S01 - 12FPC326Q0002 Combined Synopsis Solicitation.pdf

PDF 193 KB Posted

Attached to
Electrical Work at the Bridger Plant Materials Center, Bridger, Montana
Solicitation number
12FPC326Q0002
Issued by

About this file

This is a Combined Synopsis/Solicitation (RFQ) issued by the United States Department of Agriculture Natural Resources Conservation Service (NRCS) for electrical work at the Bridger Plant Materials Center in Bridger, Montana. The solicitation number is 12FPC326Q0002, with offers due March 3, 2026, at 3:00 PM Eastern Time. This is a 100% Total Small Business set-aside under NAICS Code 238210 (Electrical Contractors and Other Wiring Installation Contractors), with a small business size standard of $19.0 million. The estimated project value is under $10,000, and the Government anticipates awarding one firm fixed-price contract to the responsible quoter offering the best value based on price alone. All work must be completed within 30 calendar days of contract award, with a one-year warranty on all materials and work performed.

The contractor must install three-phase electrical power infrastructure at the facility, including running conduit approximately 65 feet from the main distribution panel to a new 100-amp three-phase subpanel, relocating the forklift breaker and installing new wiring to an existing forklift charging receptacle, and providing complete electrical wiring for a new walk-in seed cooler with surface-mount conduit and service disconnect switch. The contractor is responsible for providing all supervision, labor, tools, equipment, transportation, and materials; complying with federal, state, and local construction and safety laws; managing equipment on-site; and removing all debris. Site visits are available by scheduling with onsite point of contact Monica Pokorny at monica.pokorny@usda.gov. Quoters must submit pricing using the provided Quote Sheet (Attachment 2) via email to Mark Domingo, Contract Specialist, at mark.domingo@usda.gov. Questions must be submitted by February 23, 2026, at 3:00 PM ET. Applicable FAR and AGAR clauses govern the solicitation, including Service Contract Labor Standards provisions with wage determinations incorporated by reference. Active SAM registration is required for contract award and must remain active throughout performance.

View the file

Other files

File Type Posted
Attachment 1 - Bridger PMC_Electrical_SOW.pdf PDF
Attachment 4 -WD 2015-5389 Rev. 27 12-3-2025.pdf PDF
Attachment 2 Quote Sheet.docx DOCX document
Attachment 3 Vendor Information Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICTITATION

12FPC326Q0002

For Electrical Work at the Bridger Plant Materials Center, Bridger, Montana

General Information Date Offers are Due: March 3, 2026 Time Offers are Due: 3:00pm ET

Classification Set-Aside: 100% Total Small Business

Product Service Code: N059 (Installation of Equipment – Electronic Equipment Components).

NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors.

Place of Performance/Location: Natural Resources Conservation Service (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT 59014-9718.

Description

See Attachment 1 Statement of Work for further details.

This work is for the United States Department of Agriculture - Natural Resources Conservation Service (NRCS) Bridger Plant Materials Center (PMC), located at 98 South River Rd., Bridger, MT 59014-9718.

The work is to run three-phase power from the main distribution panel to a subpanel, to power an existing outlet for charging a forklift and to install a new connection for the new walk-in seed cooler.

The Contractor shall:

Install conduit on the exterior of the building from the main distribution panel (MDP) unit to the interior wall behind the walk-in cooler, an approximate distance of 65 feet (from the 100amp panel to the disconnect of the cooler is a total of 25 feet). The exterior wall is tin with insulation and osb/plywood; interior walls are tin with insulation. Install a 100amp three-phase service feed from the MDP to a new 100amp three-phase panel located next to the existing electric forklift receptacle.

Conduit raceway will be metal EMT and Wire conductors will be copper THHN.

Remove the forklift breaker from the outdoor MDP and install a new 100amp Three Phase breaker in place. Re-feed the forklift disconnect out of the new 100amp sub panel to the existing forklift receptable, installing new solid conduit, wiring, and receptacle if required. Subpanel is 3 feet from the forklift.

Provide for electrical wiring of the Walk-in Cooler. Install a surface mount conduit from the new Three Phase sub panel to the Walk-in Cooler area. Install a service disconnect switch for the Walk-in Cooler. Wire from the service disconnect to the already pre-wired control panel located on the

Walk-in Cooler. Note: Start up and testing of the Walk-in Cooler to be done by a separate HVAC Contractor provided by the owner.

Dispose or recycle all materials removed from the site. Clean all spaces associated with the work.

Timely completion of deliverables is essential to a successful outcome. All work must be completed within 30 calendar days of the contract being awarded.

All the materials and work required and performed by the contractors must be warrantied for one year from the date of completion of the project.

CONTRACTOR RESPONSIBILITIES:

3 Provide all supervision, labor, tools, equipment, transportation, and material necessary to perform the work 4 Follow industry standards, all federal and state, and local construction, safety and labor laws.

5 Contractor is responsible for their equipment on the PMC grounds. The Government is not liable for damages or losses of equipment due to theft or vandalism.

6 Remove all debris and excess materials from the site and dispose of them properly.

SITE VISITS.

Interested vendors can review the work site by scheduling a time with the onsite POC before offers are due. Review of the work site is not mandatory. Onsite POC: Monica Pokorny at monica.pokorny@usda.gov

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, offers are being requested and a separate written solicitation will not be issued.

The solicitation number 12FPC326Q0002 is issued as a Request for Quotation (RFQ). The acquisition procedures at FAR Parts 12 are being utilized. The Government anticipates the award of one firm fixed-priced contract resulting from this solicitation. Award will be made to the responsible quoter whose quote responds to the terms of this RFQ and is the best value for the Government.

This acquisition is being set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov.

The applicable North American Classification System Code (NAICS) is 238210 - Electrical Contractors and Other Wiring Installation Contractors; the small business size standard is $19.0M. For more information on size standards visit http://www.sba.gov/size. Active SAM registration is required in order to be awarded this contract and must remain active throughout the period of performance. All responsible sources may submit a quotation which may be considered by the agency.

Federal Acquisition Regulations (FAR) and the United States Department of Agriculture Acquisition Regulations (AGAR) Clause and Provisions: The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions. Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting Officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these requirements in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at:

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

The following clauses are mandatory in all solicitations and contracts

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025)

☐ Alternate I (Nov 2025) of 52.212-4 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025)

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable:

52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 52.204-13 System for Award Management—Maintenance (Nov 2025) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) 52.219-6 Notice of Total Small Business Aside (Nov 2025) 52.219-8 Utilization of Small Business Concerns (Nov 2025) 52.219-9 Small Business Subcontracting Plan (Nov 2025) 52.219-14 Limitations on Subcontracting (Nov 2025) 52.222-3 Convict Labor (June 2003)

52.222-35 Equal Opportunity for Veterans (Nov 2025) 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) 52.222-37 Employment Reports on Veterans (Nov 2025) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-54 Employment Eligibility Verification (Nov 2025) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.224-3 Privacy Training (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) 52.240-92 Security Requirements (Nov 2025) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (No 2025)

The Contractor shall comply with the following FAR Clauses for Commercial Services:

52.222-41 Service Contract Labor Standards (Aug 2018) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

Other Applicable Clauses

52.216-1 Type of Contract (NOV 2025) The Government contemplates award of one firm fixed-priced contract resulting from this solicitation.

CONTRACTING OFFICER’S AUTHORITY

The Contracting Officer (CO) is the only person authorized to approve changes in any of the requirements of this contract. This authority remains solely with the CO. In the event that the Contractor effects any change at the direction of any person other than the CO, the change will be considered to have been made without authority and NO adjustment will be made in the contract price to cover any INCREASE in costs incurred as a result thereof.

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PAYMENT PLATFORM (IPP)

Invoices must be submitted electronically through the U.S. Department of the Treasury’s Invoice Payment Platform System (IPP) or the Contractor must be willing to accept payment by Government purchase card.

The Contractor must use the IPP website (https://www.ipp.gov) to register, access, and use IPP for submitting invoices. Contractor assistance with enrollment can be obtained by calling (866) 973-3131.

Invoices submitted by means other than IPP will not be accepted unless the Contracting Officer authorizes alternate procedures in writing.

AGAR Clauses

452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)

(a) By entering into this contract, the Contractor certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution, and the Contractor and any subcontractor or teaming partner will not do so for the duration of the contract.

(b) If the Contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the Contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The Contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the Contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to Contractor’s compliance with the above requirements and/or eligibility for the contract may subject the Contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) The Contractor must include the provisions of this clause in all subcontract solicitations.

(g) Failure on the part of the Contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.

452.204–70 Modification for Contract Closeout (Nov 2025)

(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The Contracting Officer shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The Contracting Officer may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 60 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a ‘‘Contractor Release of Claims’’ and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the

Contracting Officer within 120 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.

Solicitation Information

Award Type It is anticipated that a Firm-Fixed Price award consisting of one (1) base period. The Government intends to make one award from this solicitation.

The provision at FAR 52.212-2, Evaluation - Commercial Products and Commercial Services is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government.

The Government will award one (1) Firm Fixed Price contract resulting from this solicitation.

Award will be made to:

The Government will evaluate quotes in response to this solicitation without discussions and will award a contract to the responsible quoter whose quote, conforming to the solicitation, will be most advantageous to the Government, considering only price.

The Government may reject a quote if the prices quoted are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated quote, or if it is so unbalanced as to be tantamount to allowing an advance payment. Potential unbalanced pricing will be evaluated consistent with FAR 15.404-1(g).

The Government may reject a quote if the prices quoted are unrealistically low. Price/cost realism analysis is the process of independently reviewing and evaluating specific elements of each quoter’s proposed price to determine whether the estimated prices are realistic for the work to be performed;

reflect a clear understanding of the requirements. Quotes that are determined to be unrealistically low are considered a performance risk and may be rejected by the Government. Price/cost realism analysis will be evaluated consistent with FAR 15.404-1(d).

Service Contract Labor Standards The Service Contract Labor Standards apply to any contracts awarded through this solicitation. In accordance with (IAW) FAR 22.1002-3(a)(2), the place of performance for this contract is throughout the state of Utah. The Contracting Officer has determined the places of performance and has listed below and included wage determinations for each place as an attachment to this solicitation:

Service Contract Labor Standards Wage Determinations The following Department of Labor wage determinations are incorporated into this contract. Wage determinations may be found at: https://sam.gov/wage-determinations

Wage Determinations: 2015-5389 Rev. 27 Dated 12-3-2025

Qualification Requirements

Offerors, or the product or service, ARE required to meet a qualification requirement to be eligible for award. Qualification requirements are described in Attachment 1 Statement of Work for Electrical Work at the Bridger Plant Materials Center, Bridger, Montana

52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025)

FAR 52.212-1 is amended as follows:

Questions shall be submitted via email to mark.domingo@usda.gov and are due no later than February 23, 2026, at 3:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017)

52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)

The following provisions are applicable:

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions

(Sep 2024) 52.204-7 System for Award Management—Registration (Nov 2025) 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025)

Other Applicable FAR Provisions 52.217-5 Evaluation of Options (Nov 2025) 52.233-2 Service of Protest (Sep 2025)

AGAR Provisions

452.203-70 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Certification (Dec 2025)

(a) By submission of its offer, the offeror certifies that:

(3) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution.

(4) Neither it nor any proposed subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S. Constitution.

(b) If the offeror participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, by submission of its offer, the offeror certifies that it is compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.

(c) The offeror affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the offeror will not be eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.

(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.

(e) Submission of a knowing false statement relating to offeror’s compliance with the above requirements and/or eligibility for the contract may subject the offeror to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.

(f) Failure on the part of the offeror or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate the contract for default.

Additional Information for Offerors:

Period of Performance The Period of Performance is all work must be completed within 30 calendar days of the contract being awarded.

The estimated value of this project is under $10,000.

Please refer to the following documents which are hereby incorporated and made a part of this solicitation:

• Attachment 1 – Work Statement (3 pages)

• Attachment 2 – Quote Sheet (1 page)

• Attachment 3 – Vendor Information Sheet (1 page)

• Attachment 4 – Applicable Wage Determination(s) (10 pages)

Quotes are due no later than March 3, 2026, 3:00pm ET.

Emailed quotes will be accepted. Quotes shall be submitted on company letterhead, signed, dated and sent via email to Mark Domingo, Contract Specialist at mark.domingo@usda.gov no later than March 3, 2026, 3:00pm ET.

Quoters shall utilize Attachment 2 to this solicitation to submit their pricing quotations.

The Government intends to make an award based on the best value to the Government.

Any questions must be submitted in writing to Mark Domingo, Contract Specialist, at mark.domingo@usda.gov no later than February 23, 2026, 3:00pm ET.

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Ombudsman Program

The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner.

The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO).

Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.

Informal Forum with the Ombudsman

1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.

2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.

3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman

1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.

2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.

3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.

4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3). Failure to submit the required information may result in a delay or dismissal of the protest.

5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.