Erskine Fire BAER Roads Rehabilitation Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- AG-9A40-S-17-0009
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- The project is located in Kern County on the Kern River Ranger District of the Sequoia National Forest/Giant Sequoia National Monument south of Lake Isabella. Primary access to the project area is via State Highway 178 from Bakersfield heading east or State Highway 178 from Ridgecrest heading west. Lake Isabella Ca Usa
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Solicitation documents are now available for downloading.
Update #1 ·
The propose of this project is to perform road reconditioning and drainage improvements on eight (8) roads for a total length of 13.5 miles. The project includes a base bid of five (5) roads totaling 11.2 miles plus three (3) optional roads totaling 2.3 miles. The roads are located within or adjacent to the Erskine Fire area which burned in July 2016. Contract work includes but is not limited to the following major items:
Unplug, clean, and recondition specified roadway drainage structures (rolling drainage dips, ditches, ditch relief and cross drainage culverts, and spillway inlets with flumes) to re-establish effective free flowing drainage of the areas, and reduce the potential of any culvert(s) becoming blocked during storm events; and install riprap at outlets, when specified.
Install Spillway Inlet Assembly (SIAs) with flume to reduce drainage diversion potential at culverts, and other specified areas.
Install rolling dips, armored rolling dips, and drainage armor (Class 2 riprap) as specified.
Recondition roadways with a 12' wide minimum travel way with 1' minimum shoulders each side unless noted on drawings; out-slope roadways where needed to minimize water concentration, erosion, and sediment production.
Files
| File | Type | Posted |
|---|---|---|
| Solicitation_Erskine_Fire_BAER.pdf | ||
| Wage_Determination.pdf | ||
| Drawings.pdf | ||
| Supplemental_Specs.pdf | ||
| Fire_Plan.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Erskine Fire BAER Roads Rehabilitation Project | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity