EMXG Equipment Modernization Support

Closed Pre-Solicitation Posted

Solicitation number
15739EMXG
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Hill Air Force Base, Utah 84056, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Materiel Command Air Force Sustainment Center is seeking sources for an Indefinite Delivery, Indefinite Quantity contract to provide comprehensive lifecycle management and decision support services to the 309th Electronics Maintenance Group at Hill Air Force Base, Utah, with responses due May 11, 2026. This is a new and distinct requirement, not a follow-on to existing contract FA822721D0004, though it incorporates scope currently performed elsewhere; the Government will use this sources sought market research to determine final acquisition strategy, including whether a small business set-aside is appropriate and will conduct best-value tradeoff source selection.

Work is performed at Hill AFB with normal operating hours Monday–Friday, 0700–1630 except federal holidays. The contractor shall deliver specialized engineering, technical, and analytical services to execute equipment modernization and replacement programs, with particular expertise required in depot-level Automated Test Equipment (ATE) including VDATS, CBATS, and R-IAIS platforms. Core activities span the full acquisition lifecycle: requirements definition and analysis, acquisition and procurement support, project and program management support, and technical and logistical support from concept through sustainment and disposal. Key deliverables include an Integrated Master Schedule, monthly status reports, GFE Loan and Inventory Status Reports, technical issue resolution and reverse engineering reports, technical data packages, and comprehensive project milestone documentation. Performance thresholds mandate 80% on-time Contract Data Requirements List delivery and 90% accuracy in GFE tracking. Staffing readiness must be achieved within 30–60 days depending on task order size. Contractor must comply with OPSEC training, CAC badging, FOD and tool control, mishap reporting, and CUI compliance requirements. NAICS code 541330 (Engineering Services); PSC R425.

Notice text

3 versions

Update #3 · Latest ·

Update 5/4/2026 Industry Questions:

Industry Questions:

Could you clarify if the current incumbent for these services is contract FA822721D0004?

This is not a follow-on effort for contract FA822721D0004

Additionally, I was wondering if there are any other incumbents currently performing portions of this scope, or if the Air Force is considering this a entirely new requirement?

While this requirement builds upon a portion of work currently being performed under an existing contract, it also incorporates a significant amount of new scope. Therefore, the Government is treating this as a new and distinct requirement.

The Government's intent is to conduct a best-value tradeoff source selection for this effort. The information received from this Sources Sought Notice will be used as market research to help determine the final acquisition strategy, including whether a small business set-aside is appropriate.

**************************************

Original Notice 4/27/2026: Sources Sought synopsis to determine potential sources for information and planning purposes.

Program Details: This requirement will be placed as an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to acquire comprehensive lifecycle management and decision support services. The primary purpose of this contract is to provide the 309th Electronics Maintenance Group (309 EMXG) with the specialized engineering, technical, and analytical services necessary to successfully execute its equipment modernization and replacement programs. The contractor shall deliver the data-driven analysis and professional documentation required to support sound investment decisions at every stage of a project's lifecycle, from initial concept and requirements definition through sustainment and eventual disposal.

If your company is capable of performing this work, please provide the below information.

Part 1: Company Profile & Contract Vehicles

Company Information: Company Name, CAGE Code, Point of Contact (Name, Phone, Email).
Business Size & Status: Indicate your company's size status under NAICS code 541330
Part 2: Capability & Relevant Experience

Note: Limit responses to 3-5 pages for this section

Please provide a brief Capability Statement addressing your firm's ability to execute the requirements in the draft PWS. Specifically, provide examples of past performance (within the last 3-5 years) demonstrating:

ATE Expertise: Experience with the architecture, operation, and maintenance of depot-level Automated Test Equipment (ATE), specifically mentioning any experience with VDATS, CBATS, or R-IAIS.
Deliverable-Based Project Management: Experience managing complex equipment modernization projects through a milestone-driven, deliverable-based lifecycle (from Requirements Identification to Full Operational Capability) rather than as a level-of-effort/staff-augmentation contract.
Reverse Engineering & Technical Data: Experience evaluating incomplete Technical Data Packages (TDPs) and performing reverse engineering of components/circuit cards to generate acquisition-ready technical data.
Logistics & GFE Management: Experience tracking, auditing, and managing Government Furnished Equipment (GFE) across multiple projects.
Part 3: Feedback on the Draft PWS & Acquisition Strategy

The Government is specifically seeking industry feedback on the drafted Performance Work Statement (PWS). Please review the attached draft and provide responses to the following:

Performance-Based Structure: The Government intends to structure this as a completion-based contract tied to the delivery of specific Contract Data Requirements Lists (CDRLs) at 8 defined project milestones. Does the PWS provide sufficient detail for your company to accurately estimate the level of effort and propose Firm-Fixed-Price (FFP) costs for specific milestones? If not, what specific information is missing?
Milestone Logic: Do the 8 milestones outlined in Section 4.5 follow a logical progression for hardware/ATE modernization? Are there any critical acquisition or engineering steps missing, or any that seem redundant?
Service Summary (Acceptable Quality Levels): Are the performance thresholds (e.g., 95% on-time delivery, 90% first-pass acceptance) outlined in the Service Summary realistic and achievable? How would you recommend the Government measure/surveil the "Engineering Functions"?
Transition to Deliverables: Given that the Government is strictly avoiding an Advisory and Assistance Services (A&AS) or "staff augmentation" environment, do any sections of the PWS still read as overly prescriptive (dictating how to do the work rather than what to deliver)?
Cost Drivers & Risks: Based on your reading of the PWS, what do you identify as the highest risk elements or primary cost drivers for this effort?
General Recommendations: Please provide any other recommendations, questions, or concerns regarding the draft PWS or the anticipated Indefinite Delivery Indefinite Quantity (IDIQ) structure.
If interested and capable of performing this requirement, please provide responses along with the requested information no later than 4 PM, Mountain Daylight Time, Monday May 11th, 2026, to Hayden Thurston at hayden.thurston@us.af.mil or Nate Littlewood at nathanial.littlewood@us.af.mil

Attachment:

Performance-Based Work Statement

Update #2 ·

Notice: Sources Sought synopsis to determine potential sources for information and planning purposes.

Program Details: This requirement will be placed as an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to acquire comprehensive lifecycle management and decision support services. The primary purpose of this contract is to provide the 309th Electronics Maintenance Group (309 EMXG) with the specialized engineering, technical, and analytical services necessary to successfully execute its equipment modernization and replacement programs. The contractor shall deliver the data-driven analysis and professional documentation required to support sound investment decisions at every stage of a project's lifecycle, from initial concept and requirements definition through sustainment and eventual disposal.

If your company is capable of performing this work, please provide the below information.

Part 1: Company Profile & Contract Vehicles

Company Information: Company Name, CAGE Code, Point of Contact (Name, Phone, Email).
Business Size & Status: Indicate your company's size status under NAICS code 541330
Part 2: Capability & Relevant Experience

Note: Limit responses to 3-5 pages for this section

Please provide a brief Capability Statement addressing your firm's ability to execute the requirements in the draft PWS. Specifically, provide examples of past performance (within the last 3-5 years) demonstrating:

ATE Expertise: Experience with the architecture, operation, and maintenance of depot-level Automated Test Equipment (ATE), specifically mentioning any experience with VDATS, CBATS, or R-IAIS.
Deliverable-Based Project Management: Experience managing complex equipment modernization projects through a milestone-driven, deliverable-based lifecycle (from Requirements Identification to Full Operational Capability) rather than as a level-of-effort/staff-augmentation contract.
Reverse Engineering & Technical Data: Experience evaluating incomplete Technical Data Packages (TDPs) and performing reverse engineering of components/circuit cards to generate acquisition-ready technical data.
Logistics & GFE Management: Experience tracking, auditing, and managing Government Furnished Equipment (GFE) across multiple projects.
Part 3: Feedback on the Draft PWS & Acquisition Strategy

The Government is specifically seeking industry feedback on the drafted Performance Work Statement (PWS). Please review the attached draft and provide responses to the following:

Performance-Based Structure: The Government intends to structure this as a completion-based contract tied to the delivery of specific Contract Data Requirements Lists (CDRLs) at 8 defined project milestones. Does the PWS provide sufficient detail for your company to accurately estimate the level of effort and propose Firm-Fixed-Price (FFP) costs for specific milestones? If not, what specific information is missing?
Milestone Logic: Do the 8 milestones outlined in Section 4.5 follow a logical progression for hardware/ATE modernization? Are there any critical acquisition or engineering steps missing, or any that seem redundant?
Service Summary (Acceptable Quality Levels): Are the performance thresholds (e.g., 95% on-time delivery, 90% first-pass acceptance) outlined in the Service Summary realistic and achievable? How would you recommend the Government measure/surveil the "Engineering Functions"?
Transition to Deliverables: Given that the Government is strictly avoiding an Advisory and Assistance Services (A&AS) or "staff augmentation" environment, do any sections of the PWS still read as overly prescriptive (dictating how to do the work rather than what to deliver)?
Cost Drivers & Risks: Based on your reading of the PWS, what do you identify as the highest risk elements or primary cost drivers for this effort?
General Recommendations: Please provide any other recommendations, questions, or concerns regarding the draft PWS or the anticipated Indefinite Delivery Indefinite Quantity (IDIQ) structure.
If interested and capable of performing this requirement, please provide responses along with the requested information no later than 4 PM, Mountain Daylight Time, Monday May 11th, 2026, to Hayden Thurston at hayden.thurston@us.af.mil or Nate Littlewood at nathanial.littlewood@us.af.mil

Attachment:

Performance-Based Work Statement

Update #1 ·

Notice: Sources Sought synopsis to determine potential sources for information and planning purposes.

Program Details: This requirement will be placed as an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to acquire comprehensive lifecycle management and decision support services. The primary purpose of this contract is to provide the 309th Electronics Maintenance Group (309 EMXG) with the specialized engineering, technical, and analytical services necessary to successfully execute its equipment modernization and replacement programs. The contractor shall deliver the data-driven analysis and professional documentation required to support sound investment decisions at every stage of a project's lifecycle, from initial concept and requirements definition through sustainment and eventual disposal.

If your company is capable of performing this work, please provide the below information.

Part 1: Company Profile & Contract Vehicles

Company Information: Company Name, CAGE Code, Point of Contact (Name, Phone, Email).
Business Size & Status: Indicate your company's size status under NAICS code 541330
Part 2: Capability & Relevant Experience

Note: Limit responses to 3-5 pages for this section

Please provide a brief Capability Statement addressing your firm's ability to execute the requirements in the draft PWS. Specifically, provide examples of past performance (within the last 3-5 years) demonstrating:

ATE Expertise: Experience with the architecture, operation, and maintenance of depot-level Automated Test Equipment (ATE), specifically mentioning any experience with VDATS, CBATS, or R-IAIS.
Deliverable-Based Project Management: Experience managing complex equipment modernization projects through a milestone-driven, deliverable-based lifecycle (from Requirements Identification to Full Operational Capability) rather than as a level-of-effort/staff-augmentation contract.
Reverse Engineering & Technical Data: Experience evaluating incomplete Technical Data Packages (TDPs) and performing reverse engineering of components/circuit cards to generate acquisition-ready technical data.
Logistics & GFE Management: Experience tracking, auditing, and managing Government Furnished Equipment (GFE) across multiple projects.
Part 3: Feedback on the Draft PWS & Acquisition Strategy

The Government is specifically seeking industry feedback on the drafted Performance Work Statement (PWS). Please review the attached draft and provide responses to the following:

Performance-Based Structure: The Government intends to structure this as a completion-based contract tied to the delivery of specific Contract Data Requirements Lists (CDRLs) at 8 defined project milestones. Does the PWS provide sufficient detail for your company to accurately estimate the level of effort and propose Firm-Fixed-Price (FFP) costs for specific milestones? If not, what specific information is missing?
Milestone Logic: Do the 8 milestones outlined in Section 4.5 follow a logical progression for hardware/ATE modernization? Are there any critical acquisition or engineering steps missing, or any that seem redundant?
Service Summary (Acceptable Quality Levels): Are the performance thresholds (e.g., 95% on-time delivery, 90% first-pass acceptance) outlined in the Service Summary realistic and achievable? How would you recommend the Government measure/surveil the "Engineering Functions"?
Transition to Deliverables: Given that the Government is strictly avoiding an Advisory and Assistance Services (A&AS) or "staff augmentation" environment, do any sections of the PWS still read as overly prescriptive (dictating how to do the work rather than what to deliver)?
Cost Drivers & Risks: Based on your reading of the PWS, what do you identify as the highest risk elements or primary cost drivers for this effort?
General Recommendations: Please provide any other recommendations, questions, or concerns regarding the draft PWS or the anticipated Indefinite Delivery Indefinite Quantity (IDIQ) structure.
If interested and capable of performing this requirement, please provide responses along with the requested information no later than 4 PM, Mountain Daylight Time, Monday May 11th, 2026, to Hayden Thurston at hayden.thruston@us.af.mil or Nate Littlewood at nathanial.littlewood@us.af.mil

Attachment:

Performance-Based Work Statement

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
SABER V Hill AFB NAICS 236220 Air Force Sustainment Center Competitive 8(a)
AIS Engineering Services for ATE Hill Air Force Base, Utah 84056, United States · NAICS 541330 Air Force Sustainment Center No set-aside
HAFB Multiple Award Construction Contract V (MACC V) Hill AFB, UT (Davis County) Utah Test and Training Range (Uttr) Little Mountain Test Facility (Lmtf) Utah Air National Guard (Utang) Base Boulder Seismic Site, WY Other: Geographically separated units (GSU) under the responsibility of 75 ABW/CC · NAICS 236220 Air Force Sustainment Center Total Small Business
84 Radar Evaluation Squadron (RADES) Support Hill Air Force Base, Utah 84056, United States · NAICS 541330 Air Combat Command No set-aside
Automated Storage Module (ASM) Hardware for Hill AFB Hill Air Force Base, Utah 84056, United States · NAICS 541519 Defense Logistics Agency No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity