Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912WJ26X1BCU
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
Thomaston, Connecticut, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New England District is seeking construction services for electrical feeder upgrades at Black Rock Lake Dam in Thomaston, Connecticut through this Sources Sought announcement. The procurement is specifically targeted at 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned, and Small Business concerns to assess their interest and capability for the project. The work includes replacing existing overhead and buried electrical feeders with new underground conduit duct banks, removing and replacing manual transfer switches and electrical panels, and installing a new propane generator system with automatic transfer switch capabilities to provide backup power during utility outages. Interested firms must submit a capabilities package by April 6, 2026, limited to twenty pages and including business classification, qualifications, at least two specific project examples from the past seven years, subcontractor information, and proof of bonding capability. The evaluation will assess the contractor's qualifications, relevant project experience, subcontractor capabilities, and bonding capacity to complete the work.

This procurement utilizes no set-aside designation, and no incumbent contractor information is provided in the notice. The estimated construction cost ranges between $1,000,000 and $5,000,000, with the formal solicitation planned for release in Fall 2026 and construction activities scheduled to occur during Fall and Winter 2026. The project involves work at Black Rock Lake Dam, an earthfill structure 933 feet long and 154 feet high situated on Branch Brook in the Naugatuck River Basin, with the place of performance designated as the New England District office in Concord, Massachusetts. The NAICS code assigned to this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors), and interested contractors should submit their capabilities packages to Kayla.Gonsalves@usace.army.mil in one original and one copy format.

Notice text

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services for the Electrical Feeder Upgrades at Black Rock Lake Dam in Thomaston, Connecticut.  This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned,Women-Owned and Small Business concerns for this project.  The NAICS code for this procurement is 238210.  The project is planned to be issued in the Fall of 2026 with construction to take place in the Fall/Winter of 2026. The estimated construction cost is between $1,000,000 - $5,000,000.

Black Rock Lake Dam is situated on Branch Brook and is a part of a network of flood control dams and local protection projects built by the U.S. Army Corps of Engineers in the Naugatuck River Basin. The construction started in July 1967 and was completed in July 1971. It was built in response to the destructive flood of 1955.

The dam is located adjacent to Black Rock State Park along the Thomaston-Watertown line. The reservoir is on Route 109, two miles west of Thomaston and within one mile of the intersection of Route 8 and U.S. Route 6. The project consists of an earthfill dam with stone slope protection 933-feet long and 154-feet high; a gated 704-foot-long circular concrete conduit four feet wide and five feet high; and a concrete chute spillway channel with a 140-foot-long weir. The weir’s crest elevation is 20 feet lower than the top of the dam. About 1.9 miles of Route 109 were relocated to accommodate the project.

The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut.  Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.

The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new.  The fused disconnect at the existing overhead line end will be removed.  The existing manual transfer switches in the gate tower and project office will be removed.  The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new.  The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot.  Install a new propane tank with an underground propane line connected to the genset.  The new genset will be sized to power both the project office and the gate tower on loss of utility.  The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset. 

Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above.  Please include at least two specific examples of the firm’s experience performing the work requirements stated above.  The projects must have been performed within the last seven years.  Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror’s effort and their experience must also have been performed within the last seven years.  Proof of bonding capability is required.   Responses are limited to twenty pages.  Responses are due by 6 April 2026.  Responses should be emailed to:

Kayla.Gonsalves@usace.army.mil

Phone Contact: (978) 318-8256

Interested firms shall provide the above documentation in one original form and one copy.  The Government will not pay for any material provided in response to this market survey nor return the data provided.  This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation.  The results of this survey will be considered to be in effect for a period of one year from the date of this notice. 

Government Agency URL: www.nae.usace.army.mil 

Government Agency URL Description: New England District, Corps of Engineers

Files

File Type Posted
Sources Sought.pdf PDF

Notice history

Notice Type Posted
Electrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticut Award Award Notice
Electrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticut Latest solicitation Solicitation
Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business
Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH Surry, New Hampshire, United States · NAICS 237990 ENDIST New England No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors