EWP - Streambank Stabilization - Clay P4 - Sample, Brown, Adkins & Workman Sites - Clay County, West Virginia
Award Notice Posted
- Solicitation number
- 12SPEC18B0002
- Agency
-
Headquarters
National Resources Conservation Service, Department of Agriculture
- Awarded
- to Aspen Builders, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 12SPEC18C0004 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Clay County, West Virginia, United States
Notice details come from SAM.gov. Updated .
Notice text
The USDA NRCS is preparing to issue a solicitation for work authorized under the Emergency Watershed Protection Program to relieve imminent hazards to life and property due to a major flood event June 22-29, 2016, impacting Clay County, West Virginia.
The project consists of restoring and stabilizing approximately 570 feet of stream bank on 4 sites. The sites are on Dog Run, Porter Creek, and an unnamed tributary of Porter Creek in Clay County, West Virginia. Loose Rock Riprap and Wire Mesh Gabions will be installed to stabilize and protect the stream bank(s). Disturbed areas will be graded to provide positive drainage and seeded & mulched to provide permanent vegetative cover. If necessary, blockages will be removed to restore channel capacity.
The solicitation will be a Total Small Business set-aside. Interested contractors must be registered as Active, and must complete the annual representations and certifications electronically via the System for Award Management (SAM) at http://www.sam.gov in order to be eligible for award.
A firm fixed price construction contract is anticipated under Sealed Bidding procedures, FAR Part 14.
A bid guarantee, in the amount of 20% of the bid, is required to be submitted with each bid. Sureties should use SF-24 Bid Bond form.
Performance (SF-25) and Payment (SF-25A) Bonds, in the amount of 100% will be required within 7 calendar days of award of contract. All necessary permits and land rights have been acquired.
The solicitation package, construction drawings and specifications will be posted and available from this site on November 14, 2017. Bids will be due on Thursday, December 14, 2017, at 11:00 a.m. A site showing will be held on Tuesday, December 5, 2017 to review the site. Interested contractors should plan to meet at the Park and Ride at Clendenin Exit on I79 (Exit 19) at 10:00 a.m.
Performance time will be calendar 37 days.
Magnitude of proposed construction = $250,000 - $500,000
Files
| File | Type | Posted |
|---|---|---|
| BIDOPENINGRESULTS.pdf | ||
| Amendment_2_-_12SPEC18B0002.pdf | ||
| Amendment_1_-_12SPEC18B0002.pdf |
On GovTribe