Amendment-23-0002*** fabricate/install railings and fabricate scuba tank storage cages

Closed Solicitation Posted

Solicitation number
1305M2-23-Q-01261
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Beaufort, North Carolina 28516, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic Atmospheric Administration (NOAA) requires a contractor to upgrade and install new aluminum safety railings and handrails, and fabricate two scuba tank storage cages at the Hollings Marine Laboratory in Charleston, SC. The project, with an estimated value between $25,000 and $100,000, is set to be completed within the period of September 15, 2023, through September 14, 2024. The anticipated award date is on or about September 8, 2023.

Products and Services:

  1. Removal of current railings from building stairs, ramps, and walkways.
  2. Fabrication and installation of approximately 40’ Aluminum 1-1/2” pipe safety rails on Dock #1 and 57’ Aluminum 1-1/2” pipe safety rails on Dock #2.
  3. Fabrication and installation of approximately 150’ Aluminum 1-1/2” pipe safety rails on designated building.
  4. Fabrication of two 5’ x 3’ scuba tank storage cages with aluminum materials.
  5. Use of type 316 stainless steel hardware to attach all railings to dock and building, and type 410 stainless steel concrete anchoring screws where railing will be attached to dock and building.

Notice text

3 versions

Update #3 · Latest ·

***AMENDMENT A-23-0002***

***AMENDMENT A-23-0001***

The National Oceanic and Atmospheric Administration, National Ocean Service, National Centers for Coastal Ocean Science, Beaufort Laboratory, Beaufort, NC, has a requirement for fabrication/installation of ADA hand railing on two separate docks and one building and fabricate two scuba tank storage cages located at NOAA Beaufort Laboratory, 101 Pivers Island Road, Beaufort, NC 28516 in accordance with the attached Statement of Work. Period of Performance September 15, 2023 through September 14, 2024. See solicitation and supporting documents for further details.

***100% Small Business Set-Aside***

Update #2 ·

***AMENDMENT A-23-0001***

The National Oceanic and Atmospheric Administration, National Ocean Service, National Centers for Coastal Ocean Science, Beaufort Laboratory, Beaufort, NC, has a requirement for fabrication/installation of ADA hand railing on two separate docks and one building and fabricate two scuba tank storage cages located at NOAA Beaufort Laboratory, 101 Pivers Island Road, Beaufort, NC 28516 in accordance with the attached Statement of Work. Period of Performance September 15, 2023 through September 14, 2024. See solicitation and supporting documents for further details.

***100% Small Business Set-Aside***

Update #1 ·

The National Oceanic and Atmospheric Administration, National Ocean Service, National Centers for Coastal Ocean Science, Beaufort Laboratory, Beaufort, NC, has a requirement for fabrication/installation of ADA hand railing on two separate docks and one building and fabricate two scuba tank storage cages located at NOAA Beaufort Laboratory, 101 Pivers Island Road, Beaufort, NC 28516 in accordance with the attached Statement of Work. Period of Performance September 15, 2023 through September 14, 2024. See solicitation and supporting documents for further details.

***100% Small Business Set-Aside***

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors