Solicitation AG-0489-S-10-0213.docx
DOCX document 309 KB Posted
- Solicitation number
- AG-0489-S-10-0213
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industrial Fire Precaution Levels.pdf | ||
| Fire Plan.pdf | ||
| Amendment 1.pdf | ||
| MOU-Jan25_signed.pdf | ||
| Revised Section J.docx | DOCX document | |
| Solicitation AG-0489-S-10-0213 Rev 1.docx | DOCX document | |
| FirCreekBridgeDrawings12to14Signed.pdf | ||
| FirFinalForestDrawings1to11.pdf | ||
| FirBridgeTypicalsDrawings15to21.pdf | ||
| Updated Specs.zip | ZIP file | |
| fp-03usc-all.zip | ZIP file | |
| General Decision Number WA0800001 020510.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO: AG-0489-S-10-0213
| UNIT: Olympic NF |
| PROJ NAME: Fir Creek Organism Passage and Bridge Construction |
| PAGE 78 of 145 |
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0489-S-10-0213
2. TYPE OF SOLICITATION
|_| SEALED BID (IFB)
|X| NEGOTIATED (RFP)
3. DATE ISSUED
2/18/2010
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
356950
6. PROJECT NO.
| 7. ISSUED BY | CODE |
| 0489 | |
| 8. ADDRESS OFFER TO |
US Forest Service
EROC-NW
16400 Champion Way Sandy, OR 97055
| 9. FOR INFORMATION |
| CALL: |
| A. NAME |
Brad Reed B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 503-668-1695
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
TAS::12 1102::TAS Capital Improvement and Maintenance
This contract will be funded and awarded under the provisions of the American Recovery and Reinvestment Act of 2009 (ARRA)
Performance and Payment Bonds in original form (no copies) are required at 100% of the original contract amount.
Terms and conditions as stated in the Solicitation # AG-0489-S-10-0213 are in full force and effect. See Schedule of Items for bid items description, unit of issue and quantities.
The Government's estimate is: between $250,000 and $500,000.
11. The Contractor shall begin performance within 10 calendar days and complete it within 90 calendar days after receiving |_| award, X notice to proceed. This performance period is |X| mandatory, |_| negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
| |X| YES | |_| NO | |
| 12B. CALENDAR DAYS |
| 13. ADDITIONAL SOLICITATION REQUIREMENTS: | |||
| A. | Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time March 22, 2010(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due. | ||
| B. | An offer guarantee | X is, | |_| is not required. |
| C. | All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. | ||
| D. | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated
| Prescribed by GSA |
| FAR (48 CFR) 53.236-1(e) |
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
| 24. SUBMIT INVOICES TO ADDRESS SHOWN IN |
| (4 copies unless otherwise specified) |
| ITEM |
| 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO | |
| |_| 10 U.S.C. 2304(c)( ) | |_| 41 U.S.C. 253(c)( ) |
| 26. ADMINISTERED BY | CODE |
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| |_| | 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract. |
| |_| | 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary. |
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
| Computer Generated | STANDARD FORM 1442 BACK (REV. 4-85) |
| SOL NO: AG-0489-S-10-0213 | |
| UNIT: Olympic NF | |
| PROJ NAME: Fir Creek Organism Passage and Bridge Construction | |
| PAGE 2 of 144 |
| SOL NO: AG-0489-S-10-0213 |
| UNIT: Olympic NF |
| PROJ NAME: Fir Creek Organism Passage and Bridge Construction |
| PAGE 61 of 145 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
SCHEDULE OF ITEMS
Solicitation No. AG-0489-S-10-0213
Project Name:
Fir Creek Organism Passage and Bridge Construction Location:
Olympic NF
Contractor:
Issuing and Billing Office:
USDA Forest Service
EROC-NW
16400 Champion Way Sandy, OR 97055
Item No.
Sub-item No.
Description
Unit Qty
Unit Price
Amount
| 55601 |
| Standard steel W-Beam with curb bridge railing |
| Foot |
| 125 |
| 61701 |
| Guardrail system, steel bridge approach railing, type I, class A |
| Foot |
| 150 |
| 61755 |
| End piece, type C |
| Each |
| 4 |
| 61756 |
| Anchorage |
| Each |
| 4 |
| 56401 |
| Bearing device, elastomeric |
| Each |
| 16 |
62528
| Seeding and mulching, dry method |
| Lump Sum |
63501
Temporary traffic control Lump Sum
64804A
| Placed streambed simulation rock, select borrow, method A |
| Cubic Yard |
64804B
Placed streambed simulation rock, bed class 16, method A
Cubic Yard
| $________ |
| $________ |
64804C Placed streambed simulation rock, channel rock size 1, method A
Each
64804D Placed Streambed simulation rock, channel rock size 2, method A
Each
Sub Total Line Item 1
*OPTIONAL BID ITEMS:
20415
Unsuitable excavation
| Cubic Yard |
| 29 |
64804E
Placed streambed simulation rock, bed class 16, method A
Cubic Yard
SUB-TOTAL Line Item 2
TOTAL PRICE
Contractor Name:
Address:
Signature of Authorized Representative: Date:
TIN: DUNS: email:
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. Final Contract Quantities and possible quantity adjustment or removal of *OPTIONAL BID ITEMS shall be determined on the ground by the CO or a designated representative after inspection of subsurface material immediately adjacent to and under the existing culvert.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Fir Creek Aquatic Organism Passage. Project work consists of the following major items of work: Construction of a new bridge and foundations, roadway excavation and embankment, paving, removal of existing steel culvert; channel re-alignment and re-grading, placement of designed in-channel stream simulation material, placement of woody debris, haul of excavated material, and seeding and mulching. Unless noted otherwise all materials shall be provided by the contractor. All instream work shall be completed per the Memorandum of Understanding between the Forest Service and Washington State Fish and Wildlife attached to the contract.
C.2 PROJECT LOCATION
This project is located on the Hood Canal District, South Area of the Olympic National Forest, Section 33, Township 22 N, R 5 W. near Shelton, Wa. It may be reached by traveling Northwest of Shelton on Hwy 101, turning left on Skokomish Valley Rd. and traveling 5.5 miles on the Skokomish Valley Road, to Forest Road 23, turning right onto Forest Road 23 and traveling a couple miles to Forest Road 2350, turning left onto FR 2350 and traveling 0.05 miles.
a) Existing Conditions:
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.
b) Weather Conditions:
Weather conditions suitable for ground excavation are normally expected in May through October. Rain, sometimes heavy, is normal throughout the winter, with periods of light to moderate snowfall. Night freezing is common throughout the winter and several periods of weeklong freezes are likely.
c) Operating Season: Inclusive dates during which operations are permissible.
| Activity |
| Start Date |
| End Date |
| Restrictions |
| Construction Season * |
| 7/15 |
| 10/15 |
| Hand Tools |
| 7/15 |
| 10/15 |
| Power Tools / 2 Chainsaws |
| 7/15 |
| 10/15 |
| Machinery / Car Traffic |
| 7/15 |
| 10/15 |
| Heavy Machinery |
| 7/15 |
| 10/15 |
| Time of Day Restriction |
| 7/15 |
| 09/15 |
| Operations restricted to between 2 hours after sunrise and 2 hours before sunset. |
| In-Stream Work |
| 7/15 |
| 9/15 |
| (HPA/MOU) |
* Road Closure at the site is limited from July 15, 2010- October 15, 2010
Notes – Noise Limitation:
· Power Tools/2 Chainsaws - any power tools with noise output cannot exceed output of two operating chainsaws.
· Machinery/Car Traffic - any machinery with noise output is limited to noise output from normal vehicular traffic at site (e.g. small excavator/backhoe).
· Helicopter/Heavy Machinery - any machinery with noise output that is greater than normal vehicular traffic at site.
d) Pre-bid Conference:
None scheduled. If a sufficient number of bidders request a conference, one may be scheduled and information posted along with the solicitation.
As mutually agreed between Small Business Administration and U.S.D.A.- Forest Service.
C.3 AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.210-3) (APR 1984)
Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:
| Specification |
| Address |
Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects
FP-03
U.S. Customary Units Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402 866-512-1800 http://bookstore.gpo.gov/ http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm
| ASTM Standards |
| American Society for Testing and Materials |
P.O. Box C700 100 Bar Harbor Drive West Conshohocken, PA 19428-2959
(610) 832-9585 http://www.astm.org
| AASHTO Standards |
| American Association of State |
Highway and Transportation Officials 444 North Capitol Street, NW Suite 249 Washington, D.C., 20001
(206) 624- 5800 http://www.aashto.org
C.4 APPLICABLE SPECIFICATIONS AND MATERIAL CERTIFICATIONS
(a) Applicable Specifications:
References to Standard Specifications in the contract refer to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units.
Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.
The Forest Service Supplemental Specifications to the FP-03 are also given on the Specification List. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.
(b) Product Substitution:
Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
Shop Drawings Submittals:
Submit the following shop drawings on this project (4 sets unless noted):
| Title |
| Referenced by Specification No. |
| Time Allowed for Govt. Review After Submittal |
| Bridge Railing and Approach Railing Shop Drawings |
| 104.03(b)(1)(d) |
| 21 Days |
| Prestressed Member Details |
| 104.03(b)(1)(e) & |
21 Days
| Prestressed Precast Members |
| 104.03(b)(1)(e) & 553 |
| 21 Days |
| Reinforcing Steel Shop Drawings (Bar lists and bending diagrams) |
| 554.03 |
| 21 Days |
| As-Built Plans * |
| 104.03(c) |
| N/A |
(c) Material Certification, Testing Reports and Submittals:
| Brief Title |
| Basic Reference Specification |
| Detailed Regulations Specification |
| Copies To Submit |
| Time for Government Approval After Total Submittal |
| Traffic Control Management Plan |
| C.4 |
| 156 |
& MUTCD Part 6
| 1 |
| 7 Days |
Written Notification of Road Closure
156.03
156.03
14 Days
| Hazardous Spill Plan |
| 107.10 |
| 1 |
| 7 Days |
Fire Plan
| J.4 |
| 1 |
| 7 Days |
| Quality Control Plan |
| 153.02 |
| 1 |
| 7 Days |
| Project Work Schedule any any Revisions |
| FAR 52.236-15c |
| 1 |
| 7 Days |
| Notification for Moving Construction Equipment onto Project |
| 171.03 |
| 171.03 |
| 1 |
| 14 Days |
| Erosion Control Plan |
| 157.03 |
| 157.03 & Plans |
| 3 |
| 14 Days |
| Dewatering and Sediment Control Plan |
| 157.03 |
| HPA/MOU |
| 3 |
| 14 Days |
| Stream Diversion Plan |
| 203.04 |
| 203.04 |
| 3 |
| 21 Days |
Structure Removal Plan (Culvert)
203.04
203.04
21 Days
| Target Values for Gradation |
| FS Supplemental 322.03 |
| Tables 703-2 & 703-3 |
| 2 |
| 7 Days |
| Riprap (commercial source) |
| 251.07 & |
106.03
| 705.02 |
| 2 |
| 7 Days |
| Asphalt Concrete Mixing Plant Certification |
| 404.02 |
| 404.02 |
| 2 |
| 14 Days |
| Minor Hot Asphalt Concrete Mix Design |
| 404.02 |
| 404.02 |
| 1 |
| 7 Days |
| Hot Asphalt Concrete Quality Control Certificates |
| 404.09 & 106 |
| 404.09 |
| 2 |
| N/A |
| Pile Driving Equipment |
| 551 |
| 551.03(b)(1) |
| 2 |
| 14 Days |
| Wave Equation Analysis |
| 551 |
| 551.03(b)(2) |
| 2 |
| 14 Days |
| Pile Production Certificate |
| 551.15 |
| 715.06 |
| 1 |
| 14 Days |
Manufacturer Data for Pile Shoe Attachment
715.08
715.08
14 Days
| Concrete Mix Design, including admixtures |
| 552.03 |
| 1 |
| 14 Days |
| Portland Cement Production Certification |
| 552.19 |
| 701.01 (a) |
| 2 |
| N/A |
| Concrete Quality Control Certificates, including batch tickets and test results |
| 552.09, FS Supp 552.09 & 106 |
| 552.09, FS Supp 552.09 |
| 1 |
| N/A |
| PCI Plant Certification |
| FS Supp 553.03 |
| FS Supp 553.03 |
| 2 |
| 21 Days |
| PCI Plant Quality Control Report |
| FS Supp 553.03 |
| FS Supp 553.03 |
| 2 |
| 21 Days |
| Concrete Mix Design for Prestressed Members |
| 553 |
| 553.11, 553.03, 552.03 |
| 2 |
| 21 Days |
| Prestressing Strand Certification |
| 553 |
| 553.11, 709.03& FS Supp 553.03 |
| 2 |
| 21 Days |
| Prestressed Concrete Test Results |
| 553 |
| 553.11, 553.03 & FS Supp 5 53.03 |
| 2 |
| N/A |
| Reinforcing Steel Production Certification |
| 554.10 |
| 709.01 & FS Supp 709.01 |
| 1 |
| N/A |
Structural Steel Certified Test Results
a. Steel Specified by AASHTO Designation
b. Steel Specified by ASTM Designation 555.20
555.05 & 717.01
555.05 & Plans
AASHTO M270 & Plans
ASTM A36 & Plans
21 Days
21 Days
| Certified Bridge Welder |
| 555.03, 551.09 & Plans |
| ANSI/AASHTO/AWS Bridge Welding Code D1.5 |
| 2 |
| 21 Days |
| Bridge Railing Production Certification |
| 556.10 |
| 710.06 |
| 2 |
| 21 Days |
| Seed |
| 625 |
| 713.03 |
713.04 713.05
| 3 |
| 7 Days |
| Straw (Weed-free) |
| 625 |
| 713.05 |
| 3 |
| 7 Days |
| Erosion Control Blanket |
| 629.07 & 106.03 |
| 713.17 & Table 713-3 |
| 1 |
| 21 Days |
| Portland Cement Production Certification |
| FP-03 552.19, FP-03 701.01 (a) |
| 1 |
| N/A |
| Portland Cement Production Certification |
| High Strength Non-Shrink Grout Data |
| 725.22 (c) & FS Supp 725.22 (c) |
| State Qualified Products List |
| 2 |
| 14 Days |
(d) General Guidelines for Submittals:
Submittals are required by their corresponding specifications (basic reference & detailed requirement). Work requiring submittals shall not begin until submittals have been approved.
Submittals shall include the following:
· Date and Revision Dates.
· Project Name and Contract Number.
· Names of Contractor, Subcontractor, Supplier, and Manufacturers.
· Field Dimensions and Relation to Adjacent Structures.
· Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.
Samples:
Physical samples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.
Manufacturer's requirements:
Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.
Approval or Rejection Time Allowance:
Submittals will be reviewed and either approved or rejected by (SEE (d) ABOVE).
C.5 Attachments to Statement of Work/Specifications (AGAR 452.211-73)(FEB 1988)
The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.
Definition and Acronyms
Wherever in these provisions or in other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:
Reference to a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.
These Definitions and Abbreviations are in addition to those lists in Standard Specifications Sections 101.03 and 101.04 and any related FSSS’s.
––-–––– ACRONYMS –––––––
| ALSC |
| American Lumber Standards Committee |
| APA |
| American Plywood Association |
| API |
| American Petroleum Institute |
| APWA |
| American Public Works Association |
| ARA |
| American Railway Association |
| AREA |
| American Railway Engineering Association |
| ASHRAE |
| American Society of Heating, Refrigerating & Air Conditioning Engineers |
| ASME |
| American Society of Mechanical Engineers |
| ATCC |
| American Type Culture Collection |
| CS |
| Commercial Standard issued by U.S. Department of Commerce |
| CSI |
| Construction Specifications Institute |
| CY |
| Cubic Yard |
| DEMA |
| Diesel Engine Manufacturers Association |
| DOT |
| Department of Transportation |
FED. SPEC.
FS
Federal Specifications
| FSSS |
| Forest Service Supplemental Specifications |
| ICBO |
| International Conference of Building Officials |
| IEEE |
| Institute of Electrical and Electronic Engineers |
| NBFU |
| National Board of Fire Underwriters |
| NBS |
| National Bureau of Standards |
| NCHRP |
| National Cooperative Highway Research Program |
| NFPA (Fire) |
| National Fire Protection Association |
| NFPA (Forest) |
| National Forest Products Association |
| NWMA |
| National Woodwork Manufacturers Association |
| PE |
| Polyethylene |
| PS |
| Product Standard Issued by the U.S. Department of Commerce |
| RIS |
| Redwood Inspection Service |
| SMACNA |
| Sheet Metal & Air Conditioning Contractors National Association |
| UBC |
| Uniform Building Code |
| UFC |
| Uniform Fire Code |
| UL |
| Underwriter's Laboratories, Inc. |
| UMC |
| Uniform Mechanical Code |
| UPC |
| Uniform Plumbing Code |
| USASI |
| United States of America Standards Institute |
| WWPAA |
| Western Wood Products Association |
| WWPI |
| Western Wood Preservation Institute |
| Calendar Day |
| Every day shown on the calendar, Sundays and holidays included. |
| Change Order |
| A written order, signed by the Contracting Officer, directing the contractor to make a change that the Changes clause authorizes the Contracting Officer to order without the contractor’s consent. |
| Contract Modification |
| A bilateral written supplemental agreement between the Government and the Contractor. |
| Equipment |
| All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work. |
| Forest Supervisor |
| The person, or designated representative, responsible for administration of a National Forest. |
| Notice of Non-Compliance |
| Written notice issued detailing specific area(s) of Non-Compliance with contract requirements. |
| Utility Services |
| Services such as electricity, gas, steam, water and sewerage. |
| Work Order |
| A written instruction directing the Contractor to fulfill contract requirements. |
List of applicable Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units
STANDARD SPECIFICAIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
FP-03
US CUSTOMARY UNITS
| Project Name: |
| Fir Creek Aquatic Organism Passage and Bridge Construction |
| Date: |
| 09/17/2009 |
| ID LABEL |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| ROAD NO. |
| 2350000 |
MP 0.05
Terminus Begin Fir Creek
Terminus End Fir Creek
Construction (C) Reconstruction (R) C
List of applicable Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, US Customary Units
| Specifications |
| Supplements |
| Road Numbers |
2350000
| 101 - Terms, Format, and Definitions |
| X |
| X |
| 102 - Bid, Award, and Execution of Contract |
| X |
| X |
| 103 - Scope of Work |
| X |
| X |
| 104 - Control of Work |
| X |
| X |
| 105 - Control of Material |
| X |
| X |
| 106 - Acceptance of Work |
| X |
| X |
| 107 - Legal Relations and Responsibility to the Public |
| X |
| X |
| 108 - Prosecution and Progress |
| X |
| X |
| 109 - Measurement and Payment |
| X |
| X |
151 - Mobilization
| 152 - Construction Survey and Staking |
| X |
| X |
| 153 - Contractor Quality Control |
| X |
| X |
154 - Contractor Sampling and Testing
| 155 - Schedules for Construction Contracts |
| X |
| X |
| 156 - Public Traffic |
| X |
| X |
| 157 - Soil Erosion Control |
| X |
| X |
158 - Watering for Dust Control
| 170 – Develop Water Supply and Watering |
| X |
| X |
| 171 – Weed and Disease Prevention |
| X |
| X |
183 – P Line Survey
| 201 - Clearing and Grubbing |
| X |
| X |
202 - Additional Clearing and Grubbing
| 203 - Removal of Structures and Obstructions |
| X |
| X |
| 204 - Excavation and Embankment |
| X |
| X |
205 - Rock Blasting
207 - Earthwork Geotextiles
| 208 - Structure Excavation and Backfill for Selected Major Structures |
| X |
| X |
209 - Structure Excavation and Backfill
210 - Permeable Backfill
211 - Roadway Obliteration
212 - Linear Grading
212 - Linear Grading
213 - Subgrade Stabilization
| 251 - Riprap |
| X |
| X |
252 - Special Rock Embankment and Rock Buttress
253 - Gabions and Revet Mattresses
254 - Crib Walls
255 - Mechanically Stabilized Earth Walls
256 - Permanent Ground Anchors
257 - Alternate Retaining Walls
258 - Reinforced Concrete Retaining Walls
259 - Soil Nail Retaining Walls
260 - Rock Bolts
261 - Rock Dowels
301 - Untreated Aggregate Courses
302 - Treated Aggregate Courses
303 - Road Reconditioning
304 - Aggregate-Stabilization
305 - Aggregate-Topsoil Course
306 - Dust Palliative
308 - Minor Crushed Aggregate
309 - Emulsified Asphalt Treated Base
| 322 – Minor Aggregate Courses |
| X |
| X |
401 - Superpave Hot Asphalt Concrete Pavement
402 - Hot Asphalt Concrete Pavement by Hveem or Marshall Mix Design Method
403 - Hot Asphalt Concrete Pavement
| 404 - Minor Hot Asphalt Concrete |
| X |
| X |
405 - Open Graded Asphalt Friction Courses
408 - Cold Recycled Asphalt Base Course
409 - Asphalt Surface Treatment
410 - Slurry Seal
411 - Asphalt Prime Coat
412 - Asphalt Tack Coat
413 - Asphalt Pavement Milling
415 - Paving Geotextiles
416 - Continuous Cold Recycled Asphalt Base Course
417 - Minor Cold Asphalt Mix
501 - Rigid Pavement
502 - Rigid Pavement Restoration
| 551 - Driven Piles |
| X |
| X |
| 552 - Structural Concrete |
| X |
| X |
| 553 - Prestressed Concrete |
| X |
| X |
| 554 - Reinforcing Steel |
| X |
| X |
| 555 - Steel Structures |
| X |
| X |
| 556 - Bridge Railing |
| X |
| X |
557 - Timber Structures
X
558 - Dampproofing
559 - Waterproofing
560 - Removal of Concrete by Hydrodemolition
562 - Temporary Works
563 - Painting
564 - Bearing Devices
X
565 - Drill Shafts
566 - Shotcrete
601 - Minor Concrete
602 - Culverts and Drains
603 - Structural Plate Structures
604 - Manholes, Inlets, and Catch Basins
605 - Underdrains, Sheet Drains, and Pavement Edge Drains
606 - Corrugated Metal Spillways
607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures
608 - Paved Waterways
609 - Curb and Gutter
X
610 - Horizontal Drains
611 - Water Systems
612 - Sanitary Sewer Systems
613 - Simulated Stone Masonry Surface
614 - Lean Concrete Backfill
615 - Sidewalks, Drive Pads, and Paved Medians
616 - Slope Paving
| 617 - Guardrail |
| X |
| X |
618 - Concrete Barriers and Precast Guardwalls
619 - Fences, Gates, and Cattleguards
620 - Stone Masonry
621 - Monuments and Markers
622 - Rental Equipment
623 - General Labor
624 - Topsoil
| 625 - Turf Establishment |
| X |
| X |
626 - Plants, Trees, Shrubs, Vines, and Groundcovers
627 - Sod
628 - Sprigging
629 - Erosion Control Mats, Roving, and Cellular Confinement Systems
X
633 - Permanent Traffic Control
634 - Permanent Pavement Marking
X
| 635 - Temporary Traffic Control |
| X |
| X |
| 636 - Signal, Lighting, and Electrical Systems |
| X |
| X |
637 - Facilities and Services
| 648 Stream Simulation |
| X |
| X |
| 701 - Cement |
| X |
| X |
702 - Asphalt Material
| 703 - Aggregate |
| X |
| X |
704 - Soil
| 705 - Rock |
| X |
| X |
706 - Concrete and Plastic Pipe
707 - Metal Pipe
708 - Paint
| 709 - Reinforcing Steel and Wire Rope |
| X |
| X |
710 - Fence and Guardrail
X
711 - Concrete Curing Material and Admixtures
X
| 712 - Joint Material |
| X |
| X |
| 713 - Roadside Improvement Material |
| X |
| X |
714 - Geotextile and Geocomposite Drain Material
| 715 - Piling |
| X |
| X |
716 - Material for Timber Structures
X
| 717 - Structural Metal |
| X |
| X |
| 718 - Traffic Signing and Marking Material |
| X |
| X |
720 - Structural Wall and Stabilized Embankment Material
721 - Electrical and Illumination Material
722 - Anchor Material
| 725 - Miscellaneous Material |
| X |
| X |
Table of Contents
| ––-–––– ACRONYMS ––––––– | 18 | |
| Table of Contents | 26 | |
| Preface | 29 | |
| 101 - Terms, Format, and Definitions | 29 | |
| 101.01 Meaning of Terms | 29 | |
| 101.03 Abbreviations. | 29 | |
| 101.04 Definitions. | 29 | |
| 102 - Bid, Award, and Execution of Contract | 32 | |
| 102 Bid, Award, and Execution of Contract | 32 | |
| 103 - Scope of Work | 32 | |
| Deletions | 32 | |
| 104 - Control of Work | 32 | |
| Deletions | 32 | |
| 104.03 Specifications and Drawings. | 32 | |
| 104.06 Use of Roads by Contractor | 33 | |
| 105 - Control of Material | 34 | |
| 105.02 Material Sources. | 34 | |
| 105.02 Material Sources. | 34 | |
| 105.02(a) Contractor-provided sources. | 34 | |
| 105.05 Use of Material Found in the Work. | 34 | |
| 106 - Acceptance of Work | 34 | |
| 106.01 Conformity with Contract Requirements. | 34 | |
| 106.07 Delete | 36 | |
| 107 - Legal Relations and Responsibility to the Public | 36 | |
| 107.05 Responsibility for Damage Claims. | 36 | |
| 107.06 Contractor’s Responsibility for Work. | 37 | |
| 107.09 Legal Relationship of the Parties. | 37 | |
| 107.10 Environmental Protection. | 37 | |
| 108 - Prosecution and Progress | 37 | |
| 108 Delete. | 38 | |
| 109 - Measurement and Payment | 38 | |
| 109 Deletions | 38 | |
| 109.02 Measurement Terms and Definitions. | 38 | |
| 152 - Construction Survey and Staking | 38 | |
| 152.02 General. | 39 | |
| Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations. | 41 | |
| 153 - Contractor Quality Control | 42 | |
| 153.02 Contractor Quality Control Plan. | 42 | |
| 153.04 Records. | 42 | |
| 155 - Schedules for Construction Contracts | 43 | |
| 155 Delete. | 43 | |
| 156 - Public Traffic | 43 | |
| 156.03 Accommodating Traffic During Work. | 45 | |
| 156.04 Maintaining Roadways During Work. | 45 | |
| 157 - Soil Erosion Control | 45 | |
| 157.03 General | 45 | |
| 170 - Develop Water Supply and Watering | 46 | |
| 171 - Weed and Disease Prevention | 47 | |
| 201 - Clearing and Grubbing | 48 | |
| 201.02 Material: | 48 | |
| 201.03 General. | 48 | |
| 201.04 Clearing. | 48 | |
| 203 – Removal of Structures and Obstructions | 48 | |
| 203.05 Disposing of Material. | 49 | |
| 204 - Excavation and Embankment | 51 | |
| 208 - Structure Excavation and Backfill for Selected Major Structures | 64 | |
| 208.04 General. | 64 | |
| 208.09 Foundation Preparation. | 64 | |
| 208.13 Measurement. | 64 | |
| 251 - Riprap | 65 | |
| 251.08 Measurement. | 65 | |
| 322 - Minor Aggregate Courses | 66 | |
| 404 - Minor Hot Asphalt Concrete | 73 | |
| 404.02 Composition of Mix (Job-Mix Formula). | 73 | |
| 404.07 Compacting (a). | 73 | |
| 404.09 Acceptance. | 74 | |
| Table 404-1. Sampling and Testing Requirements. | 74 | |
| 551 - Driven Piles | 75 | |
| 551.03 Pile Driving Equipment. | 75 | |
| 551.08 Preparation and Driving. | 75 | |
| 551.16 Measurement. | 75 | |
| 552 - Structural Concrete | 76 | |
| 552.02 Material | 76 | |
| 552.03 Composition (Concrete Mix Design). | 76 | |
| 552.08 | Delivery. | 78 |
| 552.09 Quality Control of Mix. | 78 | |
| 552.11 Handling and Placing Concrete. | 78 | |
| 552.12 Construction Joints. | 79 | |
| 552.18 Loads on New Concrete Structures. | 79 | |
| 553 - Prestressed Concrete | 80 | |
| 553.02 Material. | 80 | |
| 553.03 Method Approval. | 80 | |
| 553.05 Concrete. | 80 | |
| 553.06 Tensioning. | 81 | |
| 553.07 Pretensioned Members. | 81 | |
| 554 - Reinforcing Steel | 82 | |
| 554.08 Placing & Fastening. | 82 | |
| 554.11 | 82 | |
| 555 - Steel Structures | 82 | |
| 555.18 Welding. | 82 | |
| 556 - Bridge Railing | 83 | |
| 556.01 | 83 | |
| 556.02 | 83 | |
| 556.05 Steel Railing. | 83 | |
| 617 - Guardrail | 84 | |
| 617.02 | 84 | |
| 617.03 Posts. | 84 | |
| 617.04 Rail Elements. | 84 | |
| 617.05 Terminal Sections. | 84 | |
| 625 - Turf Establishment | 85 | |
| 625.03 General. | 85 | |
| 625.04 Preparing Seedbed. | 85 | |
| 625.05 Watering | 85 | |
| 625.06 Fertilizing. | 85 | |
| 625.07 Seeding. | 86 | |
| 625.08 Mulching. | 86 | |
| 625.09 Protecting and Caring for Seeded Areas | 86 | |
| 625.11 Measurement. | 86 | |
| 635 - Temporary Traffic Control | 87 | |
| 635.03 General. | 87 | |
| 648 – Streambed Simulation | 87 | |
| 701. – Cement | 89 | |
| 701.01 Hydraulic Cement. | 89 | |
| 701.02 Masonry and Mortar Cement. | 89 | |
| 703 - Aggregate | 91 | |
| 703.05 Subbase, Base, Surface Course, and Screened Aggregate. | 91 | |
| 705 - Rock | 96 | |
| 705.07 Streambed Simulation Rock. | 96 | |
| 705.08 Channel Rock. | 96 | |
| 709 - Reinforcing Steel and Wire Rope | 97 | |
| 712 - Joint Material | 98 | |
| 712.01 Sealants, Fillers, Seals, and Sleeves | 98 | |
| 713 - Roadside Improvement Material | 98 | |
| 713.05 Mulch. | 98 | |
| 715 - Piling | 98 | |
| 715.08 Pile Shoes. | 98 | |
| 717 - Structural Metal | 99 | |
| 717.01 Structural Steel | 99 | |
| 717.07 Galvanized Coatings | 99 | |
| 718 - Traffic Signing and Marking Material | 99 | |
| 718.05 Aluminum Panels | 99 | |
| 725 - Miscellaneous Material | 100 | |
| 725.04 Pozzolans. | 100 | |
| 725.21 Epoxy Resin Adhesives | 100 | |
| 725.22 Grout. | 100 |
Preface Preface_wo_03_15_2004_m The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Figure 101-1—Illustration of road structure terms.
104.03_nat_us_02_22_2005
104.03 Specifications and Drawings.
(c) As-Built-Plans. Furnish one set of as built plans. The Government will provide one set of contract plans to be used exclusively for recording the as-built details of the project. Use red pencil or red ink to record the information on the as-built plans.
Note all additions or revisions to the location, character, and dimensions of the prescribed work shown on the contract plans. Line out all details shown that are not applicable to the completed work. Check off details shown that were incorporated into the completed work without change.
Retain the plans at the project site and, as work progresses, continually update them to reflect the as-built details. Upon request, make the plans available to the CO to review for compliance with these specifications.
