Electrical Work at the Bridger Plant Materials Center, Bridger, Montana
Closed Solicitation Posted
- Solicitation number
- 12FPC326Q0002
- Agency
-
Farm Production and Conservation
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Bridger, Montana 59014, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Department of Agriculture Natural Resources Conservation Service (NRCS) is soliciting electrical contracting services to install three-phase power infrastructure at the Bridger Plant Materials Center in Bridger, Montana. The scope of work includes installing approximately 65 feet of exterior conduit from the main distribution panel to a new 100-amp three-phase subpanel, relocating the forklift breaker and installing new wiring to an existing forklift charging receptacle, and providing complete electrical wiring for a new walk-in seed cooler with surface-mount conduit and service disconnect switch. Contractors must complete all work within 30 calendar days of contract award and provide a one-year warranty on all materials and work performed. The contractor must employ a certified electrician with at least five years of experience in electrical and masonry work and provide a statement of insurance. Award will be made to the responsible quoter offering the best value based on price alone using the provided Quote Sheet. Questions must be submitted by February 23, 2026, at 3:00 PM Eastern Time, and all offers are due by March 3, 2026, at 3:00 PM Eastern Time.
This solicitation is a 100% Total Small Business set-aside under NAICS Code 238210 with a small business size standard of $19.0 million, and no incumbent or current contractor information is identified in the solicitation documents. The estimated project value is under $10,000, with work to be performed on a firm-fixed-price basis using a single line item covering all electrical installation work. The contract will be awarded to one firm, and all work must be completed within 30 calendar days of contract award, with work authorized for up to ten hours per day, Monday through Friday, excluding federal holidays. The place of performance is the Bridger Plant Materials Center located at 98 South River Road, Bridger, Montana 59014. Active registration in the System for Award Management (SAM) is required for contract award and must remain active throughout performance.
Notice text
Please see Attaachment 1 Statement of Work for further detailed description of services.
This work is for the United States Department of Agriculture - Natural Resources Conservation
Service (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT
59014-9718. The work is to run three-phase power from the main distribution panel to a subpanel, to
power an existing outlet for charging a forklift and to install a new connection for the new
walk-in seed cooler.
The Contractor shall:
Install conduit on the exterior of the building from the main distribution panel (MDP) unit to the
interior wall behind the walk-in cooler, an approximate distance of 65 feet (from the 100amp panel
to the disconnect of the cooler is a total of 25 feet). The exterior wall is tin with insulation
and osb/plywood; interior walls are tin with insulation. Install a 100amp three-phase service feed
from the MDP to a new 100amp three-phase panel located next to the existing electric forklift
receptacle. Conduit raceway will be metal EMT and Wire conductors will be copper THHN.
Remove the forklift breaker from the outdoor MDP and install a new 100amp Three Phase breaker in
place. Re-feed the forklift disconnect out of the new 100amp sub panel to the existing forklift
receptable, installing new solid conduit, wiring, and receptacle if required. Subpanel is 3 feet
from the forklift.
Provide for electrical wiring of the Walk-in Cooler. Install a surface mount conduit from the new
Three Phase sub panel to the Walk-in Cooler area. Install a service disconnect switch for the
Walk-in
Cooler. Wire from the service disconnect to the already pre-wired control panel located on the
Walk-in Cooler. Note: Start up and testing of the Walk-in Cooler to be done by a separate HVAC
Contractor provided by the owner.
Dispose or recycle all materials removed from the site. Clean all spaces associated with the work.
Timely completion of deliverables is essential to a successful outcome. All work must be completed
within 30 calendar days of the contract being awarded.
All the materials and work required and performed by the contractors must be warrantied for one
year
from the date of completion of the project.
Files
| File | Type | Posted |
|---|---|---|
| Attachment 4 -WD 2015-5389 Rev. 27 12-3-2025.pdf | ||
| Attachment 1 - Bridger PMC_Electrical_SOW.pdf | ||
| Attachment 3 Vendor Information Sheet.docx | DOCX document | |
| Attachment 2 Quote Sheet.docx | DOCX document | |
| S01 - 12FPC326Q0002 Combined Synopsis Solicitation.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements | Forest Service | Total Small Business | |
| Fernan Ranger Station lift station electrical repair | Region 1 - Northern Region | Total Small Business | |
| ID-KOOSKIA NFH-Repair Electrical Service to Mechan | — | Total Small Business | |
| GAOA Star Meadows MEP Repairs Utility Installations Flathead NF | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity