

637 - Facilities and Services

648 Stream Simulation
X
X
701 - Cement
X
X

702 - Asphalt Material

703 - Aggregate
X
X

704 - Soil

705 - Rock
X
X

706 - Concrete and Plastic Pipe

707 - Metal Pipe

708 - Paint

709 - Reinforcing Steel and Wire Rope
X
X

710 - Fence and Guardrail

X

711 - Concrete Curing Material and Admixtures

X

712 - Joint Material
X
X
713 - Roadside Improvement Material
X
X

714 - Geotextile and Geocomposite Drain Material

715 - Piling
X
X

716 - Material for Timber Structures

X

717 - Structural Metal
X
X
718 - Traffic Signing and Marking Material
X
X

720 - Structural Wall and Stabilized Embankment Material

721 - Electrical and Illumination Material

722 - Anchor Material

725 - Miscellaneous Material
X
X

Table of Contents

––-–––– ACRONYMS –––––––18
Table of Contents26
Preface29
101 - Terms, Format, and Definitions29
101.01 Meaning of Terms29
101.03 Abbreviations.29
101.04 Definitions.29
102 - Bid, Award, and Execution of Contract32
102 Bid, Award, and Execution of Contract32
103 - Scope of Work32
Deletions32
104 - Control of Work32
Deletions32
104.03 Specifications and Drawings.32
104.06 Use of Roads by Contractor33
105 - Control of Material34
105.02 Material Sources.34
105.02 Material Sources.34
105.02(a) Contractor-provided sources.34
105.05 Use of Material Found in the Work.34
106 - Acceptance of Work34
106.01 Conformity with Contract Requirements.34
106.07 Delete36
107 - Legal Relations and Responsibility to the Public36
107.05 Responsibility for Damage Claims.36
107.06 Contractor’s Responsibility for Work.37
107.09 Legal Relationship of the Parties.37
107.10 Environmental Protection.37
108 - Prosecution and Progress37
108 Delete.38
109 - Measurement and Payment38
109 Deletions38
109.02 Measurement Terms and Definitions.38
152 - Construction Survey and Staking38
152.02 General.39
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.41
153 - Contractor Quality Control42
153.02 Contractor Quality Control Plan.42
153.04 Records.42
155 - Schedules for Construction Contracts43
155 Delete.43
156 - Public Traffic43
156.03 Accommodating Traffic During Work.45
156.04 Maintaining Roadways During Work.45
157 - Soil Erosion Control45
157.03 General45
170 - Develop Water Supply and Watering46
171 - Weed and Disease Prevention47
201 - Clearing and Grubbing48
201.02 Material:48
201.03 General.48
201.04 Clearing.48
203 – Removal of Structures and Obstructions48
203.05 Disposing of Material.49
204 - Excavation and Embankment51
208 - Structure Excavation and Backfill for Selected Major Structures64
208.04 General.64
208.09 Foundation Preparation.64
208.13 Measurement.64
251 - Riprap65
251.08 Measurement.65
322 - Minor Aggregate Courses66
404 - Minor Hot Asphalt Concrete73
404.02 Composition of Mix (Job-Mix Formula).73
404.07 Compacting (a).73
404.09 Acceptance.74
Table 404-1. Sampling and Testing Requirements.74
551 - Driven Piles75
551.03 Pile Driving Equipment.75
551.08 Preparation and Driving.75
551.16 Measurement.75
552 - Structural Concrete76
552.02 Material76
552.03 Composition (Concrete Mix Design).76
552.08Delivery.78
552.09 Quality Control of Mix.78
552.11 Handling and Placing Concrete.78
552.12 Construction Joints.79
552.18 Loads on New Concrete Structures.79
553 - Prestressed Concrete80
553.02 Material.80
553.03 Method Approval.80
553.05 Concrete.80
553.06 Tensioning.81
553.07 Pretensioned Members.81
554 - Reinforcing Steel82
554.08 Placing & Fastening.82
554.1182
555 - Steel Structures82
555.18 Welding.82
556 - Bridge Railing83
556.0183
556.0283
556.05 Steel Railing.83
617 - Guardrail84
617.0284
617.03 Posts.84
617.04 Rail Elements.84
617.05 Terminal Sections.84
625 - Turf Establishment85
625.03 General.85
625.04 Preparing Seedbed.85
625.05 Watering85
625.06 Fertilizing.85
625.07 Seeding.86
625.08 Mulching.86
625.09 Protecting and Caring for Seeded Areas86
625.11 Measurement.86
635 - Temporary Traffic Control87
635.03 General.87
648 – Streambed Simulation87
701. – Cement89
701.01 Hydraulic Cement.89
701.02 Masonry and Mortar Cement.89
703 - Aggregate91
703.05 Subbase, Base, Surface Course, and Screened Aggregate.91
705 - Rock96
705.07 Streambed Simulation Rock.96
705.08 Channel Rock.96
709 - Reinforcing Steel and Wire Rope97
712 - Joint Material98
712.01 Sealants, Fillers, Seals, and Sleeves98
713 - Roadside Improvement Material98
713.05 Mulch.98
715 - Piling98
715.08 Pile Shoes.98
717 - Structural Metal99
717.01 Structural Steel99
717.07 Galvanized Coatings99
718 - Traffic Signing and Marking Material99
718.05 Aluminum Panels99
725 - Miscellaneous Material100
725.04 Pozzolans.100
725.21 Epoxy Resin Adhesives100
725.22 Grout.100

Preface Preface_wo_03_15_2004_m The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Figure 101-1—Illustration of road structure terms.

104.03_nat_us_02_22_2005

104.03 Specifications and Drawings.

(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.

Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.

Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.

Show the following types of changes on the as-built plans:

(1) Typical section(s)

(a) Revisions in dimensions

(b) Revisions in materials

(2) Plan and profile

· Revisions to the alignment

· Changes in the construction limits

· Revisions in location, type, and grade of road approaches

· Location and type of utilities

· Location, size, and type of underdrains

· Skew of culverts

· Channel changes

· Location of monuments and permanent references

· Elevations for all aerial and underground crossings of utilities

· Location, length, and type of fencing

· Revisions to grades, elevations, and stationing of intersection PIs

· Equations

· Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.

· Location, length, stationing, and type of retaining walls

· Location, length, stationing, and end treatment of guardrail

(3) Bridge

(a) Stationing of bridge ends

(b) Revisions to footing and seal elevations

(c) Pile length, size, type, and tip elevation

(d) Any changes in plan or dimensions including any major changes in reinforcing

(4) Miscellaneous

(a) Revisions to parking areas or turnouts

(b) Final location, type and length of curbs, sidewalks, etc.

Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.

104.06_nat_us_02_17_2005

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.02_nat_us_03_08_2007

105.02 Material Sources.

105.02(a) Contractor-provided sources.

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work will be weed-free. A Forest Service weed specialist will inspect proposed sources to determine weed-free status. Provide the Contracting Officer written notification of proposed material sources 14 days prior to use. Written approval of the specific source will be provided to the contractor. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004 107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

152 - Construction Survey and Staking 152.00_nat_us_08_05_2005 Description

152.01(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Construction Requirements

152.02 General.

When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.

Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations

152.03 Survey and Staking Requirements.

(b) Roadway cross-sections.

Replace the first two sentences with the following:

Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.

c) Slope Stakes & References:

Slope stakes and references. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

· Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

· Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

(d) Clearing and grubbing limits.

Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line

(e) Centerline reestablishment.

Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.

(g) Culverts.

Replace subsection with the following:

Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:

(1) Diameter, actual field measured length, and type of culvert.

(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.

(3) Station of actual point where culvert intersects centerline.

When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.

152.03 (l) Miscellaneous Survey and Staking.

Add the following:

(11) Cattleguards

(12) Drain Dips

(13) Erosion Control Measures

Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.

Precision Class

Minimum Position Closure
Angular Accuracy (±)
L-Line Tangent Control Pointsa (±)

Vertical Closureb (±)

A (Bridges)

1/10,000
2 sets, direct/reverse

10 second rejection limit

N/A
0.02 ft or

0.02ft/1000ftc

B
1/5,000
2 sets, direct/reverse

20 second rejection limit

0.1 ft
0.02 ft or

0.02ft/1000ftc

C
1/1,000
1 set, direct/reverse

1 minute rejection limit

0.2 ft
0.5ft/1000ftc
D
1/300
Foresight and backsight; 15 minute rejection limitc
0.4 ft
1.0ft/1000ftc
E
1/100
Foresight and backsight; 30 minute rejection limitc
0.8 ft
1.0ft/1000ftc

a. Accuracy of offset measurement.

b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.

c. Use greater value.

Table 152-2 Cross section and slope stake tolerances.

Item
Tolerances
A
B
C
D
E
Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves
(±)2o
(±)3o
(±)3o
(±)5o
(±)5o
Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed
0.5 ft
1.0 ft
2.0 ft
2.0 ft
3.0 ft
Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater.
0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%

Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.

Slope reference stakes and slope stakes.
0.1 ft or 0.4%
0.15 ft or 0.6%
0.2 ft or 1.0%
0.2 ft or 1.0%
0.3 ft or 1.0%
Clearing limits
1.0 ft
1.0 ft
1.0 ft
1.5 ft
2.5 ft

153 - Contractor Quality Control 153.02_nat_us_02_17_2005

153.02 Contractor Quality Control Plan.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.04_nat_us_10_24_2007

153.04 Records.

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

156 - Public…