Show the following types of changes on the as-built plans:
(1) Typical section(s)
(a) Revisions in dimensions
(b) Revisions in materials
(2) Plan and profile
· Revisions to the alignment
· Changes in the construction limits
· Revisions in location, type, and grade of road approaches
· Location and type of utilities
· Location, size, and type of underdrains
· Skew of culverts
· Channel changes
· Location of monuments and permanent references
· Elevations for all aerial and underground crossings of utilities
· Location, length, and type of fencing
· Revisions to grades, elevations, and stationing of intersection PIs
· Equations
· Culvert diameter, length, type, and stationing. On culvert extensions, indicate the length of the existing pipe and the length of the extension.
· Location, length, stationing, and type of retaining walls
· Location, length, stationing, and end treatment of guardrail
(3) Bridge
(a) Stationing of bridge ends
(b) Revisions to footing and seal elevations
(c) Pile length, size, type, and tip elevation
(d) Any changes in plan or dimensions including any major changes in reinforcing
(4) Miscellaneous
(a) Revisions to parking areas or turnouts
(b) Final location, type and length of curbs, sidewalks, etc.
Furnish the as-built working plans to the CO before the final inspection. Correct all details found during the final inspection that are not shown on the as-built plans and return to the CO within 5 days.
104.06_nat_us_02_17_2005
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.02_nat_us_03_08_2007
105.02 Material Sources.
105.02(a) Contractor-provided sources.
All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work will be weed-free. A Forest Service weed specialist will inspect proposed sources to determine weed-free status. Provide the Contracting Officer written notification of proposed material sources 14 days prior to use. Written approval of the specific source will be provided to the contractor. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004 107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.
109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
152 - Construction Survey and Staking 152.00_nat_us_08_05_2005 Description
152.01(c) Material.
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
Construction Requirements
152.02 General.
When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.
Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations
152.03 Survey and Staking Requirements.
(b) Roadway cross-sections.
Replace the first two sentences with the following:
Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.
c) Slope Stakes & References:
Slope stakes and references. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint.
· Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
· Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.
(d) Clearing and grubbing limits.
Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.
After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line
(e) Centerline reestablishment.
Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.
(g) Culverts.
Replace subsection with the following:
Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:
(1) Diameter, actual field measured length, and type of culvert.
(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.
(3) Station of actual point where culvert intersects centerline.
When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.
152.03 (l) Miscellaneous Survey and Staking.
Add the following:
(11) Cattleguards
(12) Drain Dips
(13) Erosion Control Measures
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.
Precision Class
| Minimum Position Closure |
| Angular Accuracy (±) |
| L-Line Tangent Control Pointsa (±) |
Vertical Closureb (±)
A (Bridges)
| 1/10,000 |
| 2 sets, direct/reverse |
10 second rejection limit
| N/A |
| 0.02 ft or |
0.02ft/1000ftc
| B |
| 1/5,000 |
| 2 sets, direct/reverse |
20 second rejection limit
| 0.1 ft |
| 0.02 ft or |
0.02ft/1000ftc
| C |
| 1/1,000 |
| 1 set, direct/reverse |
1 minute rejection limit
| 0.2 ft |
| 0.5ft/1000ftc |
| D |
| 1/300 |
| Foresight and backsight; 15 minute rejection limitc |
| 0.4 ft |
| 1.0ft/1000ftc |
| E |
| 1/100 |
| Foresight and backsight; 30 minute rejection limitc |
| 0.8 ft |
| 1.0ft/1000ftc |
a. Accuracy of offset measurement.
b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.
c. Use greater value.
Table 152-2 Cross section and slope stake tolerances.
| Item |
| Tolerances |
| A |
| B |
| C |
| D |
| E |
| Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves |
| (±)2o |
| (±)3o |
| (±)3o |
| (±)5o |
| (±)5o |
| Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed |
| 0.5 ft |
| 1.0 ft |
| 2.0 ft |
| 2.0 ft |
| 3.0 ft |
| Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater. |
| 0.1 ft or 0.4% |
| 0.15 ft or 0.6% |
| 0.2 ft or 1.0% |
| 0.2 ft or 1.0% |
| 0.3 ft or 1.0% |
Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.
| Slope reference stakes and slope stakes. |
| 0.1 ft or 0.4% |
| 0.15 ft or 0.6% |
| 0.2 ft or 1.0% |
| 0.2 ft or 1.0% |
| 0.3 ft or 1.0% |
| Clearing limits |
| 1.0 ft |
| 1.0 ft |
| 1.0 ft |
| 1.5 ft |
| 2.5 ft |
153 - Contractor Quality Control 153.02_nat_us_02_17_2005
153.02 Contractor Quality Control Plan.
Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.
153.04_nat_us_10_24_2007
153.04 Records.
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.
156 - Public…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .